CONSTRUCTION SPECIFICATIONS Textile Fibers Laboratory, Building 727
Technical Center, South Charleston, West Virginia
DIVISION I? - MECHANICAL Section 15-C Thermal Insulation
Page 1 of 1
SECTION 15-C THERMAL INSULATION
1. SCOPE OF WORK
A. The work under this Division Includes the furnishing of all supervision, labor, materials, tools, and equipment necessary for, and Incidental to, application of all thermal insulation as shown or called for on the Drawings, and specified in the Owner's insulation Specifications.
B. The following items of related work are Included In other divisions of these specifications:
(l) Roof insulation. Division 7, Section A.
2. RESPONSIBILITY FOR MATERIALS A. The Contractor shall furnish all materials.
3. MATERIALS
Insulatlo^/i A.
cations 10L, and made a
lain ^hallfbe in ^accordance/ rlth Owner's Specific
, 15K, 178*, 18 BY, and 23HT, which are Included
Vof Inese specifications.
h. APPLICATION
A. Insulation shall be applied in accordance with Instructions and details given in the numbered Insulation Specifications in
Paragraph 3 and the General Insulation Specifications which are
Included and made a part of these specifications.
B. Type and thickness of insulation shall be as shown or called for on the Drawings.
C. Insulation shall not be installed until after respective piping systems have been tested and approved. Where Contractor does otherwise, it shall be his responsibility to remove and replace the Insulation at his own expense.