Document dapN61ogVgGY70VZZe4n8Ndy5

Parham, Greg From: To: Cc: Subject: Date: Priority: Munsell, Peggy Parham, Greg Castor, Larry High Velocity Flue Thursday, October 24, 1996 4:39PM High PLAINTIFF'S EXHIBIT ASA-1391 Greg, The sampling I've performed showed that the venturi(s) both north and south contained asbestos. Those are now down on the ground, and they will need to have this material removed prior to disposal. That was the only material I'd identified on the "horizontal" section of the flue as asbestos. The vertical section of the flue was not sampled. Because portions of the vertical flue were also removed, I will need to look around the staging area to make sure none of the other material is asbestos. It is very hard to move around the staging area safely the way it is stacked in there. I need to get with you and take a look in this area. Page 1 ASARCO ELP 0010689