ASBESTOS IKSULATIOK - STATUS REPORT
,,
,`
'
As of the date of this report, the Insulator Shop has discontinued the |
installation of most asbestos-bearing pipe insulation. In cases where ' the service requirements are greater than lS'OO^E., we are still installing Kaylo 20, a calcium silicate, asbestos reinforced material. This use is limited, mostly, to tube-turns on LIIP crocking furnaces* This work only comprises about 2% of the jobs we currently install. Tills is expected to continue .until an adequate high temperature substitute is found.
All of the Kaylo, a calcium silicate asbestos-filled insulation for
temperatures to 1200*F., has been removed from the shelves in the shops
and has been returned t-e locations as directed by Stores. The field
stocks are being shipped to Stores as they are located. It is felt that
approximately 80% of these field stocks have been removed to date. VJe
are still in the process of locating and eliminating these small amounts
of material.
"
* r'
.
i.
..
. -
.
Engineering standards of E & CS and Texas Division are in the process of.
being revised. It is felt that finalisation of these standards will take
about eight weeks longer- Contractors are still being allowed to install
Kaylo and Kayla 20 on new construction although mast of the new iustnl- '
lations are in Carey-temp, a non-asbestos material,
.
Technical Development is working in the area of finding substitutes for,
.materials which contain asbestos such as transits, haveg, etc* '
*
It Is felt at this time that existing safety rules regarding the use of
respirators for. "hazardous dusts" are adequate to require the use of
respirators by all personnel when dismantling the existing insulation__ materials. Subsequent to additional talks with .the'Safety Department^
we expect to formally communicate with all supervisors involved. 'The a
Functional Superintendents have already talked with the Zone Superin- cd
tendonts regarding the use of respirators, when handling these products
m.
co
We had some minor difficulties with Purchasing*s getting us into the -- Carey-temp business, but these were ironed out quickly, I feel that. 1
we are .now ''over the hump" as far as the change aver occurs. There are
a great many loose ends which still need to be gathered up, I will keep
you informed as, we= change, specifications, types of materials handling,
procedures, etc*