Document daJVmQxmEOgeEVN45JQrGmjRe

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 1/9/2020 Water Brine - CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: Petco Petroleum Corporation Unknown 36.029807, -96.597903 (Sect. 20, T 18N, R 7E) Oilton, Oklahoma 74052 10300 Greenbriar Place Oklahoma City, Oklahoma 73159 Creek County 630-654-2282 Elliot Hedin JDBERGMAN@AOL.COM FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A OKU000878 N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn EPA 6 ECDWE Environmental Engineer EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2020.02.19 08:25:47 -06'00' Kent W. Sanborn GUY Digitally signed by GUY TIDMORE TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2020.02.28 10:44:13 -06'00' Guy Tidmore Date 28 FEB 2020 Date 6ENFORM-019-8 (10/31/2019) 1 Section I - INTRODUCTION Petco Petroleum Corporation/ Unknown Inspection Date: 01/08/2020 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Petco Petroleum Corporation oil and gas facility located near Oilton, Oklahoma on 01/09/2020 for an unannounced inspection. There were no representatives of Petco Petroleum Corporation present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION The facility did not have an identification sign at the battery. It was located north and west of Drumright, Oklahoma, west of Highway 99. The facility was the site of a previous discharge of produced water. Section II - OBSERVATIONS I observed a previous spill of produced water had occurred from this facility prior to the inspection. There was some surface grading done on the spill flow path prior to the path's entry to the nearby creek. I did not observe any surface covering along the flow path. I saw that the secondary containment pit at the tank battery had a small amount of brine fluids within it. With a calibrated YSI Pro 30 conductivity meter, I took a Total Dissolved Solids (TDS) reading of the nearby creek, downstream from the entry point of fluids on the nearby creek and a reading of 2,340 milligrams per liter TDS was observed. I took other TDS readings throughout the area and I observed elevated levels of TDS upstream from the point of entry as well. The readings in this area were higher than previously observed, and it indicated potential for additional releases of produced water into the creek. Section III - AREAS OF CONCERN There was a release from the facility observed and a flow path to the nearby creek. The creek had elevated TDS levels within it and downstream from the entry point where produced water entered the stream. Section IV - FOLLOW UP EPA water enforcement will conduct a follow up inspection in approximately 3 months and will refer this facility to the EPA R6 SPCC program. Section V - LIST OF APPENDICES N/A 2 6ENFORM-019-8 (10/31/2019)