Document da3ObVRq5zp2pzYqZBnam75BG
p 006022
OVERALL APPRAISAL, STRATEGY 0i\SI2T?ATI0i.S
ALE RSCC.v.vEi\3Ai:CNS Or Tri iA:% rORwi
It is recognized that .the Departments have given attention to the Pyrani issue for some period of time. Plans in place and periodic assessments of the situation, as presented in Section VII - Position Papers, attest to this fact.
The principle contribution of the Task Force has been to add knowledge in certain areas, provide further definition of the alternatives, and by distilling and organizing the inputs to present general management a comparative display of the trade-offs.
This portion of the Executive Summary seeks to aid general management further by compiling the highlights of the most significant data ir. an overall appraisal, the strategy considerations, and key reconrnendations.
Overall Appraisal
Four factors characterize the current state of affairs:
1) The situation will remain fluid for some time;
2) An alternative more favorable than Continuing with Pyranol has not yet been clearly demonstrated;
3) The need for PCB effluent control facilities and the associated ability to operate plants will be unaffected by converting tc an al ternative to Pyranol;
4) Time to act is rapidly shortening.
There is the possibility that the PCB control requirements will not be determined in the second quarter 1974 for compliance by July 1975. The process may extend well into - or'throughout - the year 1975 for these reasons:
The proposed standards (12-27-73) are unreasonable by orders of magni tude;
Determination of the standards may be based more on emotionalism than on scientific data;
At the pre-hearing (1-25-74) the industries' legal representatives generally went on record as being prepared to go to court if the pro posed standards are not revised to valid acceptability.
For planning purposes, however, it should be assumed that external pressures may force discontinuing the use of Pyranol:
The EPA is under great pressure by environmentalist groups (e.g. suits now in court);
774671
- 2-
Discontinuance may have to occur as early as July 1975 if industry efforts (legal and persuasion) arc unsuccessful in obtaining accept able standards or compliance date deferment;
Even if standards acceptable to industry are obtained, discontinuance sometime after July 1975 may be forced, depending on end user reaction to the control requirements and the posture taken by the (*)Service Shops.
The investment and operating expense of containment facilities for PCS very well may have to be incurred and the ability to continue plant operations may be impaired even if manufacturing with Pyranol is dis continued. There is the residual PC8 in the earth at the plant sites due to past years of operations. Leaching of the residual PCS is the major source of PCS discharge. As the Effluent Standards now stand, this discharge must be in compliance by July 1575.
Should external influences not force discontinuing the use of Pyranol, then the central issue becomes the exposure associated with spills, major spills that may. be costly and the high frequency of minor spills (seepage) that may promote customer resistance:
Over five years there is a 37% chance of no major spills, a 37% chance of one, and a 26% chance of two or more for the three Departments under the most optimistic assumptions.
The ccst of a major spill is unpredictable but is not typically illus trated by the 1973 Tennessee spill of $300 000 (three 1500 gallon units were involved whereas 90% of WTPD output is in 94-243 gallon units);
Regarding major spills, there needs to be taken into account welds, gaskets, and the accountability of transportation companies and customers. The six major spills recorded during the past five years were due to the following causes:
KTPD DTPO PTPD
Weld1 2
1 3
Gasket 1 1
Trucker Customer 11
11
Total
4 1 1
6
The predominant cause of minor spills on customers' premises a welds and gaskets, however, the consequences are that (a) in 50% Gf the cases not one drop of Pyranol reaches the ground and (b) in 902 Gf the remaining cases the liquid reaching the ground does not exceed one teaspc-onful.
774672
(*) According to A. P. Christenson (2-5-74), the Apparatus'Service Division has no plan to witndraw from Pyranol, will maintain a 'c.,
profile, and foresees possibly a marketing opportunity in disposing cf Pyrar.ol for its customers.
GENP 006024
in>*!
ce i ion te ops. )
this
;S lance
lli*' *
ni
is* :ars
o is of the
of the one
aK posing
No one alternative 1s expected to serve the three Departments Involved. Power Transformer may have to pursue a route different from the one that best fits Medium Transformer and Distribution Transformer:
The potentially common alternative - Develop Substitute Liquid - presently rates low probability of becoming acceptable except for Power Transformer;
In this event Convert to Dry-type Transformers is the alternative for Medium Transformer and Distribution Transformer.
The dry-type transformer alternative has prospects of being a costly action:
Prime costs will be Increased upwards of 301 and, until overcome by increased selling prices and/or cost reductions, might reduce (annual rate) by around 20% the total net income of Medium Transformer;
Timely and sufficient increases in selling prices may be possible even though significantly increased competition may be attracted; today Medium Transformer participates strongly and profitability with this same potential competition in the present dry-type market;
Customers will have to be persuaded to accept a lower-capability transformer at a higher selling price;
Distribution Transformer has no existing designs nor facilities with which to serve the Pyranol market. Design and development for drytype transformers to serve the existing Pyranol customers is estimated at $400 000, - and facilities at $200 000. A study team will provide more clearly the extent of a program by March 6, 1974.
However, the present dry-type transformer market is an opportunity for both Departments:
This profitable market for Medium Transformer is growing; additional facilities are required and have been provided in the proposed October 1973 Facilities Plan ($585 000);
Distribution Transformer is participating in this market area with oil-filled but not dry-type transformers. This market rea represents the heart of the DT business and suggests a vulnerability if dry-type transformers accelerate their penetration as a result of the Pyranol shift and increased customer experience with dry-type transformers. This market segment is larger than the Pyranol market segment and is presently growing at an annual rate of 11% and the rate could increase.
The present timetables of the contingency plans of Medium Transformer and Distribution Transformer have been made virtually unrealistic as to accomplishing full-product!on conversion from Pyranol to an alternative by July 1975 (figure 1):
774673
9 Develop S*jfascii l ic >,,i.uid ---- ins sxt^cr. o> product cedesign anu -au-- facturing changes that will be required is scheduled hot to be known until June 1974; one year may be insufficient time in which to accomp
lish this work;
Convert to Dry-type Transformers -- To have Rome facilities ready by July 1975 requires the "go" decision today; work must begin in the second quarter because brick-and-mortar is involved. Following established procedures, PAR approval cannot be obtained in time;
Distribution Transformer must start immediately to gain technology
know-how from other parts of the Company (Ft. Wayne and Rome) and
C7R0apply it to designs for serving the existing market segments. The
know-how transfer will be facilitated in that the
Laboratory
responsible for the development of ary-type technology for the
Division is also located in Pittsfield with the affected DT engineering
and manufacturing operations. However, the extent of the programs
for development-design and facilities are not currently known; these
determinations are due in March 1974.
Strategy Considerations
1. Press "Continue with Pyranol" as the primary objective:
Employ legal action if the final Effluent Standards issued in the second quarter 1974 are unreasonable. Also, seek injunctive relief from the compliance date of July 1575, if only to buy time (should conversion become inevitable, it must be orderly in the interests of customers, employees and the businesses);
czoQno .-iM'nm
Examine the practicability of increasing the integrity of welds and gaskets, or the feasibility of limiting sales to units no larger than 2500 or 3750 KVA.
Investigate the availability and cost of insuring against claims by customers and third parties due to spill accidents;
Maintain up-to-date knowledge of the strategy and plans of the Apparatus Service Oivision (Service Shops).
2. Power Transformer pursue with customers early clarification, under standing and acceptance of its contir.ger.cy alternatives cf Standarc Oil-fill and Substitute Liquid, stressing the implications of tr.e July 1975 compliance date (e.g. no Pyranol transformers).
3. Because '`Convert to Dry-type Transformers" is currently the most viacle alternative, act expeoitiousiy to utilize the present ervtype transformer market opportunity in strengthening the base for this alternative:
zr Make timely installation of facilities .nc iuC *r.g -^rick-ancmortar) -cr. .at incremental equipmc:*. aadittons can icter liccomrr.cdote-the conversion from Pyrar.ol;
774674
- 5-
Begin necessary product and process development program;
Formulate marketing programs needed to implement a transition from Pyranol;
Make an economic analysis of this alternative to guide the development and marketing programs, and business strategy.
4. Accelerate the "Develop Substitute Liquid" program:
t For its potentiality of becoming the most viable alternative;
As early as possible make an economic comparison with the dry-type alternative, commencing with rough evaluations.
Recommendations
1. Assign immediately to the Strategic Planner Large Transformers responsi bility for
Project leadership
Integration of planning and Implementation follow-up
Liaison with other Company components regarding the Comoany response program with EPA.
2. Prepare a master timetable of activity completion dates and decision trigger points.
3. Medium Transformer begin in April the installation of additional dry-type transformer facilities to serve the present market (oppor tunity for a satellite plant?).
4. Determine the means for, and feasibility of, introducing favorable non-industry influences in the response program with EPA:
Political representatives - C. J. Meloun
IEEE
- T. H. Lee
5. Prepare right away a comprehensive comparative evaluation of Continue with Pyranol and Convert to Dry-type Transformers as illustrated in figure 2.
6. Institute bi-monthly status reviews of the total program, jointly conducted by C. J. Meloun, R. T. Morris, I. J. Petersen and T. K Lee and beginning no later than March 1974.
n 9o o rj m ^
774675
Figure 1
iiXi.nlLI rui\
ALTERNATIVES
Cjh?-. DATE
C" I. Continue with Pyranol Co n t a i n m e n t `Facilities
II, Substitute Liquid
A. Dev
1) Select Candidate 2) En v . Screening/Accept. 3) Fire Insurance Appr,. 4) Determine Insul. Sy s , 5) Define Design Parameters
b . Design
C. Ke s .C n s e s
III.
L
Dr y -t y p e
A. MIED
PARFa c i l i t i e s
Ap p r .
Im p l e m e n t
B. DIED
1) Dev
2) Fa c i l i t i e s
o Decision needed
1974 1 2. 3 4
O'
1975
1 2 \l
1 il
1I________
-- II
I__ 9 9 9 9 9 9 9
i9 9 9 9 9 9 9
o-
o
II
9 i!
?
i li I
774676
GENP 006027
( i l . uS CT3 Z'\or. /
A S S E S S ME NT OF COMPARATI VE DATA RE: KTPO ANO DTPO
I. Factors A. Facilities -- --------
B. Product Available 7/75
Continu with Pyranol
Containment Facility: MT?0 SO.5 1l:1on OTPO 0.5
Total SI.0 Billion Must begin 3rd qtr. 1974
Convert to Pry-type Transform
Production Facility: M7PC S.1.0 i d t p : 0.5
Total SI.2 i Must begin 2nd qtr. 1974
Reasonable Probability: KTPO extend existing tecnnolo* OTPO draw on MTPD and develop
C. Costs 1. Dev./Design 2. Increased Operating
0. Competition E. Customer Implications
F. Risks
None
Containment Facility SI50 Q00/yr.
OSHA Req'ts.
1
Major Spills
5 0 000-200 OOO/yr. avg.
$400 00C - 1.2 million
Prime costs (Subject
upwards SI.5 long term tb
mil1
1lor
(reduction via development)
Only one competitor - W
1. W now has broaoer capability 2. Five other competitors likelj
1. Must comply with EPA Effluent Standards
2. Service Shops must comply
1. No environmental problems re: 2. Product larger with reduced ;
capabilities (at higher price 3. Primary substations must go t
oil-fill plus concrete vaults
1. Cannot raise prices to cover Increased operating costs.
2. Customers demand substitute product (e.g. PGAE going to dry-type)
3. Major spills chances: 82* none 1n full year; 371 none over 5 years
4. Welds and gaskets not removed as
major cause of leaks (minor & major)
(Welds responsible for 2 of 0~") (major spills recorded In past) (5, years,-Including Tennessee_) 5. Adverse publicity no matter how seldom a major spill
1. 225 profitability loss for KT 1f a) P n ces cannot be r*i.et s than Pyranol cue to ccmpe
b) Prime costs are not reCuc (delates to C.2. above
2. STPO acquires more market of" OTPO
3. Opportunity: Larger and fast dry-type mancet not now fully
. Assessment
Reasonable risk If -
e Welds and gaskets removed as predom inant cause of leaks,
Customers willing to comply with EPA Effluent Standards
e Monsanto willing to stay 81g IF's - but -
Highly profitable business with only one competitor
Potential costs via major spills cay be less than known Increase In prime costs via dry-type
Containment facilities may w e t Effluent Standards 1f EPA makes allowance for "residuals"
Minimal risk re: Effluent Stand Some risk re: OSHA (e.g. asbest Fairly high risks re: profited
O
o 5