conoco Interoffice Communication To From : R. D. Gamhlin ; John Friend Date ; November 18, 1981 Subject : WEEKLY PRODUCTION REPORT - ABERDEEN - WEEK ENDING 11/17/81 WEEK NO. 45 Resin A S BC Plasticizer A & BC Dry Blend Compound A & BC Production MM Lbs. - 7 Days - 11/11/81 thru 11/17/81 Last 7 Days 5.09 .12 .41 .40 Month to Date 11.43 .26 1.01 1.02 Year to Date 244.78 11.07 40.88 41.28 Previous Month 14.65 .93 1.79 3.03 Safety There was one minor first aid injury recorded for the reporting period. Resin Unit (A & BC Grade) Production Forecast MM Lbs. - November Last 7 Days, M Lbs./C.D. Last 7 Days, % of Budget Current Rate, % of Budget "^ 727 65 30 Budget Forecast 11/12 Forecast 11/19 33.2 15.5 15.5 Vinyl production for the week was 727 M lbs./day. Major downtime items included a condenser cleaning of 743 reactor and downtime associated with resetting D-700 condenser. The new reactor module was shutdown 11/18/81 to complete panel instrumentation work related to the plant expansion project as well as a number of other maintenance items. Compound Unit (Customer Grade) Production Forecast MM Lbs. - November Last 7 Days, M Lbs./C.D. Last 7 Days, % of Budget 57 Budget 4.6 37 Forecast 11/12 2.5 Forecast 11/19 1.6 Line I operated four days averaging 38 M pounds per day. Line III operated seven days averaging 50 M pounds per day. Production included the up-grading of 104 M pounds of "BC" material into "A" grade. Operation on both compound lines was limited by product mix and product reblending. Line I was also utilized to repackage 118 M pounds of material. DTH 000051697 R. D. Gamblin November 19, 1981 Weekly Production Report - Aberdeen Page 2 Plasticizer Plasticizer operated 3 days averaging 41 M pounds per day. Dry Blend Unit Production Forecast MM Lbs. - November Last 7 Days, M Lbs./C.D. Last 7 Days, % of Budget 59 84 Budget Forecast 11/12 Forecast 11/19 2.1 1.2 1.2 Dpy blend operated five days averaging 59 M pounds per day. Production included two new dry blend formulations that utilize 0.68 viscosity resin. A test run was started on Tuesday, November 17, to determine variations in master batch techniques and to develop a quality control test method for the RP-100 dry blends. Du Pont Contacts There were no Du Pont contacts during the week. tap RDG's OFFICE TO COPY: HRF, ELK, SKS ABERDEEN COPIES: CRM, PEM, RGG, JEM, MPB, RDJ, TBD, RAF DTH 000051698