Document dYvzdkKYoZd65NZbk22bLgGV0
PLAINTIFF'S EXHIBIT DUP-1882
CC:
R. W. Forloines 'f D. A. Cou t ts J. M. Kayser J. C. Jenkins - Const
August 6, 1982
TO: FROM:
S. W. ELLIS C. M. BECK
ASBESTOS HANDLING IN F-UNIT COMPRESSOR BUILDING
Asbestos samples were taken July 8-11 in the F-unit compressor building (B-553). The transite roof on the building was cut on July 9-11 to install a catwalk on the roof. Three areas of the building were sampled: <?3 Hyper, //4 Spindle, //I Purge compressor. Samples were taken on July 8 to obtain a normal background concentration.
The samples were taken for 6 to 8 hours using Du Pont P4000 pumps calibrated at approximately 3 Lpm with Millipore AAWP
mixed cellulose ester filters (open face). Analysis of the samples was done by Clayton Environmental Consultants using NIOSH F& CAM 239.
The results, seen in Table I, indicate that a detectable level of fibers normally exists in the building. The cutting operation did not raise this level significantly above normal. All concentrations are well below the OSHA PEL of 2 fibers (>5/0/cc. Analysis of the transite roof by X-ray diffraction shows a 2Z chrysotile content.
DUP 0814512
CMB:sgd
'SAFETY IS f/Y RESPONSIBILITY'
DU 009870
TABLE I ASBESTOS MONITORING RESULTS IN F-UNIT COMPRESSOR BUILDING
Date
7/8/82 7/9/82 7/10/82 7/11/82
#3 Hyper
Concentrations (fibers/cc)
// 4 Spindle
if 1 Purge Compressor
. 003 .017 .002 <.002
<. 003 .009 .007
<. 002
.01 .008 .004 < .002
DUP 0814513
"SAFETY IS MY RESPONSIBILITY"
009871
jEEuEDu
/' V
.----.s>.Li
~ | |
p
DU 009872