DOBBS 9 SHUTDOWN JUNE , 1988 EQUIPMENT TO BE REMOVED 1. P-420 AND P-421 A. ASBESTOES INSULATION WILL BE REMOVED FROM STEAM PIPING. B. ALL STEAM AND PRODUCT PIPING TO BE REMOVED VIA OPERATOR MAINTENANCE. C. PUMPS AND DRIVERS WILL BE REMOVED BY RIGGERS AND HEAVY EQUIPMENT IN AREA. D. LABORS TO CHIP OUT PUMP BASES AND REFINISH CONCRETE. 2. V-201 SEAL OIL TANK A. ELECTRICAL CONDUIT TO BE REMOVED BY ELECTRICIANS. B. LARGER PIPING TO BE REMOVED BY PIPE FITTERS. C. ACTUAL VESSEL REMOVAL BY RIGGERS AND HEAVY EQUIPMENT IN AREA. 3. E-281 CRACKED GAS CONDENSER A. PIPE FITTERS WILL REMOVAL COOLING WATER DETAILS AND INSTALL BLIND FLANGES. B. ACTUAL EXCHANGER REMOVAL BY RIGGERS AND HEAVY EQUIPMENT IN AREA. 4. P-380 AND P-985 SEAL OIL POTS A. ELECTRICAL CONDUIT REMOVED BY ELECTRICIANS. B. PIPING AND VESSEL REMOVAL BY OPERATOR MAINTENANCE. 5. OLD DOW CORNING SYSTEM REMOVAL A. OLD SYSTEM TO BE REMOVED VIA OPERATOR MAINTENANCE. DPMC-12263 LAM 018623 LAM 018622