Document dYk3gebxzY7xrk9j2adbdrkL5

To: M. P. Neff From: J. M. Jackson CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas January 19, 1978 Airborne Asbestos Measurement - Plastics Company Work area air samples for routine OSHA compliance have been completed. These samples were taken In October. Results are In Table I. A visual inspection of the handling procedure was made during the blending operation in the Celanex area. The following observations were made: - A dust problem may exist where Decarbromodiphenyl oxide, PBT chips and Thermo Guard (antimony oxide) are added to the blend hopper. An excessive amount of airborne dust was also evident during the cleanup of the area after blend preparation was completed. This problem was caused by dry sweeping of the area. Plans are to monitor for airborne particulates in the Celanex blending area during the next routine asbestos sampling period. JMJ/mb Attachment cc: C. A. Amend - Bishop W. C. Beyer G. D. Boyd J. L. Merlan W. H. Meyer P. M. Sykes C. D. Barrett - CCCTC W. T. McNair Central Files (2) J. M. Ramey - NYO Uniterms: OSHA monitoring Asbestos sampling File: 259.0 001357 JMJ-20-78 -2- January 19, 1978 Table I Airborne Asbestos Levels In the Plastics Area During Celanex Production Sample Identification Rate Asbestos Filler Blending Area 10-14-77 2 Fibers/cc^ >5 m in length 0.34 Celanex Bldg. General 10.17-77 0.06 Comments Sampled Operator Helper during blending operation, (peak exposure measurement) Sampled Operator Helper during routine work assignment. (8 hour TWA) Q) National Loss Control Service Corporation, Environmental Science Laboratory Long Grove, 111. 60049 : November 11, 1977 Request No. 04140. @ Threshold Limit Value (TLV) American Conference of Governmental Industrial Hygienist. File: 259.0 001358