Document dYb0pGwyLEq5ZOB6mn2Mqb8oq
PLAINTIFF'S EXHIBIT
FORM P927
CERTWHTHQ
description:
TECHNICAL SPECIFICATIONS
CERTAIN-TEED PRODUCTS CORPORATION PIPE DIVISION
SPECIFICATIONS CLASSIFICATION:
Standard Purchasing Specification
T C O REF NO
SPECIFICATION NO'
'T PAGE NO "
$h0
JulySUPERSEDES 2%, 1966 September 9, 1966j
. L--
| OATE OF ISSUE
May 21, 1971
Epoxy Hardener for Epoxy Lining of CPC A /C Pipe
1. General
1.1 Description
This specification describes the hardener used in Epoxy Lining of A/C Pipe. This hardener is an aliphatic amine type which when blended with the specific amounts of the proper epoxy resins, fillers and coloring agents will form a hard, durable, chemically stable lining. The hardener shall not contain any diluent, solvent or other additives Triethylene tetramine (TETA) is the desired product. Other hardeners, which meet the requirements of this specification and perform satis factorily in service, may also be included with proper authorization.
Safety Note:
Hardeners, in general, are considered toxic upon prolonged or repeated exposure. The use of protective clothing, gloves, and use of protec tive cream on hands, combined with frequent washing of hands and face, is mandatory.
1.2 Use
This material is intended to be the activating agent for the curing of the epoxy resin which when mixed in proper proportion and admixed with epoxy resin and fillers form a suitable protective lining for A/C pipe.
1.3 Lot Size
For sampling and inspection purposes, a 1ot shall be defined as the number of drums (drum) shipped on one order, received at one time, at one location, and identified by a code number.
2. Requirements 2.1 Special
CTD015136
PREPARED BY:
All hardener suppliers shall be approved in writing by the Technical
Service Manager - Materials of CERTAIN-TEED Pipe and Plastics
Group (P&PG).
Any change in the hardener must be authorized in
writing by the Technical Service Manager - Materials before the end
product my be supplied to CPC plants. When such change is author
ized, the change shall be recorded by date of manufacture. The manu
facturer shall notify the Purchasing Department and Technical Service
Department when such an authorized change is actually effected.
.
APPROVED BY:
R ft O
MFG.
SALES
IE.
#L3k. Cf}U A
OTHERS
CONFIDENTIAL DOCUMENT'- NOT TO BE DISTRIBUTED TO UNAUTHORIZED PERSONNEL
I
FORM P92?
I-----------
CER1WNTHD
DESCRIPTION:
TECHNICAL SPECIFICATIONS
SPECIFICATIONS CLASSIFICATION.
CERTAIN-TEED PRODUCTS CORPORATION PIPE DIVISION
Standard Purchasing Specification
T.C.O. REF. NO
SPECIFICATION NO'
3 5ii0
SUPERSEDES
July 2^, September
1966 9,
~1
1966____ ji
DATE OF ISSUE
May 21, 1971
Epoxy Hardener for Epoxy Lining of CPC A/C Pipe
1
2.2 Manufacturer's Inspection
The manufacturer shall perform such inspection and testing that all defective material is removed from each shipment before shipment is made to CPC.
2.3 Manufacturer's Control Data
The manufacturer shall maintain records of the control data on each batch of hardener from which product is shipped to CPC. These records shall be such that when requested, the manufacturer shall be able to furnish a notarized statement that the requirements of this specifica tion have been complied with for apy given shipment.
2.U Physical Characteristics
Physical characteristics shall be in accordance with the requirements as shown in Table A.
3 Test Methods
The following tests will be conducted in accordance with the applicable test methods.
3.1 Fhysical
Color Density Viscosity Refractive Index Boiling Point
ASTM D-l5Wi
TM-3U
Brookfield Viscosimeter
Standard Commercial Refractometer
ASTM D 86
Group L
3.2 Chemical Pot Life
ii. Packaging and Marking
TM-32
CTD015137
The hardener shall be packaged in non-returnable lined fifty-five C?5) gallon drums with a bung and bung vent on the top of the drum Each drum shall be marked (stenciled) to show the vendor's name, brand name and num ber, batch number, weight and CPC order number.
PREPARED BY:
/
APPROVED BY:
OMf tt-a
R&D
MFG.
CQ^J lA_
SALES
IE.
L !y
OTHERS
CONFIDENTIAL OOCUMEf<I/- NOT TO BE D,STRIUTED TO UNAUTHORIZED PERSONNEL
FORM *27
CEfflAINTKO
DESCRIPTION:
TECHNICAL SPECIFICATIONS
CERTAIN-TEED PRODUCTS CORPORATION PIPE DIVISION
SPECIFICATIONS CLASSIFICATION
Standard Purchasing
~f7c o. ref no.
3
["specification NO'
! ^Uo
SUPERSEDES
2$, 1966
Specification
PAGE NO :
I J3
DATE OF ISSUE
September 9, 1966
toy 21, 1171
Epoxy Hardener for Epoxy Lining of CPC A/C Pipe
1 I
I
5. Acceptance and Rejection
CPC reserves the right to reject any lot, or Tots, riot confftrming to the requirements of this specification. Such rejection or acceptance of lot, lots, or portions thereof shall not be limited to the time of shipment, but 3hall be made within 30 days of receipt of the shipment. In the event of a rejection, the vendor shall be immediately advised and the reason for the rejections explained. The vendor shall be given the opportunity to in spect representive samples of the rejected materials in the Materials Laboratory, North Vfeles, Pennsylvania prior to final dispositions. The vendor must express his desire to inspect rejected material within seven days after notification of the rejections and the physical inspection of the rejected material must be performed within 30 days after the notifica tion of rejections .
6. Addendum
As a corollary to the stated requirements of this specification, the manu facturers are entreated to become reasonably knowledgeable as to the condi tions of successful usage of the hardener so that Urey may employ their best technologr to assist in providing a hardener which will perform satis factorily the usage intended.
Table A
Color
Density @ 2$C
Boiling Point @ 760 mm HG, C
Viscosity 9 25C Brook-Field No. 1
Spindle
Centipoises
Refractive Index 9 25C
Pot Life @ 25C minutes, Min.
Shelf Life, Min.
Clear and Amber Min. 0.978 Max. 0.98u
265 - 285C
18-25 l.ii96
20 1 Year
I
foam p27
HcarauNTKD
DESCRIPTION:
TECHNICAL SPECIFICATIONS
CERTAIN-TEED PRODUCTS CORPORATION PIPE DIVISION
SPEC IF* CAT IONS CLASSIFICATION:
Standard Purchasing Specification
T.C.O REF. tO. ""^SPECIFICATION NO:
~| PAGE NO. :
3
1_ AAddendum $liO
j
1
SUPERSEDES Julyr&f i1966
]Of ISSUE:
September 9, 1966
May ?i, 1971
Epoxy Hardener for Epoxy Lining of CPC A/C Pipe
1
NOT TO BE DISTRIBUTED TO VENDORS
1. General
This addendum is designed to show the special sampling plan employed as a means for conducting surveillance over the quality of the hardener. This addendum also lists the approved vendors and their approved products.
2. Sampling
This material is shipped in fifty-five (56) gallon drums. If more than
one batch is in the shipment, each batch must be sampled, in accordance
with the following table. Each sample shall be one pint.
Defectives
No. of Drums
No. of
Constituting
of Each Batch
Samples
Acceptable
Rejection
in Shipment
Taken
Defectives
Basis
1-3 li - 6 7-9 10 - 12
13 - 16
1 2
3 li 5
0 0 0 0 1
1 1
1 2
iii i
i
3. Inspection
On each sample selected, test for pot life in accordance with Standard Test Method 32.
li. Rejections
CTD015139
The following procedure shall be followed on all rejected shipments.
11.1 Quality Control Headquarters and Technical Service Manager - Materials shall be notified and a sample of the defective material shall be sent to the Materials Laboratory, North Wales, Pennsylvania. This will be an aid in discussing the rejection with the vendor.
11.2 The Headquarters Purchasing Department shall be notified. They will issue instructions on how arid when the shipment is to be returned.
I
FORM P927
KRTAINTHD
description:
TECHNICAL SPECIFICATIONS
SPECIFICATIONS CLASSIFICATION
Standard Purchasing Specification
CERTAIN-TEED PRODUCTS CORPORATION T.C.O. REF. NO.
PIPE DIVISION
3
[SPECIFICATION NO.
Addendum ShO
'JulySUPERSEDES:., 25, 1966
DATE OF ISSUE
jSeptember 9, 1966________May 21, 1971
Epoxy Hardener for Epoxy Lining of CPC A/C Pipe NOT TO BE DISTRIBUTED TO VENDORS
5. Approved Vendors
Bakelite Corporation 270 Park Avenue New Tark. New York - 10017
Triethylene tetramir.e (TETA)
Dow Chemical Company Plastics Department Midland, Michigan
Trl ethylene tet-ramine (TETA)
I j
!
I