Document dYZwVoRL2bKqMBDpnKddady4q

PLAINTIFF'S EXHIBIT W. B. FRANKLIN MAMA9CA Humble Oil & Refining Company MANUFACTURING DEPARTMENT Technical Division Battown. Tsxas 3^ August Ih, 1959 iota cr aocborxtt sia oxnoua ccksact 1227 Dated March 5, 19^ anantmm 20-1-906 unansjaam Aimana Brown A Soot, Inc. P. 0. Box 3 Houston, Tens This will Be authority to furnish all superintendents, labor, equlpaant, transportation, sad naterlals (except if otherwise specified) necessary for cr inside A to nosing the 30 foot x A5 foot x 19 foot 6 lash wooden frees, asbestos siding, faseer Distillation Qffloe Building fros Its present losatlon adjacent Phenol Plant 2, to a location tisdlatsly southwest ot tank 1300- Contractor ahall jack up the building, secure It to dollies, transport the building to the new sits and lower It onto foundation blocks exercising due cars to nhwi- arucklag at walls and calling* Contractor ahall lasso the building with floors and walls level and plush and with the building la solid contest with all supporting foundation blocks* rnumu wm. pawn cki to rauaamt 1. Clear route for soring of the building. 2. Drinking water, not cooled, at present hydrants, use of sis at Contractor1 a risk* 3* Guard service required during tine of fence renewal end transportation through Puebla1 a perking lot. mnatx mi. mraat ma THK TQLLaTOPi 1. Disconnect electrical power, telephone serrlce, and piping connecting to building prior to Centreetar's Jacking up and soring building. 2* Reconnect utilities at new site after building has been placed In final resting position. 3* Robots and replace obstructions along route selected by Bunbla for Basing the building. paubbt As consideration for the full perfaraaace of this Contract by Contractor, Bahia agrees to pay extractor XZHE BUKHI2D PUTT AXD BQ/lOO ($950.00) DCCXAIS. It is understood end agreed that the perfoxnaacs of and paynent far this vark shell be subject to all the terns and condltlcna of General Contract 1227 dated March 5, 19k2, as Bended. ____