Document dYYw05OO6BGR2JdqdmQY4Key9
(conoco)
Interoffice Communication
To Vinyl Shift Supervisors
From Date
M. P. Blackwell July 16, 1982
Subject
SHIFT PERFORMANCE FOR June
Listed below is each shift's performance for each standard during the month of June, 1982
Charges Per Shift
11.9
B 12.1
11.4(1) 11.id)
M Pounds Dried Per Shift Moisture Resamples (Missed) Energy Usage, Avg. BTU///
495 9
3072
533 6
2938
503 2
3005
408 3
3230
Slurries Above 1000 ppm (Blends)
1
1
1
2
Stripper Samples Above 10 ppm 9 9 2
3
Absenteeism, %
1.8 0.0 0.3
0.
Bagging Rates, Lbs./Manhour
4359
4125
3750
4637
Coarse Batches
000
2
VCM Releases
001
0
Safety Performance
000
0
" (1) Charging rate affected by new unit recovery system shutdown,
SPECIAL RECOGNITION:
1. There were no first aid or medical cases in June. 2. B shift had no absenteeism in June.
Ikd*, M. P. Blackwell Operations Engineer
c: PEM
DTH 000002737