Document dYO5RnRN51vjEOVbnMnkv5pd9
* UN IT* ED
STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION 1
ENVIRPROOTNECM
EAGENNCY
TAL5 POST OFFICBEOS TSOQNU, AMRAE ,02 1S0U9I-3T9E1 21
00
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination System
(" NPDES ")
603 Pickleball
From:Karissa Oakes, Inspector
Thru:Damian Bednarz, Inspector
To:File
I. Facility Information
A. Facility Name:Hampstead Pickleball Club
B. Facility Location:45 Danville Rd.
Hampstead, NH 03826
C. Facility Contacts:Jameson Hill, Operator
Jameson Excavation
PO Box 158
Atkinson, NH 03826
(603) 362-8167, jamesonexcavation@yahoo.com
D. NPDES ID No (s).: NHR100101
II. Background Information
A. Date(s) of inspection: April 17, 2024
B. Weather Conditions: Sunny, 60 degrees Fahrenheit
C. US EPA Representative(s):
Karissa Oakes, Inspector
Damian Bednarz, Inspector
Eleanor Horvath, Inspector
D. State / Local Representative(s):
None
ED_019088A_00006055-00001
E. Federally Enforceable Requirements Covered During the Inspection:
National Pollutant Discharge Elimination System Construction General Permit
Effective February 17th, 2022
F. Previous Enforcement Actions:
None
III. Type and Purpose of Inspection
Routine Compliance Evaluation
IV. Facility Description
The Hampstead Pickleball Club project on Danville Road in Hampstead, New Hampshire,
(the " Site "), is a redevelopment and extension of an existing business complex of
approximately 8.5 acres, which features disturbance from construction activities. The
Site is being developed by Jameson Excavation into a pickleball club, which includes a
facility building, an outdoor court, and supporting infrastructure such as parking spaces.
The site is surrounded by forest to the east and the south, Route 111 to the north, and
commercial businesses to the west. There are mapped wetlands towards the
northwestern corner of the site.
V. Inspection
Mr. Bednarz called Mr. Jameson Hill in the afternoon of the inspection when EPA arrived
on site, at approximately 1:30 PM, to request access to the Site. Mr. Hill granted access
and said he would be on site to accompany the U.S. Environmental Protection Agency
(the " EPA ") on the inspection.
A. Opening Conference
Mr. Hill met Ms. Oakes, Ms. Horvath, and Mr. Bednarz (the " EPA Inspectors ") onsite and
introduced himself as the Site operator. Ms. Oakes presented her credentials and
explained the purpose of the inspection. Mr. Bednarz provided Mr. Hill a copy of the
EPA's Small Business Resources Information Sheet.
The opening conference occurred with Mr. Hill and the EPA Inspectors at the entrance
of the constructed pickleball club building located in the center of the Site. Ms. Oakes
explained that EPA was present for a routine Site visit. Ms. Oakes asked Mr. Hill about
the availability of the sites Stormwater Pollution Prevention Plan (" SWPPP "), and Mr.
Hill said it was developed by a 3rd party, the Dubay Group, and that he would be able to
send it through email the next day. Ms. Oakes informed him that she would follow up
via email to request an electronic copy of the SWPPP. Mr. Bednarz asked Mr. Hill about
2
ED_019088A_00006055-00002
an estimated project completion timeline, and he explained that the company hopes to
finalize all work by the end of June.
B. Facility Tour
The EPA Inspectors and Mr. Hill began the tour by walking along the north end of the
Site, next to Route 111. On the north side of the property, the EPA Inspectors observed
the first of two retention basins. This area included one retention basin and a small area
of wetlands that were delineated by Mr. Hill's consultant, the Dubay Group. These
wetlands had a berm constructed around them. The EPA Inspectors observed catch
basins on the property that Mr. Hill explained were draining into the retention basins.
Mr. Hill explained that all the catch basins in the parking lot and around the previously
existing businesses on Site drained to this specific retention pond. The EPA Inspectors
noted that the land around this retention pond was not stabilized. Mr. Hill explained
that they were in the process of ordering loam, and it would be stabilized within the
next week.
The group continued walking the perimeter to the west to the second retention basin.
The structure had a steep slope to the right side of the retention basin, with a riprap
swale directing runoff water to the basin. Mr. Hill explained that all catch basins in
parking areas surrounding the pickleball facility drained to this second retention basin.
The land around this retention basin had been seeded and stabilized.
The group continued walking south along the perimeter of the site behind the pickleball
facility. Construction behind the building was not completed, with outdoor pickleball
courts still needing to be constructed. The rip rap swale that drains into the detention
basin continued along the perimeter and stopped behind the pickleball facility.
The group arrived at the western side of the perimeter along Danville Rd. The EPA
Inspectors noted a small stream that was maintained by the town that traveled down
the road and continued past the dog daycare located on the north - western corner of
the site to the northern perimeter.
The group continued walking south along the remaining northern perimeter, then
returned to the entrance of the Site, where the tour was concluded.
C. Closing Conference
Ms. Oakes explained that she would be following up to request copies of Mr. Hill's
erosion control inspection reports and the Site SWPPP. Ms. Oakes also said she would
follow up with a copy of the inspection report within 60 days.
EPA departed at approximately 2:00 PM.
3
ED_019088A_00006055-00003
On April 18, 2024 (one day after the inspection), Mr. Bednarz emailed Mr. Hill to request
copies of the site's SWPPP and recent inspection reports and requested documents
were received on Sunday, April 21.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
VI. Inspection Photos
Photo Log PageImage Descriptions
25Slope along northern perimeter
24Slope along northern perimeter against wetlands
23Unstabilized land
22Slope along mapped wetlands
21More stream inside wetlands
20Stream inside mapped wetlands
19Swale into retention basin 2
18Culvert into retention basin 2
17Slope on southern perimeter with swale
16Flat land along northern perimeter
15Small culvert and retention basin 1
14Retention Basin 1
13Retention Basin 1 next to wetlands
12Wetlands with berm
11Slope on northern perimeter
10Space for outdoor pickleball courts
Pooling on side of swale
Hydroseeding of southern perimeter
Catch Basin leading to retention pond 1
Water traveling along perimeter
98765432
Water pooling at southern perimeter
Slope near entrance to site
Culvert near entrance to site
Flat / Unstabilized land at northern perimeter
1Northern perimeter
4
ED_019088A_00006055-00004