Document dYLMNDEeNBVwaJDrYo1473EZ0
FILE NAME Kent KNT
DATE 1952 Oct 29
DOC KNT007
DOCUMENT DESCRIPTION Memo RE H. & V. Specialties Company West
Groton Mass
Catober 29 1952
Pai
From Sabject Sabject
Persons
Interviewed
Date of
visit
Dr. Elkins
Kr Barley and Mr. Comproni and Y Specialties Company
Yest Groton
Xass
Kr 7. C. armon Employment Manager Mr. A. 0'Yalley Form
October 27 1952
Accompanied by Inspector Edward J. Mechan of the Division
of industrial Safety a visit was made to this plant to evaluate the dust hazard developed during the picking and carding of a cotton and asbestos
,
mixture
The
This end product is
operation has
to be used in
been at this plant
the facture of
since June 1952 cigarette filters
oo,
Cotton in Lapped form is ressived in 36 pound rolls and
are placed near the apron of the blanding shine
20 pound
bag of processed asbestos is placed on the cover of the apron Tas
'
bag is slit and the asbestos is fed by hand on to the cotton Imp being
fed into the blender The xixture consists of 30 asbestos and
70 cotton After passing through the blender the discharge is inte
a box truck The same material is fed through the machine again but is
allowed to discharge directly
into a storage bin or in some
box truck as needed
onto the floor This material is
cases some of the material is fed
rept
into a
and
fed
The blended Exterial is taken by hoist to the second through a cotton sarding chine At the take end the
foar
carded
: sees: onto th Drorr css roa sha at whe Sli: .
sot
RS +
-
.
Hee
.
ee
we
ST
a
P
soe
P bay
.
tebe
.
.
sae yp fee
The dustiest operation involves the feeding and dischar~
of the blanding machine One man usually operates this machine but is occasionally helped by one other employee There are a total of
9 man during three shifts for the complete operation The exployee at
provided with the feed and at the discharge and of the blender are
and were wearing unapproved Martindale type grase masks
The blender is located within a physically
_
*.
separated room which is 35 ft long 12 ft wide and & ft 3 in high
1s,ere of There are two 6 ft by 7 ft entrances which are not provided with doars
g
is one window 5 ft by 2 ft 1 in The cylinder the blender le
haat rentilated The bag collecters are located within the room and
+
ee
7
oe1.
of re oe
are
enclosed
The air is recirculated
The speration the pinker-
Lender os
generate's considerable dust in the working atmosphere of this
large fibers Liis- a room Leverer the majority of the particles are ro ee Py
i att
and are 101
'
.
.
oa
-
.
b
.
.
-e
ry
-2
believed to be pathologically significant If the respiratory protection
is not worn the dust as irritation of the nose and threat
There are 2 carding machines located on the second floor
only one of which is being used for the asbestos cotton aixture The
5570 various vorker rolls etc. are covered Exhaust ventilated slot
hoods are located at those points where the greatest amount of dus
sz
generated
within the
The
room
collector for this system consists
area
The sted six from thts
of 2 cotton baga
operation te
Recirculated
in evaluation was made of the dust concentration in the
working atmosphere at the blending and carding machines The
MSA Midget Lapinger Flasks were used and results are tabulated below
Sample
Za,
1
2
3 4 5 8
.
Air Analysis Table
Mina
10 zin 52 sec
Location
Operator's expose
Results JEST ASBESTOS &COTIC
Ullions Ullions of
nexgiales
rubla
a
7en-oe
feeding
blender second run
10 min 30 200
material
Operator's exposure discharge
and of machine second run
8.5
10 min 50 sec.
10 min 37 sec 10 min 49 sec. 18 min 30 sec
material
Operator's exposure feeding _
blander first run material
Operator's exposure discharge and of machine first run material
General air side and front of Breaker card to
General air take and and side of Finisher card 1
Maximum Allowable Camoentration
8.3
9.3
11.0
6.3
6146.9
3.3 66146.9 161446.96.9 8
15
dast in air is given as
since there is only 30
we do in the evaluation
5 million particles per cubic foot
asbestos in the xixture using the
of air However
same reasoning as
of the maximum allowable concentration for the
silica we arrive at 15 Therefore the
the concentration of
a figure of 15 million particles per cubic foot of above results indicate that if our assumption is valid the dust is not excessive As indicated above the
anjority of the suspended dust is made wo of large fiber partiales and sould not be picked up by the Midget Lapinger Flasks
The method of discharge of the materials from the pioka-
_, blender and the rehandling of the blended material is not entirely
;
a
satisfactory
and
results
in
considerable
dispersion
of
the
dust
In view b b above aonmitibus , following and and tima
are being submitted
.
gd '
< ation of th
machine should be provided with and required to wear approved Type &
raspizntzs
/
"
2 o dust collectors should be enclosed and the air shoald be to the ontalde of the nlant,
3. Consideration should be given to a change in involving the pneumatically conveying of the material from the blanding operation to second floor storage bins
operation
picking
make-cpair
4 Provision should de ande to permit the entrance of
inte the Sarding Hoos,
.
~~
5 A Yun cpab f '
"
fan prating at 17O rm 4
4
"
Boom.
suitable collector should be provided
' </^ 8nA . '
<"
' "
for this unit
prope
" "
tbtt
6. An industrial veoma aleaner should be used to reHOT
" < h " oc
' rorhad
'. ' "
Thereshould be a regular elean-cp at frequent intervals.
7
ontrol rvgr ahould .
Zach
employee in this operation should be given a physical examination indinding indinding
- ray of the chest The examination and ray should be repeated at , least anmally
when
when
the
It is requested that Inspector Keehan above recommendations have been completed
notify
this
office
oy id