May 2, 1972 STATUS - PCB POLLUTION CONTROL PROGRAM
Mr. J. R. Savage General Offices B2SL
ce 0. L. Bratsch C. F. Buckley W. C. Engraan P. E. Helsler
O. A. Hlppe A. E. Lelsy/R. M. McCutchan P. B. Hodges - E1SP . W. R. Richard - T5A
This is the May 1, 1972 status of the PCB pollution control program.
I. PCB LEVEL IN SEWERS
Aroclor sewer loss control data thru 4/26 are attached. April PCB losses to and from the Waste Treatment Plant about the same level as last month. Effluent level seems to have stabilized about 10 #/day. Future activities will be directed to controls and reduction of losses at the manufacturing department.
A. Aroclor Department - Major sewer repair project and provision of facilities to measure the flow and obtain samples from the department are under construction with completion expected by 6/1.
During April the department operated at reduced rates. The continuous chlorlnators operated about 42# of full rate and the batch chlorinatorB operated 27# of the time. < 1# of the off-gas generated at the Aroclor department was sewered at the department. It is estimated that at least 95# of the Aroclor off-gas was used to produce chlorosulfonlc acid. Possibly 5# may have been sewered at the chlorophenol department. Piping modifications have been made to prevent sewering Aroclor off-gas at the chlorophenol department, and an operating policy 1b in effect to not operate the Aroclor department when the off-gas has to be drowned to the sewer. The department did not operate after 4/22 during a chlorosulfonlc acid department planned maintenance shutdown'.
Off-gas scrubbing laboratory tests are in progress to find a scrubbing media that can be used to further scrub the HC1 off-gas from the Aroclor department. Expect research and design to be complete in May.
MONS 098838
Mr. J. R. Savage STATUS - PCB POLLUTION
CONTROL PROGRAM
WGK
I. PCB LEVEL IN SEWERS
A. (continued)
.
A tentative amendment to the process has been prepared to discontinue removing excess HC1 from the crude Aroclor by aeration. Potential PCB losses to the sewer that result from air blowing is the second largest known routine loss to the sewers (1-2 #/day). Additional
lime will be added to neutralize the free HC1 in the crude.
B. Total Plant - Losses measured at the Waste Treatment Plant Influent were about 24 #/day compared with 27 #/day last
month.
Completed testing of aewer samplers and have agreed that isokinetic Flip-Flop samplers will be installed at all points where it is desirable to monitor streams. This change in sampling procedure will go into effect on 5/1/72. Comparative analyses in the past would indicate results from the flip-flop to be more uniform and slightly higher than from the drum.
A statistical method for recording and reporting losses will be developed to better indicate trends rather than individual peaks and valleys normally present when plotting , individual data points.
C. Treatment Plant Effluent - April losses of 10 #/day compare with 11 #/day last month. The flip-flop sampler will be in service on 5/1/72. and statistical recording of data will be employed.
II. PROJECT STATUS
Estimate No. 3500 - "Repair Sewer and Paving in Second Street" In progress. Expect completion in May.
Project being prepared to pump from North Settling Basin to the ' South unit so that all flows from the department will flow
through the soon to be completed flow and sampling station.
HONS 09B839
Mr. J. R. Savage STATUS - PCB POLLUTION
CONTROL PROGRAM
5/1/72 WOK
III. PROORAM STATUS
Following the program Issued In February. Current Btatus Is attached. This should permit reduction to about 1 #/day during 4th quarter of 1972.
Edward E. Stewart Technical services Department
/tm
att...
HONS 090840
K -S
OFF-GAS SCP.U3BER
Production
Dally chock and record of denis ter operation and off-gas
temperature control.
/^
(
(In progress)
Coordinate 2*t6 production ,vwilith 217 and ssewer excess gas from 236 at 236
' - iL
Maintenance
(March start)
Technical Services
Verify off-gas calculated losses Scrubbing process defined Ss demonstrate In Lab.
Propare project (Estimate) to scrub off-gas.
Coordinate design of WGK scrubber activity with CED activity related to 1109 design.
(3/5) (March & April) (March 1 April)
MUNS 098842
AIR-BLOW REDUCTIONS
f
Production
Step-down eir blowing and minimize production of 1248 in batch
ehlorinators^.,- QtnUl*'.*tt/fas
Maintenance
7)
Technical Services
Prepare project to scrub air-blow.
` (April)
(will hold pending reduction noted in off-gas
project)
x|
5
MONS 098843
SETTLING ft SE'.iEB MJST FUTCTION PN, D-SIGIl
Production
f
Daily inspection of basins (In progress)
CO*
Maintenance
Project 2422 - Install PCB level alarm in North Settling Basin
(March)
Technical Services
/ Oet PCB level probes working in North Settling Basin and in off-gas storage tanks,
Develop technique to reduce PCB content in tank car
washes to ~t00 ppb. (
^ C&WAS - F/,,AL
Modify basin to effect more efficient skinning.
(M0 Ai.Ti>L,l7/i'Aj lift'/A+J --<?C M AL&tA
Modify Sooth basin to lower the level.
J
Afcy - POJCL /J)
(March)
(March-April) (March-April)
MONS 098844
Production
CONTAIN PHYSICAL LOSSES
f
Maintenance
Complete Project 5500 "Reoair Sewer at 2nd Street".
, . ,, CtL>
,
Project 369'! Extend pad at truck loading dock. "
{(PC/t-l fct ?)
(5/3 5) , (3/10)
Technical Services
Premise for containment at loading docks.
(VpT 3c<oe)
Premise for automatic cut-ofi* during loading of
tank cars.
^>7-
(April-May) (April-May)
MONS 098845
EXTRAS
Production Drip pan - bucket- drum color procedural emphasis
Water off in-line power factor analyzer
('eC/vt/OLC-rc^
Altering procedure of clean-up (less water, more
physical pick-up). /
.
(/o <gppcc7J
(Harch-April)
(February) .
(In progress)
Maintenance
Replace city water bre^ak tank Pump' Shop project (efMfO/^CTc)
(3/5) (3/15)
Maintenance man inspects all pumps on monthly baiss.^pj (In progress)
Monitor project
(hj't>)cub
fr? Mr
(Vi)
Technical Services
Verify accuracy of laboratory method^T^^
Define specific sampling proc/e2urec
!7 \
Mr /</e b 7V <&' tPuuffi-i-FFltr#
Select pump ar.d define future ssaammppling program
&Ucer>
Pi-'fi-- Ppececffii
hfl/ZU P(LOGfifr-> pet Cm
(February)
y
(March) (March)
\
Jtr/ts.: o)
MOWS 098846