Document dY5KvN79G780LyDk98eOyYE59
SOP #34
STANDARD OPERATING PROCEDURE #34 STORING ADH AND GDL DRUMS
CHECK
ACTION STEPS (ALL CAPS)
COMMENTS (BELOW STEPS)
THE OPERATORS PERFORMING THIS TASK MUST WEAR HARD TOED RUBBER BOOTS AND GLOVES IN ADDITION TO STANDARD SAFETY EQUIPMENT. WHILE HANDLING GDL DRUMS THE OPERATOR MUST WEAR A SLICKER TO GUARD AGAINST ANY UNEXPECTED EXPOSURE TO GDL.
1. THE STOREROOM PERSONNEL WILL CALL WHEN THE SHIPMENT OF ADH OR GDL HAS ARRIVED AND IS TO BE BROUGHT TO PER-TRI.
2. AFTER THE LEAD OPERATOR HAS ISSUED AN IGNITION SOURCE PERMIT TO THE DRIVER, HE WILL DRIVE HIS FORK LIFT TO THE SOUTH SIDE OF THE STABILIZER BUILDING.
3. THE AUXILIARY AND LEAD OPERATOR WILL JOIN THE DRIVER IN THE STABILIZER BUILDING.
4. IF THE DRIVER'S FORK LIFT IS ONE THAT CAN FIT INTO THE STABILIZER BUILDING, HE WILL POSITION THE DRUMS AT THE ENTRANCE OF THE COLD BOX DOOR.
5. IF THE STOREROOM FORK LIFT CANNOT ENTER THE STABILIZER BUILDING THE DRUMS WILL BE DEPOSITED AT THE SOUTH ENTRANCE DOOR.
6. THE GDL DRUMS MUST BE STORED AS QUICKLY AS POSSIBLE. THE ADH DRUMS DO NOT HAVE TO BE REFRIGERATED AS SOON TO PROTECT PRODUCT QUALITY.
7. SECURE A FORK LIFT AND ATTACH THE DRUM MOVER ATTACHMENT TO THE FRONT THEN PROCEED TO MOVE A DRUM AT A TIME INTO THE COLD BOX WHERE YOUR LEAD OPERATOR IS WAITING.
8. CHECK THE COLD BOX AREA AND MAKE SURE YOU HAVE ADEQUATE ROOM TO MANEUVER.
9. CHECK THE FLOORING FOR DUMPS, CRACKS AND TRIPPING HAZARDS.
10. CHECK THE TOP CHIME OF THE DRUM FOR ANY POINTED EDGES AND BE SURE THE CAP IS ON TO PREVENT ANY SPILLAGE.
eowffSKSU court
o 1"*" u.
SL 021289
SOP #34
11. BREAK THE DRUM TO ITS BALANCE POINT AND ROLL INTO POSITION.
''I'-,
Suhi^. ,^clal
ct co^r^
o 14th >" ,1-1145
SL 021290