From: M. C. Manion Dote: November 28, 1984
Subject: Incinerator Bypass 10/8/84
A ten (10) minute bypass of both the wet vent and dry vent headers occurred on October 8, 1984 at 3:10 pm. The bypass was due to a flame failure in the on-line incinerator I-901A caused by a high vent flow from the main plant. The high vent flow resulted from the shutdown of the vent recovery compressor BL-410 during the time in which railcar UTLX-92195 and T-411C were being cleared for maintenance. The vent recovery unit compressor BL-410 shutdown as the result of a high freon level in the intercooler. When the bypass was detected, the venting operations were immediately curtailed and the incinerator was restarted.
Mc^L
------- -
M. C, Manion
kf cc: RAC-PEM-MLA-RB-JRH
FV C.
1 .--O Las--' --
-Jl
OCR 000021918
Date: /&
S/S Siqnaturc
VCM VENT REPORT (See Note 1)
Date of incident Time of incident On-line unit
\s\o
^
1-901
I-901B
Off-line unit Main Plant VCM Production Rate Wet-Vent Flow Rate Dry Vent Flow Rate
1-901
2 .07
3V/ 3&o
I-901B MMlbs./day SCFH SCFH
Firebox Temperature
c
Did the Wet Vent by-pass? If yes, how long did it by-pass?
Did the Dry Vent by-pass? If yes, how long did it by-pass?
Did the Tank Farm Vent by-pass? If yes, how long did it by-pass?
\0 M i AJ
M i iV-
(Cijxle answer)
(^ej/
No
(See Note 2)
No
JSee Note 2) Yes
(See Note 2)
<S?
Did the on-line unit shutdown? If yes: 1) How long did it take to bring a unit on-line? 2) What condition initiated the shutdown: a) High firebox temperature? b) Low steam drum level? c) High HC1 absorber temperature? d) Low combustion air flow?
"" e) Loss of flame? f) Power failure? g) Manual (Operator) shutdown?
No
l o M > t-J . (See Note 2)
Yes Yes Yes Yes
Yes Yes
What caused the incident checked above:
1) Excessive vent flow?
2) Rich vent flow, i.e. high ethane in ethylene, etc.?
3) Steam outage?
4) Electricity outage?
5) Other? Explain
T" 4//-C Vj g<. r>:
No No
No No
1^7 t-'rr/' //V
-- -- ^ s'" 'r\r 1
ft . //,< s
-
y*-/.;
. _______
OCR 000021919 ^
VCM VENT REPORT (Cont'd)
What was the condition of the off-line unit: 1) Down for repairs or maintenance? 2) On hot standby? 3) Other? Explain _____________________
(Circle answer)
What action was taken to minimize the effects of the incident:
1) Off-line unit was started up/placed on-line?
i 2) Vents were cut back?
3) Supplier of raw material (ethylene or chlorine) was
notified of off-spec product?
4) Vents were split? .
^
5) Other? Explain
^
y//
i-
rC^
Yes No
Yes Yes
c
No No
op j-7om
Were any manual vents ocurring in the main plant? If yes, what was being vented? _______________
Yes
Were any of the following units down: Oxychlorination? Direct Chlorination?
LE Column? Jank Farm Blower?
Yes Yes Yes Yes
Were tank cars being loaded? Was a ship being loaded? Was recycle EDC routed to:
Wash System?
HE Column? R-101? T-101?
Yes
Yes Yes
Yes <S>
No
Notes:
000021920 CCR
1. This report must be completed anytime that the concentration of VCM in the incinerator stock gas exceeds 10 ppm, a vent by-passes the incinerator, or an incinerator automatically shuts down.
2. If a vent by-passes the incinerator for greater than one hour or both incinerators are down for more than one hour the appropriate personnel (process superintendent, operations duty person, or chief process engineer)
must be notified immediately.
M i O1 5 0 f ]' ) i |