Document dY0zxmNOYK8LpwYOreOQNQdXQ
tf. B. Fapageorge ' B2NA July 31, 1972
Mr. W. R. Corey B2SL
Ha..
8. L.
Bergen Bratsch
-- Bm2SoL
W. 8. Clark
- B3NC
D. Ooodwlllle - 5090
T. L. Ooasage - B2SL
E. Greene
- A2NA
0. L. Jessee - 1060
P. J. A. Marsh - 5040
B. N. Potter - B2NX
J. R. Savage - B23L
R. C. Sprague - B2NO
J. P. Stapleton - B2SA
Attached la a suamary of the current atatua of each of the actlona listed In the PCB/PCT Implementation Program described In pour memo dated December 27, 1971 to C. P. Cunningham. Certification by the appropriate managers Is shown. You will note that with the termination of FCB sales to Goodyear Tire and Rubber Company and to the German mine Industry, the program will be completed In its entirety.
To assure continuing control, the following actions have also bean certifiedi
1. All unsold worldwide Inventories of Monsanto products containing FCBs and PCTs are well lnhhand. Bach location has been advised of disposition of remaining Inventory to avoid any environmental or other contamination.
Certified by B. M. Potter B. Greene
2. No shipments of monochloroblphenyl (Aroelor 1221B) or PCTs will be made from Anniston plant except for disposal purposes.
Certified by G. L. Jessee
3. No samples of PCBs or PCTs will be released from the W. 0. Krummrlch or Anniston plants without approval from W. B. Papageorge.
Certified by G. L. Jessee
Certification pending from 0. L. Bratsoh
4. No products containing PCBs are shipped from the W. 0. Krummrlch plant without proper release from COP.
Certification pending from 0. t. Bra tech
MOMS 0997B1
Mr, w. r. Corsy
-2 -
July 31. 197*
5. No ordera for produote containing PCT are accepted by COP.
Certified by R. C. Sprague
6. No ordera for produeta containing FCBs are aocepted by COP t exoept for dleleetrle ueea and heat transfer fluid to Goodyear Tire and Rubber Company.
Certified by R. C. Sprague
7. PCB heat transfer fluid orders for Goodyear Tire and Rubber Company will not be prooesaed by COP after August 4, 1972.
Certified by R. C. Sprague
8. Orders for dielectric fluids containing PCBa are processed by COP only If approval is granted by H. S. Bergen.
Certified by R. C. Sprague
9. All acknowledgements of orders from approved PCB customers In clude a copy of a letter by H. S. Bergen stating the material contalna PCBa and must be handled, used and disposed properly.
Certified by R. C. Sprague
10. None of the products sold by the Specialty Produota Group are made with PCBa or FCTm as a raw material or Ingredient, or are manufactured In equipment which usea PCBa or PCTa aa an Industrial fluid with the following exceptional
a. Fluids sold to approved customers for dielectric applications
b. The special hydraulic fluid sold to the German mines
c. PCB heat transfer fluid sold to Ooodyear Tire and Rubber Company
d. A heat transfer system located at the J. P. Queeny plant used In the proeesaing of some of our products still con tains PCBa. No makeup Is being supplied to the system. Each lot of product produced la analysed to assure no de tectable PCB content. A conversion to a non-FCB fluid la scheduled for August, 1972.
Certified by J. R. Savage
MOWS 0997dJ
Hr. W. R. Corey
-3-
July 31. 1978
As of July 21. 1972 the U.3. Ihermlnol PR oonverelon program has resulted In 136 eonverslona In 1978. With the decrease In aotlvlty the conversion team has been gradually redueed down to one engineer uho Is arranging for another and probably final oonverelon recoamendatlon to the remaining 200 plus customers with PCB hast transfer eyaterns.
Our survey of 130 known customers of heat transfer units In food related systems resulted In 93 conversion conflnaatlons. Additional information available to ua Indicates that 28 of the remaining 37 have converted to non-PCB fluids. An attempt will be made to re contact these 28 to confirm their conversion status and of the re maining 9 to establish their status. A summary report of the total conversion effort Is planned for late August.
W. B. Papageorge /bt
MOMS 0997S3