Document dQVeLaBOyX2xzb9LvOo8a5rBq
m.
*
7.1 KOP
KOPPERS ROOFING
and
WATERPROOFING SYSTEMS
Coal Tar Built-up Roofing KMM Membranes * Cold Applied Roofing Exeltherm Roof Insulations * Reinforcement Fabrics * Roof Maintenance Products
PLAINTIFF'S EXHIBIT BEA-33
n r rV
M * 5* -j. <_____r
yl
Koppcrs. the roofing people
KOPPERS 7.1/KOP Architectural and Construction Materials
This manual contains recom
3 Preface
mended roofing specifications and procedures based on accepted good roofing practices and Koppers years or experience.
4-5 Product Guide
6 Bonded & Guaranteed Roofing Program Specification Reference Guide
They are intended to provide the architect, engineer, general con
7 Koppers Coal Tar Built-Up Roofing Material and System Discussion
tractor. and roofer with the proper information to plan and construct the best roof systems with the most time-proven materials available today.
8-12 13-14
General Requirements & Special Conditions Coal Tar Built-Up Roofing
Roof Specifications Coal Tar Built-Up Roofing
The availability of a Koppers surety bond or guarantee for
15 Special Applications Water Retaining Roof
roofing and flashing constructed according to the information contained in this manual under Koppers bond and guarantee procedure, and the publishing
16 17-20
Flashing Specifications Built-Up Roof Applications
Flashing Details Built-Up Roof Applications
of these specifications and infor mation shall not be construed as creating any warranty, expressed or implied, with regard to any
21-27
KMM Membrane Roofing Systems Materials and System Discussion Terminology Application
roofing or flashing for which a
28-29 KMM Roofing Specifications
bond or guarantee has not
Specification No. 610-620
{ been issued. This roofing manual supersedes
Specification No. 630 30 KMM Flashing Specification
all previous roofing manuals
published by Koppers in Sweets Catalogs.
31 Flashing Details KMM Membrane Applications
The specifications and details contained in this manual have been determined to cover the
32-35 Waterproofing and Dampproofing Systems Coal Tar Membrane Waterproofing KMM Membrane Waterproofing
proper procedure for long lasting roofing systems for most areas of our country.
In certain locations, minor varia tions in details and specifications may be appropriate due to unusual local conditions, such as wind,
36 37-40
Liquid and Mastic Applied Waterproofing and Dampproofing Systems
Hydroshield Mastic 451 Liquid Asphalt 480
Exeltherm Roof Insulation General Conditions Exeltherm Installation
temperature, humidity, etc. To assure the best application of the proper specifications and details for your area we recommend you you consult your Koppers representative.
41-43 44-47
Koppers Reinforcement Fabrics Specification and Technical Data
Roof Maintenance Products and Systems Roof Resaturants Heavy Duty Roof Shield System Koppers Aluminum Roof Coatings
Notice:
v.
This roofing specification manual as a guide for consideration to contains the latest and best avail assist the architect, owner and
or engineer and building owner. The contents of this manual are
able information as derived from roofer in an attempt to provide
subject to change at the discretion
Koppers long experience in the
the best roof possible for long,
of Koppers Company. Inc. as
roofing industry. The design criteria trouble-free service. Responsibility, future developments and expe
and details contained herein have however, for design of any roofing rience are achieved.
been compiled and are offered
system, remains with the architect
3
."rcd'jct Guics
The products listed below are manufactured
to meet the highest duality standards set by Koooers Company. Inc They are formulated
specifically for use in roof and roof main tenance and waterproofing applications.
Additional information on these products may be obtained in other sections of this manual or by contacting your Kopoers representative.
The products listed below are manufactured to meet applicable Federal and A5TM
specifications. If a certification is required on any of these products, it must be requested at the time of order placement.
Products
Description
Federal Spec. ASTM Spec.
Page No.
Bitumens Coal Tar Bitumen
Coal Tar based roofing and waterproofing bitumen
*
D-450-78 Type III
12
Asohalt Type III
Petroleum derived asphalt suitable for roofing applications (Type HI--Steep asphalt)
*
D-312-78 Type III
12
Felts si5 Tarred Felt
Coal Tar Saturated Organic Fiber Felt
HH-R-595 B Type ISC Style A
D-227
12
<43 Coated Base Sheet
Asohalt Saturated and Surface Coated Organic Fiber Felt
D-2626
12
Membrane system KMM` Aluminum
Aluminum Surface--Single Ply--Five layer laminated
*
21
Membrane
roofing membrane
KMM* Standard Membrane
Single Ply--Five layer laminated roofing and waterproofing membrane
* 21
Insulations Exeltherm" Urethane insulation
Exeltherm" Composite insulation
Closed cell urethane foam with integrally bonded asphaltsaturated felt skins
Closed cell urethane foam laminated to perlite board
HH-I-530A Type 1 Class II Grade 2. Style D
HH-I-530A Type 1 Class II Grade 2 Style E
37 37
Fabrics Tar or Asohalt Saturated Cotton (Std. Grade) Tar or Asohalt Saturated Cotton (Spec. Grade) Glasfao'
Giascoat" Jute
U F Mat (White)
U F Mat 'Coated) Stanoard Mesh
Heavy Duty Mesh Stonemat Roof cements Flash-on #441
Flashing Cement
Hydroshield
Tar Roof Cement 41 -
A woven cotton fabric saturated with tar or asphalt
A woven cotton fabric with higher thread count than above grade
A woven glass membrane available in 20 x 10 or 20 x 20 threads per inch--asohalt or tar coated
Same as above, except coated with white resin
Asphalt saturated jute, commonly referred to as treated burlap
A white, lightweight mat comprised of fine glass filaments in a random arrangement reinforced with a swirl pattern
Same as above, coated with asphalt
Medium weight, white glass strands bound together m a random pattern
Heavy asohalt saturated glass fibers m lackstraw pattern
A polyester underlayment for KMM loose aggregate topping
SS-C-450e
HH-C-4666 * HH-B-00800
m
Flashing cement formulated for weathering and flow resistance Not as heavy consistency as Flash-on #441
Asphalt cutback Formulated for application in all weather. Readily bonas to wet surface. Trowel or brush grades. Tar based plastic cement
SS-C-153 Type 1 SS-C-153 Type 1 *
SS-C-153 Type II
*
D-173
D-1668
* D-1327 *
*
w -
0-2822 Type 1 02822 - Type 1
*
m
42 42 42 42 42
43 43 43 43 26 36 -
KOPPERS 7.1/KOP Architectural and Construction Materials
Products
Roof costings Emulsions Liquid Asphalt 480
Description
Asphalt emulsion. Will not alligator if property applied. Heavy bodied, exceptionally high quality, non-fibrated clay emulsion.
Liauid Asphalt 472
Liquid Asphalt 484 Bituminous Aggregate Binder (BAT) Cutbacks Asphalt Roof Coating 4S4
Asphalt emulsion. High quality aabeatos fibrated, medium body, clay emulsion Fiberglass reinforced, asphalt emulsion Por use with the KMM BAT Topping only
Medium body, asbestos fibrated cutback coating
Fiber Coating 415 Reeaturants Roof Resaturant 425
Roof Resaturant 410
Primers Hi-Pen Primer 452
Coal Tar Concrete Priming Oil Adhesives CP Adhesive
KMM Adhesive
Reflective roof coatings Alum. Roof Coating 434
Tar cutback. Penetrates and resaturates tar and gravel roofs
Asphalt Cutbsck. Combines maximum penetration and coating properties Highest quality tar resaturant available. Excellent penetration and softening qualities.
Thin asphalt cutback primer with maximum penetrating capabilities Coal tar based primer for roofing and waterproofing applications
Superior asphalt cutback adhesive for asphalt felt applications A tenacious asphalt adhesive formulated specifically - for adhering KMM membrane
Contains 3 lbs. aluminum paste per gallon. Non-fibrated.
Alum Roof Coating 435
Alum Roof Coating 444 Alum. Roof Coating 445
Colored Roof Coating White)
Reinforced with asbestos fibers. Contains 3 lbs. aluminum paste per gallon.
Contains 2 lbs. aluminum paste per gallon. Non-fibrated.
Contains 2 lbs. aluminum oaste per gallon. Reinforced with asbestos fibers.
White acrylic emulsion decorative coating. To be used over new Liquid Asphalt 480.
Caulkingt Acrylic #400
One part, gunnable. acrylic caulking.
'Applicable Febenl and/or ASTM Quid# SpeemcatJona are not available tor Utla prodoat.
Federal Spec. ASTM Spec.
SS-R-1781 Type 1
0-1227 Type ill D-1187 Type A
D-1227 Type 1
SS-A-6940 SS-C-540b
0-2823 Type 1 N/A
e
SS-A-701
0-41 0-43
TT-C-00493 TT-C-498B m
0-2824 Type 1 0-2824 Type II
V
e
Page No.
36
26
-
--
45 45
16 33
21
47 47 47 47 -
_
5
Z ZZ Sf3 V V i m0 '+ *
Bonas and/or Guarantees are available for listed roofing sDecifieations in this manual To qualify for a Koppprs Roofing Bond or Guarantee, roofing and flashing must be constructed in accordance with Koppers Specifications, with Koppers materials, and by a roofing contractor authorized by Koppers.
Kopoers bonas are available for 10, 15 or 20 year terms, and only cover coal tar built-up roofing and KMM flashings where approved.
Kopoers offers the following Built-up Roof ing Guarantees: 10-Year Guarantee A ten-year guarantee with a ten-year renewal option--for 4 and 5 ply Coal Tar Bitumen roofing systems only
5-Year Guarantee A five-year guarantee with a five-year renewal option--for 4 and 5 ply Coal Tar Bitumen Built-up Roofing Systems only.
KMM Guarantee A five-year guarantee with a five-year
renewal option. KMM membrane applica tions only.
1. All roofing to be bonded/guaranteed must be constructed in conformance with Koppers specifications. 2. Koppers bonds are not available for residential roofing. 3. Koppers bonds are transferable upon timely written notice of change of property ownership. 4. Koppers bonds are available within the Continental United States in all cases except those areas where Koppers does not pres ently provide inspection service. 5. Approved flashings may be bonded/ guaranteed for terms up to but not exceed ing the term for which the roof is bonded. 8. Charges for the roofing bonds are made on a per square (100 sq. ft.) basis of the roofing membrane.
2 - = -~c 3: Koppers roof bonds provide for repairs of
leaks to the roofing not occasioned by defects m the building, abuse or extreme weather conditions during the term of the bond up to the monetary limit specified in the bond.
Roof bonds 00 NOT cover the repair, installation, or replacement cost of the following:
1. Decking materials.
2. Vapor barriers.
3. Insulation products.
4. Metal work.
5. Products in the roof assembly furnished by others.
6. Damage to the bonded roofing or flashing caused by the use of the products listed in 1 through 5 above, their installation or attach ment.
7. Vandalism or owner abuse.
Koppers reserves the right to cancel the bond if the roof is damaged due to causes not covered by the bond if it is determined its satisfactory performance for the remain ing term of the bond is impaired. Cancella tion due to damage of this type does not provide for any refund of the original cost.
Type System
Coal Tar Bitumen Coal Tar Bitumen
Loose Laia Memorane Aggregate Tooomg
Loose Laid Memorane Bituminous Aggregate Tooomg
Adhered Memorane Aluminum Surface
Peek
Slope
Spec. No.
COAL TAR 8UIL.T-UP ROOFING SYSTEMS
NailaDie
* max.
210
Non-nailable & Insulation
h max.
220
KMM ROOFING SYSTEMS
Nailable Non-nailable & insulation
t" max
610
Nailable Non-nailable & Insulation
1 (y" max.
620
Nailable Non-nailable & Insulation
No Limitation
630
Construction
4 and 5 ply tarred felt 4 ply tarred felt
Standard KMM Membrane Standard KMM Membrane Aluminum KMM Membrane
Page
13 14
28 28 29
/
6
*
Coal Tar Bitumen Built-up Roofing Materials and System Discussion
KOPPERS 7 1,'KOP Architectural and Construction Materials
-53c;;~:;cn
Koopers Coal Tar Bitumen built-up roofing systems consist of alternate layers of Koooers Coal Tar Bitumen and Koppers tarred felt, surfaced with a heavy top pour ing of Koppers Coal Tar Bitumen into which is embedded an aggregate. Koooers Coal Tar Bitumen built-up roofing systems are used whenever a roof is exposed to water and/or corrosion, and on all level or low sloped roofs wnere minimum main tenance is required.
Coal Tar Bitumen built-up roofing provides one of the most durable roofing systems known due to its inherent superior water proofing and weathering characteristics. This is THE time proven roofing system for level and low sloped roofs.
Coal Tar Bitumen orovides numerous advan tages to an owner The superior performance of coal tar roofing systems in the areas listed below make coal tar roofing systems unique in the roofing industry.
1. Coal Tar Bitumen has natural resistance to water, air and water vapor penetration.
A tight molecular structure enables Coal Tar Bitumen to resist water penetration and oxidation of the roof surface.
2. Another unique feature of coal tar roofing is its seif-healing ability.
Aiiigatonng and hairline cracks common to most materials, eventually cause damage to the roofing membrane Coal Tar Bitumen
has a property known as "cold flow" which automatically corrects these conditions before serious damage takes place. This "cold flow" feature heals small mechanical fractures at normal temperatures.
3. Application Improvements. Because Koppers has expertise in the chemistry of aromatic coal tars. Coal Tar Bitumen was developed with the beneficial features of low fume evolution at applica tion temperatures, thus reducing potential irritation during application. These features represent significant improvements which are in consort with the aims of government, labor, and industry in the areas of reduced air pollution and im proved worker conditions.
- -u-
1. All 'dead' level roofs 2. All water cooled roofs 3. Low sloped roofs with occasional ponding
4. Low sloped roofs with retarded drainage 5. All buildings with level or low sloped roofs that are built for long service life
6. Roofs in most highly corrosive atmo spheres
Koppers recommends that the maximum roof slope be one-half (%) inch per foot for all built-up Coal Tar Bitumen roof systems.
Koopers does, however, permit slopes up to two (2) inches per foot at flashings that incorporate tapered cants and for short run crickets or saddles for drainage, provided there are provisions for adequate back nailing, and these crickets or saddles do not cover more than 15% of the roof area.
All felts must be backnailed on slopes onehalf (H) inch per foot or more. For recom mendations on roofing procedures for slopes over H inch per foot, consult your Koppers representative.
Underwriters Laboratories, inc. Building Materials Directory. Guide No. ;360018) TFJK-Built-Up Roof Covering Materials Lists Koppers Coal Tar Bitumen and tarred felts for use in construction of Class A and B built-up roof coverings. Additional References: Roof Deck Con structions are listed under U. L. Guide No (360 RO) TGKX. Roof deck construction materials, such as vapor barriers, insula tions. and adhesives are listed under U. L. Guide No. (360 R13) TGYV.
Koppers Bonds/Guarantees are available for 5.10.15. and 20 year terms. Roof bonds/ guarantees cover ONLY the built-up roofing and flashing membrane. For further details, please refer to Page 6 of this manual.
7
General Requirements and Special Conditions
in any building the performance of the Built-UD Roofing will be affected to some degree by all of the parts of ttie roof structure system as well as the inside and outside atmospheric environment. Each component should be investigated for its compatibility with each of the others. The roof structure system may include any or all of the following:
Outside Air Conditions Roofing System Peripheral Details (Flashings) Insulation (if present) vapor Barrier (if present) Structural Deck including sub
purlins (supports) Structural Framing Air Space (if present) Ceiling (if present) Interior Air Conditions
You will find information in this manual per taining to materials and application methods other than for built-up roofing. They are offered to assist the designer in establishing their normal position in the roof structure system. They should not be construed as part of the built-up roofing system, as endorsement, nor as part of the designated specifications other than to establish a suit able roofing base in the roof structure system.
The proper design, specification and posi tioning of the various components of the roof structure system is the responsibility of the building owner or his designer. Any subseouent failures, due to either the instal lation or lack of installation will not be Kopoers responsibility.
The deck is the base over which the built-up roofing, or insulation and built-up roofing is applied Where the term deck is used in this manual without reference to insulation, it shall designate the surface over which roof ing is to be applied All decks shall be clean, smootn. dry. rigid and free of debris. Any deck defect shall be corrected before appli cation of roofing All decks shall be installed m accordance with the deck manufacturer s specifications and shall be in compliance with Koooers General Requirements.
In approving any deck as satisfactory to receive a Koooers roof, only the deck sur face is accepted. It is the responsibility of the building designer and the deck manu facturer to provide for expansion and con traction m a manner that will provide a stable base for the roofing: for support of maximum anticipated loads; secure attachments vertically and laterally, and the selection of the deck material and construction details including their ability to contain bitumens
.'KOPPERS WILL NOT ASSUME RESPON SIBILITY FOR DECK DEFECTS OR BITUMEN SEEPAGE.)
The placing of conduits, bolt heads, etc. above the roof deck and below the roofing membrane is not recommended
All projections or openings in the deck snould be completed prior to the application of the roofing
8
Optimum adhesion to the deck ts necessary for cood roof performance. Where Kopoers Bitumen or steep asphalt is used for adhe sion Questionable decks may be tested for dryness and adhesion by pouring one pint of the bitumen, heated to application tem perature. over a representative area or areas of the deck. The deck is not satisfactory if the bitumen foams or bubbles, or upon cooling to ambient temperature may be stripped clean of the deck.
Metal Decks: Decks of this type must also be free from loose rust and oily substances.
It is absolutely necessary to install board type insulation on a metal deck before the built-up roofing is applied.
A metal deck must be clean, smooth, and property anchored to the steel purlins and all joints correctly lapped and fastened.
Type of metal deck, flute opening and vari ous other factors determine the type and thickness of insulation required. Consult your Koppers representative for recom mendations.
Metal roof decks shall be designed so that they will not have a deflection exceeding 1/240 of clear span under all types of loads (live & dead). Oesigner should take into account roof traffic conditions including mechanical equipment used for roof application.
Note: When applying insulation and roofing over a perforated or acoustical type metal deck, it is recommended that a vapor barrier be installed prior to the application of the insulation or that a base sheet set in steep asphalt be utilized as the first ply of Built-Up Roofing. This is to reduce the possibility of Bitumen drippage.
Application of Vapor Barrier Below Insulation Felt Type Coat the ribs of the metal deck with Steep Asphalt and then install two (2) full thick nesses of Koppers No. 15 Asphalt Felt, lapping each sheet nineteen (19) inches over the preceding sheet, mopping with Steep Asphalt the full width of the nineteen (19) inch lap. Extend all felt up vertical sur faces and cutoff at height of insulation.
Attachment of Insulation Install insulation with steep asphalt or approved mechanical fasteners. See "Attachment" Page 10.
a. When attachment is made with steep asphalt applied to deck at rate of 12 to 15 lbs. per 100 sq. ft., place insulation while steep asphalt is still molten to provide good adhesion.
b. if slope of deck is one-half (>$) inch per foot or more, insulation must be able to retain nails and. in addition to being set in steep asphalt, insulation must be fastened to the metal deck with approved mechanical fasteners in accordance with FM require ments If two layers of insulation are specified, too layer joints shall not coincide with joints of bottom layer Fasteners shall be driven after the top layer of insulation is installed.
c. If ULand FM requirements are a factor for
insurance reasons, the insulation anq adhe sive must be listed and approved m accord ance with their current data.
In areas that may exceed the 4" per foot maximum slope requirement, all ones of tarred felt must be back nailed. Wood nailing strips must be provided when the substrate is not considered nailable.
Application of Roofing Membrane For application of roofing materials over the insulation, follow Specification No. 220. Page 14.
Precastconcrete structural sections demand the same recommendations as poured con crete decks, although the presence of mois ture, due to insufficient drying time, is not likely. If the contractor finds one or more stabs resting unevenly, with edges project ing above the surface, this should be corrected by resetting or leveling off. Open cell aggregate concrete is not acceptable for filling or leveling low areas. All joints, grouted or not. should be caulked with trowel-grade asphaltic plastic cement. Slab sides and ends should be square, rest firmly and evenly on supporting members, and be installed to prevent lateral and vertical movement.
Application of Vapor Barrier Below Insulation I.On precast concrete slab or tile deck, strip mop with Coal Tar Bitumen up to four (4) inches from the edge of each joint. Not less than 30% of the surface must be mopoed. at a min. rate of 10 lbs. per 100 square feet.
2. Lay over the entire surface two (2) full thicknesses of Koppers Tarred Felt, lapping each sheet nineteen (19) inches over the preceding sheet--mopping with Coal Tar Bitumen the full nineteen (19) inches so that in no place shall felt touch felt.
3. Extend all plies of felt up vertical surfaces and cut off at height of insulation.
Application of Insulation: Over Vapor Barrier Apply a uniform coating of Coal Tar Bitumen over the entire surface. While hot. embed the insulation. If there are two (2) layers of insulation (e.g. as required for pre-stressed concrete sections) mop the entire surface of the first layer with Coal Tar Bitumen. While hot, embed the second layer of insulation.
Application of Insulation Directly to Deck Over precast concrete or tile deck, strip mop with Coal Tar Bitumen up to 4" from the edge of each joint. Not less than 30% of the surface must be mopped at a minimum rate of 10 lbs. per 100 sq. ft. While the bitumen is stilt hot.embed the insulation. See Insulation section. Page 11
Application of Roofing Materials to Deck On precast concrete slab or tile deck, strip mop with Coal Tar Bitumen up to four (4) inches from the edge of each joint Not less than 30% of the surface mustbe mopped, at a minimum of 10 lbs. per 100 square feet.
Complete the system in accordance with Specification No. 220.
in areas that may exceed the 4" per foot maximum slope requirement, all plies of
KOPPERS 7 1/KOP Architectural and Construction Materials
tarred felt must be back nailed. Wood nailing strips must be provided wnen tbe substrate is not considered nailable.
Lighr.veignt Insulating Ccncrsts
Lightweight Insulating decks include light* weight aggregate concrete (20 to 40 lbs. per cu. ft. oven dry density); foamed concrete, gypsum and thermosetting asphaltic decks. Except for Oycon* Concrete, lightweight insulating deck systems must be capable of venting excess water vapor to the under side. Koppers will not accept these light weight insulating decks to be placed over vapor barriers, poured concrete substrates, unvented metals, or any type of base which will not permit these materials to vent from the underside. This is necessary to prevent a water vapor pressure buildup under the builtup roofing. Occasional, or spot vents through the roofing as the only venting method are not satisfactory substitutes for underside.
In addition, lightweight insulating decks shall have sufficient cohesive strength to provide firm attachment of the roofing to the deck and framing to prevent wind uplift damage or blow-offs. Nailable decks must be capable of developing at the very mini mum. a 40 pound nail pull-out or withdrawal strength. If the materials do not achieve this value, additional fasteners will be required over and above those quantities described in the ensuing specification (standard is approximately 100 fasteners per square) to achieve a minimum attachment standard of 40 lb. per square foot. Koppers will not be responsible for failure of the insulating deck to remain integral or for disbonding of the roofing from the surface of the deck.
Provisions should be made wherever possi ble to provide additional venting such as notcned wood perimeter nailers, etc., in conjunction with the venting from the under side of the deck. If board type insulation is to be aoplied over a lightweight insulating deck, provisions must be made between the fill and the board insulation to prevent fill moisture from affecting the insulation and roofing.
Thermoeettlng Asphaltic Concrete When applying the roofing membrane directly over a thermosetting Asphaltic Concrete, follow Specification 210 except the first ply of the roofing membrane must be a base sheet set in a solid mopping of steep asphalt.
Application of Membrane Below Board-type Insulation 1. Apply over entire surface one (1) ply of Koopers coated base sheet, lapping each sheet four (4) inches over preceding sheet and nailing at lap no less than nine (9) inches and stagger nailed down center of each sheet on nine (9) inch centers.
2. Extend plies up vertical surfaces and cut off at height of insulation.
For vapor barrier provisions contact your Koppers Representative.
Application ot Board-type Insulation Over Membrane (or Deck) Apply a uniform coating of Coal Tar Bitumen over the entire surface and. while hot.
embed the insulation. If there are two (2) layers of insulation mop the entire surface of the first layer with Coal Tar Bitumen and. while hot. embed the second layer of insu lation.
For application of roofing materials over insulation follow Application Specification No. 220.
Application of Roofing Materials to Deck 1. Apply over entire surface one (1) ply of Koppers coated base sheet, lapping each sheet four (4) inches over preceding sheet and nailing at lap no less than nine (9) inches, and stagger-nailed down the canter of each sheet on nine (9) inch centers.
2. Over the base sheet apply three (3) plies of Koppers Tarred Felt, lapping plies twentyfour and two-thirds (24%) inches. Where slope of deck is one-half (%) inch per foot or more, nail each sheet of felt six (6) inches from the back edge on twenty-four (24) inch centers.
All laps shall be mopped with Coal Tar Bitu men the full twenty-four and two-thirds (24%) inches, so that in no place shall felt touch felt.
3. Complete the system in accordance with Specification No. 210.
Note: In areas that may exceed the per foot maximum slope requirement, all plies of tarred felt must be back nailed. Wood nail ing strips must be provided when the sub strate is not considered nailable.
Poursd Gycsum Precast Gypsum
The same recommendations applying to precast concrete slabs apply to precast gypsum slabs and gypsum metal bound planks, except that the first ply of the roof ing membrane must be a coated base sheet fastened in accordance with the base sheet alternate. See Page 12. All uneven slabs should be reset or leveled off so that the roof will be laid on a flat and even surface, free from projections and low areas. Because these slabs are precast, the possibility of a high moisture content being present is more remote than in the poured gypsum roof or lightweight insulating concrete roof deck. Poured gypsum decks sometimes cause trouble because the builtup roofing is laid before the deck is thoroughly dry. When this happens the result is a blistered and buckled membrane, or. just as serious, insulation curls and makes an unsatisfactory job. The roofing contractor, backed by the architect, must insist on a thoroughly dry deck before beginning work. He should also see to it that the deck is free of loose sand, frozen scale and other foreign matter. Projections should be removed, low points filled with cement grout or other suitable material, and all cracks pointed up.
Application of Membrane Below Insulation 1. Apply over entire surface one (1) ply of Koppers coated base sheet, lapping each sheet four (4) inches over preceding sheet and nailing at lap no less than nine (9) inches and stagger nailed down center of each sheet on nine (9) inch centers.
2. Extend plies up vertical surfaces and cut off at height of insulation.
For vapor barrier provisions contact your Koppers Representative.
Application of Insulation Over Membrane (or Deck) Apply a uniform coating of steep asphalt over the entire surface, and. while hot. embed the insulation. If there are two (2) layers of insulation mop the entire surface of the first layer with steep asphalt, and. while hot. embed the second layer of insulation.
For application of roofing materials over insulation follow Application Specification No. 220.
Application of Roofing Material to Deck 1. Apply over entire surface one (1) ply of Koppers coated base sheet, lapping each sheet four (4) inches over preceding sheet and nailing at lap no less than nine (9) inches, and stagger-nailed down the center of each sheet on nine (9) inch centers.
2. Over the base sheet apply three (3) plies of Koppers Tarred Felt, lapping plies twentyfour and two-thirds (24%) inches. Where slope of deck is one-half (%) inch per foot or more, nail each sheet of felt six (6) inches from the back edge on twenty-four (24) inch centers.
3. Complete the system in accordance with Specification No. 210.
Note: In areas that may exceed the %" per foot maximum slope requirement all plies of tarred felt must be beck nailed. Wood nailing strips must be provided when the substrate is not considered nailable.
Coal Tar Bitumen Built-Up Roofing (continued)
. -_
~ 2"G - -- - - o - c*
The deck surface must be smooth, dry. and free of dirt, dust and deDrts. Projections should be removed, low points filled with cement grout or other suitable material, and all cracks pointed up. Roof deck shall be prooerty graded to outlets.
Application of Vapor Barrier Below Insulation 1. Apply a uniform coating of Coal Tar 8itumen to the deck.
2. Lay over the entire surface two (2) full thicknesses of Koppers Tarred Felt, lapping each sheet nineteen (19) inches over the preceding sheet--mopping with Coal Tar Bitumen the full nineteen (19) inches so that in no place shall felt touch felt.
3. Extend all plies of felt up vertical surfaces and cut off at height of insulation.
Application of Insulation Apply a uniform coating of Coal Tar Bitumen over the entire surface into which, while hot. embed the insulation. If there are two (2) layers of insulation mop the entire surface of the first layer with Coal Tar Bitumen into which, while hot. embed the second layer of insulation.
Application of Roofing Materials Over Insulation or Deck Install the roof in accordance with Specifica tion No. 220.
in areas that may exceed the Y" per foot maximum slope requirement, all plies of tarred felt must be back nailed. Wood nail ing strips must be provided when the sub strate is not considered nailable.
*. 'Plywood
Wood shall be well seasoned, dry and pref erably treated. End joints shall have adequate bearing. Loose or void knot holes, large cracks, etc., snail be covered with sheet metal.
Lumber shall be a minimum of 1" nominal thickness.
Plywood (exterior grade) shall be a minimum of Y" thickness. Hot Coal 'Tar Bitumen should never be applied directly to a wood oeck. Sandwiched between the heat from above and the heat from below, such material finds its way through the boards into the building. Good practice demands the cushioning and plotting effect of a layer of sheathing paper followed by layers of dry felt Shipiao and square edge boards should be avoided where possible, if the underside of the roof deck is exposed to air pressure created from open doors or windows, tongue-and-grooved lumber should be used.
Preparation Below Insulation 1. The wood roof deck snail be covered with one (1) layer of approved rosin-sized sheath ing paper weighing approximately five (5) pounds per one hundred (100) square feet. The sheathing paper shall be lapped two (2) inches and secured to the deck by occasional nailing.
2. Two full thicknesses of Tarred Felt shall be laid over the entire surface, laopmg each sheet nineteen (19) mcnes over the pre
ceding sheet and nailing on 8V$" centers, one inch from edge lap.
Application of Vapor Barrier Below Insulation Note: When vapor barrier is required, use these procedures in addition to Preparation Below Insulation noted above.
Lay over the entire surface two (2) full thicknesses of Koppers Tarred Felt, lapping each sheet nineteen (19) inches over the preceding sheet--mopping with Coal Tar Bitumen the full nineteen (19) inches so that in no place shall felt touch felt.
Application of Insulation I.Moo the entire surface with a uniform coating of Coal Tar Bitumen into which, while hot, firmly embed the insulation.
For application of roofing materials over insulation follow Application Specification No. 220 on Page 14.
Application of Roofing Materials Directly on Wood For application of roof materials directly on wood decks follow Specification No. 210 on Page 13.
In areas that may exceed the per foot maximum slope requirement, all plies of tarred felt must be back nailed. Wood nailing strips must be provided when the substrate is not considered nailable.
Structural Wood Fiber
All decking must be installed in strict accord ance with the particular deck manufacturer's recommendations for installation. Deck material must be protected during shipment, job site storage and prior to roofing applica tion. No planks which have become struc turally weakened due to moisture, fractures or mutilated edges may be used. All joints must be level and preferably grouted full and level with plank surfaces are recom mended by the deck manufacturer. All planks must be well anchored to supporting members to resist movement in a fashion recommended by the deck manufacturer. Any planks which bow or deflect or do not seat securely must be replaced. Respon sibility for the selection of a particular type of wood fiber deck, its installation, provision for expansion and contraction, its suitability to job requirements, and its ability to support anticipated loads in its environment rests with the designer and deck manufacturer.
Decks of these types, whether grouted or not. shall be caulked with Koppers Flashing Cement which shall be applied so that the top surface ie level and smooth. Felt strip ping four (4) to six (6) inches wide set in a troweling of the cement is required to assist in leveling uneven joints and bridge the joint openings thus providing a better sur face for the roofing materials.
Caution: care must be taken to avoid bitu men drippage.
Application of Insulation Install insulation in a uniform coating of Type ill steep asphalt. Nailable insulation not exceeding one (1) inch thick may be installed using i& inch Simplex Tube-Lok nails in accordance with the insulation manufacturers specification. Installation of
roofing over insulation shall be as per spec ification outlined below with base sheet mopoed solidly to the insulation m steep asphalt as the first ply.
For bonded roofing applications, fasteners, other than Tube-Lok nails, must be accept able to Koppers. Fasteners shall be applied at the minimum rate of one (ij per square foot as recommended by the Structural Wood Fiber Products Association.
Application ofVapor Barrier Below Insulation Install two (2) plies of No. 15 asphalt felt lapped nineteen (19) inches in Type 111 steep asphalt. Plies shall be moooed solidly so that in no place shall felt touch felt, install insulation in solid mopping of steep asphalt. Roofing over insulation is to be in accord ance with Specification No. 220 with a base sheet mopped solidly to the insulation as the first ply.
Application of Roofing Materials Direct to Deefc Install roofing in accordance with Specifica tion No. 220 exceot that a base sheet, set in steep asphalt, must be substituted as the first ply. See "Base Sheet Alternate" Page 12.
Complete the system in accordance with Specification No. 220.
In areas- that may exceed the H" per foot maximum slope requirement, all plies of tarred felt must be back nailed. Wood nailing strips must be provided when the substrate is not considered nailable.
Material Protection
It is the responsibility of the roofing con tractor to protect all roll roofing materials and roof insulation from ground or con struction moisture and weather before and during construction.
Attachment
Maximum adhesion or secure attachment of all components in the roofing assembly is necessary for satisfactory long term per formance of the roofing membrane. Adhe sive and/or fastener quantities specified by the manufacturer must be capable of passing a minimum uplift resistance of 40 pounds per square foot (psf).
When Building Code requirements dictate a higher uplift resistance than our minimum requirement, additional fasteners or adhe sive will be required over and above the quantities described in the ensuing specifi cations.
Solid moppings of hot applied bitumen have been found to provide an uplift resistance in excess of 120 psf.
Strip mappings of hot applied bitumen have been found to provide an uplift resistance in excess of 60 psf.
When nails or fasteners are used, they must be nailed through flat tin disks or have sufficiently large heads to prevent fracture or puncture through the roofing felts.
The following are the names of some manu facturers who provide nail and/or fastening devices for use with built-up roofing:
10
KOPPERS 7 1/KOP Architectural and Construction Materials
E/S Products. Inc. New Rochelle. NY
Simplex Nail & Manufacturing Corp. Americus. GA
Independent Nail Corp. Bridgewater. MA
E. G. Building Fasteners Corp. New York. NY
Hot applied adhesives or mechanical fasteners are the preferred means of attachment.
Koppers wilt not be responsible for any damage caused by or the result of unsatis factory attachment.
For further information contact your Koppers representative.
Expansion Joints (Building)
Since all materials expand and contract due to temperature and/or moisture, the use. location, and design of building expansion joints, especially in the roof structure system, should be taken into consideration at the time of original building design.
Although provisions for adequate expansion joints are the responsibility of the building designer. Koppers offers the following recommendations for the protection of the roofing system against.epiits caused by expansion and contraction of the building. Building expansion joints should be installed.
1. On roof areas larger than 200 feet in each oirection
2. At all places where the structural supports and roof assembly change direction
3. Where type of adjoining deck materials change
Where control or expansion-contraction joints are provided in the structural steel, deck material, or deck system, provisions must be made for continuation of this relief through the built-up roofing system. Koppers realizes that in a climate controlled building there may be little or no expansion AFTER the building is in use. however, building expansion joints are still recommended based upon the following points:
1. During construction the building will not be under a steady state temperature/humid ity condition so that thermal and moisture movement can be sufficient to fracture the roofing.
2. if no building expansion joint is provided, the owner must keep the building at the steady state temperature and humidity con dition at all times, as holiday shut-downs can fracture the roofing due to the move ment of the roof system resulting from temperature/humidity vanation.
3. If the occupancy is fairly large, the sudden entrance on a rainy day of many rain-soaked employees may cause moisture movement in the roof structure system which can fracture the roofing.
Water Stops (Temporary Protection)
Water stops consisting of two (2) plies of tarred felt and mopping of Coal Tar Bitumen extending onto the deck and insulation at least 6" and 4". shall be applied at the end of
each day s work over exposed edges of insulation.
These temporary protective measure* must be removed cieenty when work is resumed to prevent MocMng moisture vapor move ment to vented edge details.
Cut Offs
(Permanent Installation)
Venting of roof insulation at walls, curbs, eaves, etc. is recommended for all but a few special roof structures. Therefore, cut-offs should not be installed at edgee of insulation adjoining these areas for venting purposes.
Cut-offs may be installed however, provided they are constructed to run in one direction continuously to vented edgee and provided no section of the roofing, is isolated or blocked from venting.
Vapor Barrier
Vapor barriers are nonrally used wftjre the heat flow direction and/or huuHdfly'withln the building, during any climate or occu pancy cycle, might cause the dew point or condensation to occur under the built-up roofing within the insulation chamber. It is important that the vapor barrier, when installed, provide a continuous seal, (includ ing ventilators, skylights, peripheral walls, and other terminations) from the source of the water vapor.
Insulation
Insulations come in varying thicknesses and sizes. Should the manner of attachment as suggested conflict with that specified by the individual insulation manufacturer, the insu lation manufacturers specifications shall be followed and in addition, shall be in compli ance with Koppers General Requirements.
Good roofing practice dictates that the fol lowing points be considered when specifying board type roof insulation.
1. The roofing insulation must be kept dry at all times. It must be of a type approved by Koppers for use with a Koppers built-up roof. It should only be applied over a deck com plying with all of Koppers General Require ments.
2. If the roof deck slope is one-half W) inch per foot or more, the insulation must be able to retain nails or wood nailers must be installed perpendicular to the slope at each course of insulation.
Spacing of nailers must be such that the insulation fits snugly with the nailers but must not.be force fitted.
3. No more insulation shall be laid at any one time than can be protected by bitumen and felt m case of sudden weather changes.
4. Edges of insulation shall be brought closely together and shall not be forced into place. Where insulation joins vertical sur faces. the insulation shall be cut in a neat manner allowing approximately one-half (H) inch clearance.
5. When more than one (1) layer of insulation is used, joints in each layer shall not coin cide. All layers shall be parallel to preceding layers.
Note: When a roofing membrane and insu lation system is installed over a non-porous substrate (concrete, vapor barrier, etc.) a pressure build-up may result. Roof vents mfy be considered to relieve this pressure.
'/Vcod Nailing SiriBs
All non-nailable decks require wood nailing strips at eaves, edges, walls, roof openings, etc. for proper securement of metal flanges. Nailers must be securely and firmly attached to the deck or through to its supoorting members. Nailers shall extend not less than 1" beyond the aoron or flange.
Roof* felts for ail deck areas having a slope of per foot or more must be back nailed and therefore non-nailable decks must be furnished with treated wood nailing strips treated with a material compatible with bituminous roofing.
Cold Storage and Freezer 3uiidings
Koppers will not bond its built-up roofing over these structures if insulation or insula tion and vapor barrier is installed over the deck unless there is an adequately ventilated air space between the deck and insulated refrigerated area.
For procedures on non-bonded built-up roofing applications, consult a Koppers representative. When a guaranteed system is reauired. refer to KMM Specifications. Page 23.
'/Vater-Retaining and Raiardad Drainags
When the roofing system is subjected to common standing water or retarded drain age refer to the Soecial Applications Section. Page 15.
Tampcrary Rcc^rg
Temporary roofing specifications are avail able for all Koppers Coal Tar Bitumen BuiltUp Roofing Systems. Consult your Koppers representative for recommended specifica tions over various type decks for temporary roof construction.
2r*i Application
'- a
Application of BHumor* Recommended Weights per 100 sq. ft. (for
estimating purposes only)
Koppers Coal Tar Bitumen
Steep Asphalt
Average Interply
25 lbs. 23 lbs.
Top Coating
75 lbs. 60 lbs.
Average interply weights are based on long years of experience in good roofing practice, and take into account a reasonable variation m the amount of bitumen absorbed in differ* ent substrates, and the type of specification. Moopings of bitumen between felts shall be continuous.
Rett Shall Not Touch Felt It is generally agreed that maximum strength between layers of felt is achieved by the thinnest practical glue line of bitumen. Too thin a layer starves the lap. whereas an excessive layer can permit interply move ment on sloped roofs.
Flood Coat The top pouring is most important, it must be thorough and uniformly covered with specification aggregate embedded into the bitumen while the bitumen Is stHI hot.
Recommended Temperature Limitations:
Kettle Temp. Koooen Coal Tar Bitumen 300-425!=
StMO Asofiaft 350-475F
Application Temp.
350-400F
40tW50F
When roofing bitumens are excessively overheated and/or held for long periods of time, their waterproofing qualities are greedy reduced, and at the same time the volume of fuming is increased, in order to achieve the maximum benefits of low fuming and uneoualed waterproofing performance, it is imperative that Koppers Coal Tar Bitumen be heated within the temperature limitations listed above. Close supervision of heating is also good roofing practice for all bitumens.
If heat is desired during a holding period at the jobsite while material is not being drawn off and replenished as under normal usage, kettle temperature should be reduced and not permitted to exceed 350F for Koppers Coal Tar Bitumen or 42SF for steep asphalt. The kettle should be full lid closed. These temperatures are applicable to iob condi tions and do not apply to holding or storage m kettles in excess of a hours. If bitumen is not to be used for periods over 4 hours, the kettle should be shut off.
Koppers Coal Tar Bitumen may be contained in 100G gal. or greater capacity heated and automatically controlled closed vessel tankers at 375F for periods not exceeding 96 hours.
Application of Felt Plies of felt must be laid shingle fashion.
Where a water flow direction exists, felts should be applied so that the direction of flow is not against the laps. Broom or oress all plies of felt into the hot bitumen and lay
12
without wrinkles, buckles or kinks, so that the finished roof is free of pockets or blisters. Each felt ply shall be completely covered with a complete mopoing of bitumen.
The number of plies are controlled by vary ing widths of the edge laps. Four-ply (4) roofing, for example, is achieved by lapping each ply approximately twenty-seven and one-half (27H) inches.
Koppers felts are marked at the factory with lap lines for this purpose. Except as specifi cally provided for in Koppers specifications, application of felt lapping methods other than shingle fashion will not be permitted.
When beginning a membrane roofing instal lation. appropriate width starting strips of felt shall be used at the starting point to achieve the specification ply build-up at that point so that successive felt applications will produce the ply requirements. Overlap ends of all connecting plies of felt (end laps) not less than 10 inches. End stripping or taping of these laps is not permitted.
Application of Koppers Bitumen and Aggregate Surface The final application of Koppers Roofing is a triple weight application of Koppers Coal Tar Bitumen (approximately 75 Ibs./sq.) into which is distributed an approved aggregate while the Bitumen is still hot.
Benefits of aggregate surfacing 1. Protection from foot traffic of other trades during construction and afterwards for routine roof maintenance.
2. Weight as additional protection for wind uplift.
3. Reduced surface temperature.
4. Even flow of water to the drains.
5. Fire protection from burning brands.
6. Protect bitumen from the actinic rays of the sun.
7. Most important--by using an aggregate surface, an additional 75 Ib./sq. of Coal Tar Bitumen (the waterproofing agent) is included in the installation.
The application of Koppers Coal Tar Bitu men and aggregate must be done at the time the felts are applied: except in periods of hot. dry weather when the too surfacing may be delayed overnight.
When the specifier desires glaze coating and/or all work to be completed the same working day. he shall be responsible to so state this requirement in nis specifications.
The aggregate surfacing must be applied into the too pouring while the bitumen is still hot so that a uniform layer will be embedded and adhered. The completed roof assembly will have a uniform aggregate surface. Depending on slag weights in certain parts of the country 400 lbs. of slag per square may be required. Occasionally on well applied roofs, small black globes known as ''raspberries'' or "blackberries'' will form in the roof surface. These are not detrimental to the roof.
Aggregate Surfacing The aggregate to be used should meet the ASTM Specification D1803-64. The basic requirementforthis aggregate are as follows:
Sieve Size %"
H" X" NO. 4
No. 8
Dust. max. pet. Moisture, max. %
crushed stone and gravel Crushed roofing slag Unit weight (loose)
min. lb. per cubic ft.
Total Passing, Percent 100 90-100 40-70 0-15 >5 0.5
0.5 5.0
60
Cold Weather Application When roofing is applied at temperatures below 45F. special precautions must be taken to insure the satisfactory performance of the finished roof. Before applying roofing,
moisture, ice, snow, surface water, etc., must be removed from the deck.
Hot applied bitumens tend to congeal rapidly m cold weather. Extra care must be taken to set insulation or roofing as auickly as pos sible while the bitumen is still hot.
Do not heat bitumens above the maximum temperature limit listed sbove to compen sate for rapid chining, insulated containers along with carefully timed material delivery methods, must be employed.
Base Sheet Alternate When substituted for the first ply in a solid mop application specification, the Base Sheet shall be embedded in a solid mopping of Koppers Steep Asphalt followed by thorough brooming to eliminate air pockets, wrinkles, fish mouths, buckles, etc. The remaining three (3) plies of tarred felt shall be solid mopped with Coal Tar Bitumen in accordance with the specification.
When substituted in a nailing application specification, the Base Sheet may be used in lieu of the two nailed No. 15 tarred felts. When rosin sized or sheathing paper is a part of the original specification it shall remain and be applied beneath the Base Sheet. Edge laps shall be 4" and end laps shall be 6". The nailing pattern for the Base Sheet shall be 9* on center through the lap and 2" from the edge lap and stagger-nailed down the center of each sheet on 9" centers. (Note: This is approximately 100 nails per square.)
After applying a base sheet as the first ply on the four (4) ply roofing membrane, three (3) additional plies must be installed at once.
When applying the additional three (3) plies of tarred felt, lap each ply shingle fashion 24?$ inches. Each oly must be solid mopped with Coal Tar Bitumen.
When specifying the Base Sheet alternate use of the designation BS as a subscript to the specification number, such as 210 BS (structural wood fiber deck).
Note: If Koppers Asphalt Coated Base Sheet (ASTM D-2626) Is substituted for the hist ply
of the Coal Tar Bitumen roofing specifica tions, it must not be left exposed or used as a work surface or temporary root prior to roof completion. Good roofing practice dictates that the total roofing membrane be
complete the same day.
)
\ J
Koppers Coal Tar Bitumen Built-Up .Beefing
Speci/iCSiion Mo. 210 Supersedes Specs. No. I.No. 12
KOPPERS 7.1/KOP Architectural and Construction Materials
:=c, 5 dac.<3 jiaiicn:
Plywood, wood plank, lightweight insulating concrete, poured and precast gypsum.
j'.zza aauirerrar.ts:
H" per foot maximum.
Materials Required per 100 sq. ft. of roof area (for estimating purposes)
Rosin Sheathing Paper* Tarred Felt (Nailed)** Tarred Felt (Mopped in Bitumen) Roofing Bitumen (3 moppings <3 25 Ibe. each)
Top Pour Coat Surfacing: Slag
Gravel
Wood Decks only. Unless otherwise indicated.
1 ply 2 plies 3 plies 75 lbs.
75 lbs. 300 lbs. 400 lbs.
Procedure
1. General Requirements on Pages 8 through 12 and Flashing Detail Specifica tions on Paget 18 through 20 are a part of this specification and must be adhered to where applicable.
2. When a vapor barrier and/or roof insula tion are required, install m accordance with the manufacturer's instructions and comply with Koppers General Requirements and Special Conditions. Follow Specification No. 220 for roofing materials applied to insulation.
Application of roofing direct :o roof deck:
I.Over the surface of the roof deck install one layer Rosin Sheathing Paoer weighing approximately 5 lbs. per 100 sq. ft. Lap each sheet at least two (2) inches and nail suf ficiently to hold in place. (Wood decks only.)
2. Install two (2) plies of Koppers Tarred Felt over entire surface lapped nineteen inches.
Nail on eight and one-half (8H) inch centers one (1) inch from edge lap.
Note: (This is approximately 100 nails per 100 sq. ft.) Nail shanks are to be of required length for maximum withholding power.
Lightweight insulating and gypsum roof decks require a base sheer as the first ply. Consult the appropriate deck requirements listed under General Conditions.
3. Over the entire roof area, apply three (3) plies of Koppers Tarred Felt lapping plies twenty-four and two-thirds (24?$) inches. All laps shall be mopped with Coal Tar Bitumen the full twenty-four and two-thirds (24?$) inches, so that in no place snail felt touch felt.
4. On short run slopes, such as on crickets and saddles, one-half inch per foot or more, nail each sheet of felt six (6) inches from the back edge on twenty-four (24) inch centers.
5. Pour over the entire surface of the roofing membrane, a uniform coating of Coal Tar Bitumen, and. while hot. embed not less than four hundred (400) pounds of gravel or three hundred (300) pounds of slag for each one hundred (100) square feet.
13
Koppers Coal Tar Bitumen Built-Up Roofing (Continued)
3 " rOi
licr. ,'ic. 22C Supersedes Specs. No. S, No. 10, No. 23, No. 17wl, No. 27
Precast Concrete. Poured Concrete. Structural Wood Fiber*.
- :cf Insulations:
Various Decks.
3.CC3 rscuiremsnts:
per foot maximum.
Material Required per 100 sq. ft. of roof area (for estimating purposes)
Tarred Felt (Mopped in Bitumen) Roofing Bitumen (for mopping <8 25 lbs. each)
Top Pour Coat Surfacing: Slag
Gravel
4 plies 100 lbs.
75 lbs. . 300 lbs.
400 lbs.
'NOTE: On structural wood fiber decks, the first ply must be a Koppers. coated base sheet sat In a solid mopping of steep asphalt (see structural wood fiber, page 10).
Procedure
General Requirements on Pages 8 through 12 and Detail Specifications on Pages 16 through 20 are a part of this specification and must be adhered to where applicable.
When a vapor barrier and/or root insulation are required, install in accordance with the manufacturer's instructions and comply with Koppers General Requirements and Special Conditions.*
1. Mop deck (or insulation--as applicable) completely with Coal Tar Bitumen.
2. Apply over the entire surface four (4) plies of Koppers Tarred Felt, lapping plies twentyseven and one-half (27K) inches. Mop. solidly between each 27H inch lap with Coal Tar Bitumen so that in no place shall fait touchfslt.
3. On short run slopes of one-half (K) inch per foot or more, such as on crickets and saddles, and when the deck permits nailing, nail along back of upper edge of each sheet on twenty-four (24) inch centers. Where deck does not permit nailing, nailing strips are required and each sheet must be nailed along back or upper edge at spacings to assure penetration of nailers.
4. Pour over the entire surface of the roofing membrane a uniform coating of Coal Tar Bitumen, and, while hot. embed not less than four hundred (400) pounds of gravel or three hundred (300) pounds of slag for each one hundred (100) square feet.
14
Special Applications:
rv
r
Water Cooled Roofs
Spray Systems Ponded Systems
Water Retaining Roofs
Process Water
Retarded Drainage Systems
Controlled Flow
Discussion
Due to Coal Tar Bitumen s natural resis tance to water, it may be utilized in the construction of built-up roofing membranes that will be expected to hold water over long periods of time. When applying a membrane that is required to hold water, follow Spec ification 220 for applications over nonnailable decks (four plies of No. 15 Tarred Felt set in solid moppings of Coal Tar Bitu men).
Note: The base sheet alternate should not be used.
When the roof is water cooled or has been designed to be continuously wet the top surfacing of bitumen and gravel must be applied as follows:
1. Pour over the entire surface of the roofing membrane a uniform coating of Coal Tar Bitumen. While hot, embed not less than four hundred (400) pounds of gravel or three hundred (300) pounds of slag for each one hundred (100) square feet.
2. All loose gravel or slag shall be swept from surface and a second uniform pouring of approximately eighty-five (85) pounds of Coal Tar Bitumen shall be applied over the gravel or slag, into which while hot, shall be applied a second layer of three hundred (300) pounds of gravel or two hundred (200) pounds of slag for each 100 square feet. The entire surface shall then be thoroughly broomed free from all loose gravel or slag, it is advisable to roll the finished surface with a light roller so that aggregate is thoroughly embedded.
3. All flashings will be KMM membrane similar to Specification No. 710 on Page 16 except that a layer of Standard Grade KMM membrane must be installed in KMM adhe sive prior to the application of the KMM Aluminum membrane too ply.
NOTE: Roofs equipped with controlled flow drainage systems do not require the extra top pour and gravel application.
Design consiCersticr.
When designing a water cooled, water retaining or retarded drainage roof assem bly. certain design criterion must be considered.
Note: 1. Due to the extremely heavy weight loads normally associated with retained water, pour and precast concrete or other heavy load bearing decks must be specified. Wood or metal decks should only be considered whera ponded or standing water is at a minimum.
Note: Decks requiring a base sheet as the first ply of the roofing system are not per mitted for this application.
2. Roof Structure design live loads for this application shall be a minimum of 50 psf and deflection shall not exceed 1/360 of the span, both in addition to the anticipated weight of the water. Insulation joints must be taped in single layer applications. Vapor barriers must be two ply and solid mopped. Use steep asphalt over metal decks. Wood must be. treated to prevent warping (see "wood nailing strips").
3. At points where water pressure from a spray system may be excessive, the roof surface should be protected with treated board platforms or other suitable construc tion to break force of the water. These plat forms should be laid on top of the roof surface and not fastened to the deck.
4. Insulation under a Water Cooled Roof should be of a type which is rigid, dimen sionally stable with high compressive strength.
5. IT IS MANDATORY THAT THE WATER COOLING SYSTEM BE CLOSED DOWN AND THE ROOF DRAINED PRIOR TO COLO WEATHER. Neither roofing nor the structure will withstand the expansion caused by ice formation.
KOPPERS 7.1/KOP Architectural and Construction Materials
I
"sshir.a Systsms
k ...* ,- 1i , M.< "
--Wk
M^ ** <<'* ** * < W W 1 4 4 . >
A\ ^` v-* ` ' / wli\
'^i
.
WI
.O
'*3.3..] ~ ^ - -- a-ij,-'.
Flashings are the terminal closures of a roofing system which perform a water proofing, and m some systems, a decorative function. Flashings must be installed at all intersections formed by vertical surfaces. Their importance cannot be stressed too strongly Water entering the roofing system through flashings can result in water vapor forces which can destroy the effectiveness of the roofing and insulation.
Koopers flashings are an integral part of a
Koppers roof. Designed for flexibility. KMM Aluminum flashings will provide maximum service life.
Flashing should be installed as roofing progresses to prevent possible water damage to insulation or deck under the roofing.
Note:
1. If bonded/guaranteed flashing is required, it must be installed in conjunction with a Koppers bonded/guaranteed roof and can be bonded/guaranteed for standard periods
up to but not greater than the period for which the roofing 1$ bonded/guaranteed. To be bonded/guaranteed, flashings must be set at least 8" above the roofing base
2. Metal Cap flashings are not bondable and are not included under any flashing bond/ guarantee.
3. Metal work of any description used as flashing or a part of a flashing system is not bondable and is not included under any flashing bond/guarantee.
--a
:/ jcis v/Ai Ccsi .er sic'jmen Mambrana Acciicaixns
,\o. . 'J
-sail
Raggie to b Sailed
T*Metal Counter Flashing. --Extend Downward * Pnme with Koooers Hl-PEN Primer 452 KMM Aluminum
KMM Adhesive Cant Stno to oe Set m Bitumen or Mastic Koooers BuiIhjo Roofing
*_!L__Ts~a
KMM to Exttno a
t! Mm ol 4"on to Roofing i ;--------- *--------:------------ L
I
\
-- 0*ck ot all Typas Cementitious Type Wall
This specification is applicable for use with any built-up membrane roofing system where its terminal closure intersects a vertical surface, such as a parapet wall.
Koppers Flashing Specification 710 consists of an aluminum surfaced KMM membrane applied to waterproof the terminal closure of the roofing system. The KMM Aluminum membrane forms a waterproof flashing sys tem by total adhesion to its substrate and through the use of joint heat fusion, a unique process whereby all contiguous joints are affixed together to develop a monolithic waterproof flashing system.
Application This specification system shall use KMM Aluminum Grade membrane as the mam flashing membrane.
1. When flashing is to be installed over a porous cementatious surface, apply a prime coat of Hi-Pen Primer at a rate of 4 to h gal. per 100 sq ft. Allow to dry four hours minimum.
side of flashing that will contact roof membrane.
4. While the adhesive is still tacky, set a layer of KMM Aluminum membrane into place extending from 4" onto the roofing membrane to above the too of the cant strip a minimum of 4". Adiacent pieces shall be side lapped a minimum of 4".
5. Rub. brush or roll thoroughly to obtain proper adhesion and to remove all entrapped air from under the flashing membrane.
6. Substrate-fuse flashing that extends above termination of roof membrane Interply-fuse all laps and that which extends onto roof surface.
7. The contractor shall thoroughly inspect the completed flashing system at the end of each day's work.
.8 A high quality varnish-base aluminum
paint may be applied to any exposed streaks or seams of bitumen.
9. Install metal counterflashing as required.
2. Each course of KMM Aluminum mem 10. Complete the top surfacing of the roof
brane shall be unrolled and cut to maximum ing membrane to the base of the cant strip
length of 11 ` prior to setting in place.
as may be specified.
3. Apply a coat of KMM Adhesive at a total rate of 1 to 1H gal. per 100 so. ft. to all areas of the completed roof membrane to be covered with KMM flashing, and on under
Note: Teiminations of flashing specifica tion #710 may be accomplished without a sheet metal counter flashing. See page 30.
i
16
T'
;
KOPPER5 7 1/KOP Architectural and Construction Materials
25-erai irfcrmaiicn
There are numerous flashing details that have been proven by experience over the years. There are normally a number of acceptable construction details for accomplishing one purpose. The architect should select a detail that best serves the purpose under the various and different conditions concerned with the specific job at hand. In certain cases, slight modifications are necessary to adjust a proven detail to job conditions or one method may serve better than another.
The details shown in this manual are some suggestions based on experience. Space limitations prohibit listing many others.
Design or selection is a responsibility of the architect.
Koppers representatives are available to review flashing details to assist the architect in providing the best details for specific jobs.
- gjs3Q iEdC3
Metal Cao Set m Koppers Plashing Cement
Nail* spaced i * from edge of metal strip and 3* apart through neo-
O-nr-'.-'O*.. 3rou n?- - 4;..*L r1_ .-- --.4' .1r r_. .~- ~^ *._S 4_. 9 .J 4 ^ 4 --M
Metal Counter Flashing,
to be Seated and Tightened with' Lead Wedges.
Flashing Spec. *710 Cant
Koppers Roofing
T
Mm 8*
Deck
Treated Wood Nailer Note' Wall Shall be Prepared to
Eliminate water Penetration Through Concrete to Underside of Roofing
. nJli r*......k ill i . -.
Decorative Wall Cap
1 Ply KMM Membrane .Std. Grade) Set m
Adhesive and Heat-fused
Treated Wood Nailer
Fasteners Spaced t" from edge of Metal Strip and 3" Apart through
C Neoprene Wasners
:int
1 Ply KMM Membrane
Treated Wood Nailer Fastened to Deck Cant 4" x *"
'.sr.i Supocrt
1 Ply KMM Membrane Sto. Grace) Set in Adhesive and Heat-fused
Flashing Spec *710
LagScraw Neoprene Pad Sheet Metal
V.
Wood Cant *'
Treated Wood Nailers
Metal Counterflasning (When Required) Extend Downward 4" Set in
17
Flashing Details (continued)
Structural Attaenmam wittt wat*fSti(*g ooitmrouon NtODran* W**nr)
Naooran# PM
1 Ply KMM Mamorana (Std. Graoal jat in Aahasiva and Haat
PuMd
Finding Specs. 710
Cant
Treated Wood Nailer Surrounding Column
Stub Column Attacned to Structural Framing
.t'jrs Columns. Sign
At alt locations where stub or future columns, sign supports and angle irons are to penetrate built-up roofing. Koppers recom mends wooden curbed base units with cant strips to be installed to accept KMM flashing systems. Where structural steel section
:r:s -:r,
e irons
extends beyond "stub" height, metal cap flashing with tight fit to the structural section must be fabricated and continuously welded to the projection to assure a watertight metal cap.
Ono Flawing Sar in Kopoara
. . z .or-oion Joint
Curb expansion joints are to be flashed in accordance with Kopoers specifications for parapet walls. Metal cap must be designed to exoano so as not to disturb flashing. It is tne responsibility of the designer of the building to provide for adequate expansion joints. For the protection of the roofing system against splits caused by expansion ana contraction. Koopers recommends that an expan sion joint be installed: (1) on roof areas larger than 200 feet in eacn direction. !2) at all places where the structural supports and root assembly change direction, (3) where type of adjoining deck matenals change. Where control, expansion, or contraction joints are provided in structural steel, deck material, or deck system, provisions must be made for continuation through the roofing system. See (Expansion Joints) Page 11.
18
All roof drains shall be orovided with metal roof drain flashing flanges which extend at least 12" beyond drain opening and shall be stripped with felt in accordance with drain detail. All drains should be provided with expansion joint sleeves.
The sheet metal flange furnished with the drain must be cemented to me surface of the felt with hot Coal Tar Bitumen or flashing cement. Over the flange apply, with alternate moppings or trowelings. two (2) reinforcing plies of felt so that the first extends not less man three (3) inches beyond the outer edge of the flange, and me second not less man six (6) inches.
Roof drains must be of a type provided with a wide lead or
cooper flange. Strainer construction should provide adjustment
for meeting variations in roof level or slope.
''
To obtain proper drainage, roof drains should be located at points of lowest expected deflection in roof deck.
Note: Special care must be taken to prevent bitumen migration into dram openings.
KOPPERS 7 1/KOP Architectural and Construction Matenals
For Wood Deck* Fill About i" Oeeo with Cement Mortar Before. Pouring Bitumen
a metal cao flashing may be attached and sealed to me oroiectioo
Metal Pan Set in Bitumen and Filled witn Bitumen
or Koboers Tar Baaed Cement
Loose Insulation
Roof Vent
Pitch Pocket
Koooers does not recommend occasional or spot vents through , Although controversial, the "Pitch Pocket" is one of the most
the roof as the only venting method or a substitute for underside ] frequently used design details.
or continuous vented systems. There may be certain instances
The sheet metal flange must be cemented to the surface of the
where spot or mushroom type vents might be deemed advisable
felt with hot coal-tar-bitumen or flashing cement. Over the flange
by the designer for a new building (eg. at expansion joints for
j apply, with alternate moppings. two (2) reinforcing plies of tarred
vent relief on long run underside continuous venting systems, etc.) ' felt so that the first extends not less than three (3) inches beyond
the outer edge of the flange and the second no less than six (6)
inches.
i Fill metal pan with hot coat-tar-bitumen or flashing cement. Paint i exposed sections of all reinforcing rods with damoproofing paint.
Walkways (Treated Wood Walkway)
Traffic Pad
= ccf Ccening
Curbs extending a nominal 8 inches to 12 inches above roof surface shall be provided at all openings for skylights, ventilators, expansion loints. etc., to provide for installation of KMM flashing.
Vtntilttor
Flashing Specs 710
Treattc Wooa Nailers
19
Flashing Details (continued)
Tcoersd Cant
Plangt wiath 4" minimum Gr*v*l SloOo t-4Minimum I'Heigtit Metal Gravel Sloo Set m Koooera -" Flaming Cement Felt Envetooe
Treated Wood Nailer
I vWt WW
I Il
Nails soaced t" from eoge of metal jtno ano 3' apart in treated wood nailing strip
' Two Plies of Felt Feathered , over Flange m Coal Tar Bitumen or Tar Base Cement Taoered Cant Max incline 2* per foot
Roofing Mamerane
System
Flange width 4" minimum
Gravel Stop Minimum r Height
Metal Gravel Stop Set m Koooea ' Flashing Cement
Metai Pitch Oam Set m Koooers Flashing Cement
insulation
Treated Wood Nailer
Nails soaced f * from edge of metal stnp and 3* apat in treated wood nailing stno.
Two Plies of Felt Feathered r over Flange m Coal Tar
Bitumen or Tar Base Cement Tapered Cant Max incline 2" per foot Roofing Membrane System
insulation
hanging Gutter
Koppers Roofing
Appropriate Nails and Length For Maximum Anchorage
Metal Gravel Stoo With 4" Flange Bedded in Koooers Flashing Cement
Felt Envelope Set in
Mm, 4" Wide Troweling
-- of Koooers Flashing j
Cement
fMin.
' Edge Stno. Nailed 6" O.C.)
Hangers. 30* O C.
Vented =dge
Gravel Stoo nailed 1* from inner edge of Flange and 3* O C
-Flange width 4* minimum -Koooers Roofing i--Two Plies of Felt Feathered Over Flange m Coal Tar Bitumen or Tar Base Cement .Taoered Cant Maximum incline--2" per foot
Flange Set in
.
Koooers Flashing /
Cement
/
Felt Envetooe
insulation Treated Wood Nailer ' Vent Hole Openings 18* to 24* O.C.
. 5nt ?:pes. Siscxs. Fisgpcies. anc Other -rejections
Lead Sleeve with Flange set in Koooers< Flashing Cement
Two Felt Strios Set in Bitumen over Lead Flange
Metal Bitumen Oam Set in Koooers Flashing Cement
All vent pipes, stacks, flagpoles, or other projections penetrating the built-up roofing, whether indicated on drawings or not. must have a proper metal sleeve flashing with flange, pan flashing with flange or other flanged flashing installed.
Behind metal sleeves and beneath the roofing membrane next to deck install a metal bitumen dam as shown in detail. The sheet
20
Set in Koooers Flashing Cement
metal flange must be cemented to the surface of the felt with a mopping of hot Coal Tar Bitumen. Over flange apply, with alternate mopping*, two (2) reinforcing plies of felt eo that the first extends not less than three (3) inches beyond the outer edge of the flange and the second not less than six (6) inches.
r
KMM* Membrane Systems
Materials and System
Description
KMM membrane is a versatile, prefabricated sheet of cold-applied roofing and water proofing material, it is designed for applica tion m roofing, reroofing, maintenance roofing, foundations, plazas and vanous other areas of construction where effective waterproofing is reouired. KMM membrane is supplied in two grades:
Standard KMM Membrane
Standard KMM membrane is a five-layer laminate composed of a thick, flexible plastic core protected on each surface by a layer of modified bitumen and an outer film of polyethylene.
KOPPERS 7 1/KOP Architectural and Construction Matanafs
is afforded to the KMM surface by other in a completely waterproof system. It is
means. Standard KMM membrane is appro factory-made and provides a factory-assured
priate for use in vertically as well as hori quality material of uniform thickness and
zontally applied waterproofing systems composition.
c where surface protection is specified.
The function of the bitumen covering is to
Aluminum KMM membrane is ideally used protect the central plastic core from damage
in roofing systems in which the roof slope is during installation, to provide the basis for
too steep to permit aggregate surfacing. It is the heat fusion between the sheets and to
Aluminum K?/1M Membrane
Aluminum KMM membrane is a five-layer laminate composed of a thick, flexible plastic core which is protected on each side with a layer of modified bitumen. The top surface is a heavy, embossed aluminum sheet and the bottom surface is a film of polyethylene.
also employed in flashing systems.
KMM membrane has good elongation prop erties to withstand normal structural move ment when recommended architectural practices are followed. It is suitable for application over most decks and commonly used insulating materials which provide con tinuous support for the KMM membrane.
KMM membrane is simple to install. It results
add to the water resistance of the laminate.
The adhesion of the bitumen to the central core is positive and allows enough flexibility to give a floating membrane effect in service.
The KMM roofing system can allow con tractors to install roofing on new buildings at a much earlier stage than with conventional processes.
-- Embossed Aluminum Sheet
8itumen -- PlssticCore
-- Bitumen
Polyethylene
Predict Information KMM Membrane
Roll Size
Thickness (nominal) Weight (nominal)
Standard KMM Membrane 43' x 33 L.F. 118 so. ft. 107 so. ft. coverage
160 mils
120 lbs./roll (includes packaging Score)
Aluminum KMM Membrane 43" x 33 LF 118SQ ft 107 sq. ft. coverage
120 milt
95 lbs./roll (includes packaging & core)
Both versions of KMM membrane are sup plied in the form of compact, ready-to-aopiy rolls.
Both KMM membranes are designed for use in various roofing and waterproofing applications.
Standard KMM membrane, loosely laid, is normally used in roofing systems which incorporate an aggregate surface or where protection from the atmospheric elements
KMM Adhesive
A rapid setting, asphalt base adhesive that bonds KMM Membrane to most surfaces.
Package Size: 5 gal. containers. Weight: Approx. 55 lbs. (includes container weight).
Color Coatir.es :cr
'AC./V:..'.'II rA-.<u...i--7.ii;rj,-v-*. :1 'a --">'rp5-
Field applied coatings for KMM Aluminum membrane are available m 14 colors. For color selection consult Koppers Master Color Selection Chart 560-L under Koppers Acrylic Emulsion No's. 600 and 610.
21
:<?.]?/] - Rcofing Systems
3=.-3rai Information
The data contained herein is primarily oriented toward roofing systems. However, much of the information is also applicable for waterproofing systems. Contact your Koppers representative for specific data concerning KMM waterproofing and/or further information pertaining to KMM roof ing systems.
KMM Membrane is not intended to offer chemical resistance and must not be used on roofs subjected to corrosive or other wise damaging solutions, vapors, etc-
T :c; S:r*jc:ur3 System
In any building, the performance of the roofing will be affected to some degree by all of the parts of the roof structure system as well as the inside and outside atmospheric environment. Each component should be investigated for its compatibility with each of the others. The roof structure system may include any or all of the following:
Outside air conditions Roofing system Peripheral details (flashings) insulation (if present) Vapor barrier (if present) Structural deck, including sub-
purlins (supports) Structural framing Air space (if present) Ceiling (if present) interior air conditions
You will find information in this manual pertaining to materials and application methods other than for KMM roofing. They are offered to assist the designer in estab lishing their normal position in the roof structure system. They should not be con strued as oart of the KMM roofing system, as endorsement or as oart of the designated specifications, other than to establish a suit able roofing base in the roof structure system.
The proDer design, specification and posi tioning of the various components of the roof structure system are the responsibility of the building owner or his designer. Any subsequent failures due to either the instal lation or lack of installation will not be KoDoers responsibility.
General Deck Requirements
The deck is the base over which the KMM membrane or insulation and KMM mem brane is aoohed. Where the term deck is used without reference to insulation, it shall designate the surface over which roofing is to be aDDlied. All decks shall be clean, smooth, dry. rigid and free of debris. Any deck defect shall be corrected before appli cation of roofing. All decks shall be installed m accordance with the deck manufacturers specifications, and shall be in compliance with Koppers General Requirements.
22
In approving any deck as satisfactory to with Portland Cement Mortar, struck flusn.
receive s KMM system, only the deck sur and permitted to cry.
face la accepted. It is the responsibility of the building designer and the deck manu facturer to provide for expansion and con traction in a manner that wW provide a stable bate for the KMM membrane, for support of maximum antlclpased loads, tar secure attachments vertically and tataralty, and tar the selection of the deck materiel and construction details including their ability to contain bitumens or adhesives usedtar attachments of the KMM membrane or othereomponents of the system. Koppers win not assume responsibility for deck defects, or the effect of deck defects on Koppers roofs.
The placing of conduits, boil heads, etcabove the roof deck and below the roofing membrane la not recommended.
c. Precast Decks (concrete, gypsum, wood flber):Decks of these types, whether grouted or not. shall be caulked with Koppers Flash ing Cement which shall be applied so that the top surface is level and smooth. Strip all joints with a 6* layer of felt stripping set in flashing cement, or standard grade KMM membrane set in KMM Adhesive. This is recommended to assist in leveling uneven joints and to bridge the joint openings, thus providing s better surface for the roofing system materials.
Note: KMM Aluminum membrane should not be applied directly to wood fiber decks. When specified over wood fiber decks, pro visions must be made between the aluminum and the deck before the KMM membrane is applied. This deck preparation can c? a
coated base sheet set in steep asphalt.
All projections or openings in the deck should be completed prior to the application of the roofing. Insulate all hot water and steam pipes which project through or are near the surface to be roofed or water proofed. This is to prevent possible damage to the KMM system.
d. Plywood (exterior grade): Wood shall be well-seasoned, dry and preferably treated. End joints shall have adequate bearing. Loose or void knot holes, large cracks, etc., shall be covered or filled in with appro priate material over which a cushioning stnp of KMM membrane is applied prior to
roof membrane installation. All joints shall
Condition of Roof Surfaces to Receive K.V.M Membrane
be taped with glass fiber roofing tape or -reinforced kraft paper tape 6" wide, set in
KMM Adhesive at the rate of lit gallons per
All surfaces must be dry. host free, reason 100 ft.2.
ably smooth, clean, rigid and free from Plywood shell be a minimum of H" thickness.
debris, loose materials, projections, holes,
release agents or other contaminants which might causa rupture of the membrane and/ or adversely affect the KMM membrane application and performance. Oust shall be removed from the surface immediately before application of the KMM membrane system, especially from those which incor porate the use of KMM Adhesive to adhere the membrane to its substrate.
Lightweight Insulating Decks
Lightweight insulating decks include light
weight aggregate concrete (20 to 40 lbs. per
cu. ft. oven^gy density), foamed concrete,
gypsum andlhermosetting asphaltic decks.
For any adhered membrane, it is necessary
that the lightweight insulating deck system
be capable of venting excess water vaoor
to the undersidfcR_
.s,
a. MataI Decks: Decks of this type must also When the KMlwKwidard^Grade floating
be free from loose rust and oily substances. Deflection should not exceed 1/240 qfjne span. Decks of this type are not suitaflBflor
application of KMM membrane without insu lation being placed between the deck and the KMM membrane.
membrane system is used, spot venting through the roofing membrane or notched perimeter nailers will be adPQuate to prevent vapor pressure build-up tmtar the mem brane. If board-type insulation it to be applied over a lightweight insulating deck,
b. Poured Portland Cement, Concrete, Poured Gypaum, Lightweight Insulating Concrete: Where insulation is specified,
provisions must be made between the fill and the board insulation to prevent fill moisture from affecting the insulation.
nailing strips may be set into and flush with KMM Aluminum membrane should not be
the deck surface, and level with the lower applied directly-to lightweight insulating
surface of the insulation. These strips should roof decks. Where soecified over lightweight
be spaced not more than three feet apart insulating roof decks, provisions must be
and placed parallel with the slope rather made between the Aluminum KMM mem
than perpendicular to the slope of the roof. brane and the deck before the KMM mem
Insulation may then be nailed to the strips brane is applied. This deck preparation can
using fasteners as agreed upon by Koppers be a coated base sheet nailed with approxi
and the architect prior to installation.
mately 100 approved nails per square.
All concrete and masonry surfaces must be cured, dry and free of loose material. All cracks, holes, voids and open areas shall be wetted with water and then carefully filled
In addition, where KMM Aluminum mem brane is specified, lightweight insulating decks shall have sufficient cohesive strength to provide firm attachment of the roofing to
KOPPERS 7 1/KOP Architectural and Construction Materials
the deck and framing to prevent wind uplift damage or blowoffs. Koppera will not be responsible for any failure of the insulating deck system or for disbonding of the roofing from the surface of the deck.
5carc Type Insulations
These insulations come in varying thick nesses and sizes. The insulation manu facturers specifications shall be followed and, in addition, shall be in compliance with Koppers General Recuirements. Generic types of insulation board, such as fiber glass, perlite and fiberboard. are approved. For acceptance of other types, consult your local Koppers sales representative.
The roofing insulation must be kept dry at all times. It must be of a type approved by Koppers. it should only be applied over a deck complying with all of the General Requirements. Work must be scheduled to prevent damage from other trades and eauipment.
Roofing equipment must be of a type which will not damage the insulation used. Broken or damaged insulation sneets can only be used wnen the damaged portion is cut out. These cut-out pieces may be used for appli cation areas where fill-m pieces are required.
No more insulation snail be laid in a day than can be Drotected by KMM membrane m case of sudden weather changes. Edges of insulation snail be brought closely together and shall not be forced into place. Where insulation joins vertical surfaces, the insula tion shall be cut in a neat manner, allowing at least h" clearance.
When more than one layer of insulation is used, joints in each layer shall not coincide. All layers shall be parallel to preceding layers.
'izcr Barrier
Vapor barriers are normally used where the heat flow direction and/or humidity within the building, during any climate or occu pancy cycle, might cause the dew point or condensation to occur under the built-up roofing within the insulation chamber. It is important that the vapor barrier, when installed, provide a continuous seal, (includ ing ventilators, skylights, peripheral walls, and other terminations) from the source of the water vapor.
Other Requirements
.'/latsnals Protection
Although KMM membrane is waterproof in the roll, good practice dictates that it should be protected when stored outside by raised platforms and adequate cover. In cold tem perature periods, inside warm storage is necessary prior to use.
"ccd .'iaiiing Strips
All nonmailable decks require wood nailing strips at eaves, edges, walls, roof openings, etc., for proper securing of metal flanges.
Nailers must be securely and firmly attached to the deck or through to its supporting members. Nailers shall extend not less than 1" beyond the apron or flange.
Nailers should be treated to preserve their condition and hence their nail retentive power for the expected life of the roofing. Creosote or oiibom preservatives may affect the roofing they contact and should not be used. Nailers should be pressure-treated with a waterbom preservative such as Wolman* salts or with penta applied in a liquified petroleum gas carrier such as the Cellon1 process.
Wolman1 and Cation' are regiareied tradenwnia of Koooers Comoany. Inc.
::r*rcqs
'"i-.r.pcrary Protection)
At the end of each day s work, waterstops must be installed to protect the insulation or substrate against water penetration. Waterstops consist of a single ply of KMM membrane (Standard or Aluminum Grade) extending a minimum of 6' beyond the ter minal edge of the insulation. The leading edge of the membrane is then substratefused to the deck and top-sealed, waterstops should be continuous and tight.
These temporary protective measures must be detached cleanly when work is resumed to prevent blocking moisture vapor move ment to vented edge details.
Cdd Storage and "reezer Buiiclncs
KMM roofing systems may be used in cold storage and freezer building applications: with or without a ventilated air space between the deck and the insulated refrig erated area. For specific recommendations regarding design details for these appli cations. consult your local Koppers repre sentative.
A.lachrrent of Beck and insulation Components
Recommended methods of attachment of insulation to its substrate include hot bitu men. cofd-applied adhesives. Suitability of the kind of attachment is deoendent upon the type of insulation and its substrate. This should be investigated by the specifier along with the various requirements, including wind uplift resistance, as described in the local building code and/or policies of the insurance agencies involved.
Where it is not possible to attach insulation with hot or cold adhesive. Koppers will accept the use of mechanical fasteners providing insulation manufacturer recom mendations are followed, and the fastener is one of the following:
Oekfast Grefco Perma-fastner GAF Gaftite
The following types of insulation require 5
fasteners per 2' x 4' board, and 6 fasteners per 3` x 4` board: isocyanurate. phenolic, urethane, and urethane composite.
Where the formation of ice can occur on KMM Aluminum, cover mechanical fasteners with 6" square pads of base sheet bonded with KMM adhesive in areas of ice formation.
Koppers will not be responsible for any damage caused by or as the result of un satisfactory attachment.
KMM roofs, especially those employing the floating membrane concept, are able to withstand building movement to a greater degree than conventional materials, but good design practices dictate that expan sion joints should be employed for protec tion of the overall roofing system. The use. location and design of building expansion joints should be taken into consideration at the time of the original building design.
Although provisions tor adequate expansion joints are the responsibility of the building designer, Koppers offers the following recommendations for the protection of the roofing system due to stresses caused by expansion and contraction of the building. Building expansion joints should be installed:
I.On large roof areas at least 200 feet in each direction.
2. At all places where the structural supports and roof assembly change direction.
3. Where type of adjoining deck materials changes.
Where control, expansion or contraction joints are provided m structural steel, deck material or deck system, provisions must be made for their continuation through the roofing system. Koppers realizes that in a climate-controlled building there may be little or no expansion attar the building is in use. However, building expansion joints are still recommended based upon the following points:
1. During construction, the building will not be under a steady-state temperature/ humidity condition so that thermal and moisture movement can be sufficient to disturb and possibly injure the roofing system.
2. If no building expansion joint is provided, the owner must keep the building at the steady-state temperature and humidity con dition at all times, as holiday shutdowns may injure the roofing system due to the move ment of the building system resulting from temperature/humidity variation.
3. If the occupancy is fairly large, the sudden entrance on a rainy day of many rain-soaked employees may cause rapid moisture move ment in the roof structure system which may damage the roofing system.
23
KMM Roofing Systems (Continued)
I-233 oi'ssc -rcerlayrsrt When a nailed base sheet is to be used as an undedayment for KMM membrane, edge laos are to be 4" and end laps are to be 6". The base sheet shall be fastened with approved nails and the pattern shall be on 9" centers. 2" from the edge lap and down the center of each sheet. (Note: this is approximately 100 nails per square.)
Where heavy traffic is anticipated over KMM Aluminum Membrane, a suitable traffic sur face should be provided. Koppers Traffic Pad is recommended and is attached with KMM Adhesive.
Koppers recommends that the maximum roof slope for loose stone topping systems be one inch per foot and that the maximum slope for the emulsion-aggregate system be one and one-half inches per foot. There is no maximum slope on the KMM Aluminum roofing system.
All KMM membrane must be carefully in spected for construction damage and imperfect heat fusion prior to the installation of the protective topping. Any holes or tears must be patched with the appropriate KMM membrane. The patch must extend at least 4" in all directions from the edges of the tear or puncture. Seal into position with inter-ply fusion and top sealing for Standard KMM membrane. Seal Aluminum KMM membrane by inter-ply fusion. Streaks or seams of bitumen on Aluminum KMM membrane may be touched up by high quality varnish-base aluminum paint.
rs La Cora; ;3s
Underwriters Laboratories, 'fnc. Building Materials Directory, Built-up Roof Covering Materials, lists KMM Membrane for use in construction of class A. B. or C built-up roof coverings. Specifier should consult this directory for complete details.
A five-year renewable guarantee on roofing is available. See Page 8 for further information.
24
r--,i- r>'i-v ~i ---Ui~j j-i* s** * rw-wr i".pj .. -* *"
vC
--,,
Heat fusion is a general term used to describe specific methods of adhesion of one layer of KMM membrane to another surface. In the process of heat fusion, the bitumen of the membrane is heated with a direct flame until it is plastic enough to flow under pressure. When pressure is immedi ately exerted to this softened bitumen, it fuses to the surface to which it is applied. Specific types of heat fusion are described below. It should be noted that the external plastic film present will break and draw apart with the proper application of the flame.
Substrate fusion is the specific type of heat fusion used to secure the KMM membrane film to a substrate. The underside of the KMM membrane is heated until plastic. The heated underside is then quickly pushed or forced against the substrate surface so that a slight "run-out" of bitumen from beneath the'edge of the membrane is observed. A 4"-wide fused waterproof seal is to be obtained.
Interply fusion is the specific type of heat fusion used to obtain a waterproof seal between two overlapping sections of KMM membrane. In practice, the flame is applied simultaneously to both surfaces of Standard KMM membrane until each becomes plastic. For Aluminum KMM membrane end joints, heat the bottom of the overlapping section until it becomes plastic while simultaneously heating the aluminum surface of the irv piace KMM membrane. The two surfaces are pressed together to form a fused joint or seam of at least 4" in width. A slight "run-out" of bitumen from the interply joint is to be obtained.
Top sealing is the specific type of heat fusion used to make the second waterproof seal at substrate-fused and mterply-fused lomts. It is applicable only to Standard KMM membrane. Top sealing is accomplished by heating a 2" to 3" section at the edge of the top sheet until plastic. To develop a smooth, continuous filled joint, move the softened bitumen from the top sheet over and back into me previously fused joint area with a roundnosed trowel.
Heat fusion equipment: Very satisfactory fusions can be obtained using a high heat output propane torch such as Linde Air Division. Union Carbide Corp. "Swirl Jet Tips 46-633922". As an additional safety precaution, it is recommended that the torch handle be equipped with an automatic shut off valve. A roundnosed bncklayer's trowel, such as Marshalltown Trowel Co. No. 48 gauging trowel, is recommended for sub strate fusion, interply fusion and top sealing.
Consult your local Koppers representative for further information.
Aluminum Joint Connection The overlapping joint is maintained on Aluminum KMM membrane by the heat-
fusion attachment of the upper sheet to the exposed 4" bitumen band on the lower sheet. Dunng interply fusion of this joint, a bitumen bead shall be forced from between the mated edges which is then covered by the aluminum extension tab on the upper aluminum sheet. A slight heating of the edge of the upper aluminum surface while pressing with a trowel will also be beneficial in obtaining a uniform waterproof bond.
Bituminous Aggregate Topping (BAT) BAT consists of a combination of graded gravel and asphalt emulsion. See Page 26 for complete description.
Recommended quantity is 650 to 700 lbs. per sauare (approximately K" to 1* thick ness).
Loose Aggregate Topping Loose aggregate topping consists of a smooth stone aggregate applied loose over the KMM membrane at a minimum rate of 1,000 lbs. per square (approximately 1H" thickness of loose stone).
Note 1: if smooth gravel is not available. Stonemat must be installed prior to aggre gate surfacing. Aggregate application by gravel buggy is recommended.
Note 2: Slag is not a permissible aggregate.
Conditions of Surface to Receive KMM Membrane
a. Gravel Surfaced Roofs: Remove loose gravel and remove any existing blisters, buckles, etc. Apoly a minimum insulation in an approved manner prior to application of KMM membrane.
b. Smooth Surfaced Roofs: Remove or repair, as necessary, any blisters or other abnormality of the existing membrane to give a surface which is free of sharp edges prior to the application of KMM membrane. Cushion cuts or open areas with a layer of Standard KMM membrane set in KMM Adhesive and substrate-fuse the edges.
Prior to applying KMM Adhesive for KMM Aluminum Membrane application, prime roof surface with Koppers 452 Primer at the rate of approx. H gallon per 100 ft.2.
e. Moisture In the Existing Roof: Aluminum KMM membrane (Specification No. 630) is always adhered to the substrate. It is not recommended for application directly over surfaces which contain moisture without taking precautions to allow venting of the entrapped water vapor.
Standard KMM membrane (Specification Nos. 610 and 620) is loosely laid and ballasted by an aggregate topping. This system will tolerate moisture in the sub strate and. depending upon the existing situation, extra precautions may be required such as spot or perimeter venting.
Note: For recommendations regarding specific precautions to be taken, see your local Koppers sales representative.
KOPPERS 7,1/KOP Architectural and Construction Materials
25
Lccsa Accrue2':a7czzir.z sr.d
z
] j" 3 (3 *: 3 " 3,: 3
^33 3
- ~co ~ ~ = nST 3 7
A. Aggregate: Either smooth gravel, crushed aggregate or stone, graded to K" nominal size (S.P. No. 57--U.S. Deoartment of Commerce Simpli fied Practice Recommendation R-163). See "Aggregate Size Table " below
B. Application: I.Over the KMM membrane, apply loose smooth aggregate at the rate of 1000 lbs. min. per so. (approx. IK" thickness of loose stone). Note: If smooth gravel is not available. Stonemat must be installed prior to aggre gate surfacing. Aggregate application by gravel buggy is recommended.
Apply crushed gravel loosely onto the Stonemat at the rate of 1000 Ibs./sq. min imum (Approx. 1X" thickness).
2. Aggregate application by gravel buggy is recommended. Slag is not a permissible aggregate.
^^ wav!` 'VC.lV. i
'
vmv
BAT topping consists of graded gravel and KMM Aggregate Binder Emulsion.
The BAT is applied to the roof as topping at the rate of 650 to 700 lbs. per square (approximately K" to 1" tnickness).
A. Materials KMM Aggregate Binder, a cold applied asphalt emulsion, was formulated for binding the specified aggregate applied over Standard KMM roof systems to protect the KMM membrane. KMM Aggregate 8inder emulsion is not intended for use as an adhesive or repair material. Binder should be kept in warm storage during cold weather to keep from freezing.
Aggregate: The gravel aggregate is to be clean and size graded to nominal H" round gravel. (This is equivalent to S.P. No. 8-- U.S. Department of Commerce Simplified Practice Recommendation R-163).
B. General Application Instructions Preparation: 1. BAT is applied when the KMM roofing and flashing applications are complete.
2. Roof surface must be free of ponded water.
2. KMM Aggregate Binder emulsion should be stirred thoroughly until the material is of uniform consistency. KMM Aggregate 8inder emulsion is sprayed on the aggre gate at the rate of 3 gallons per 100 sq. ft. using suitable spray equipment. Do not apply KMM Aggregate Binder emulsion when ram or freezing temperatures are expected within 24 hours following the completed application.
3. An additional layer of aggregate is then applied over the binder at the rate of 200225 lbs. per 100 so. ft. to achieve" a finished surface. Aggregate application by gravel buggy is recommended. Heavy accumula tions of aggregate should be evenly distrib uted. Wooden or steel implements should not be used. Aggregate should be aoolied as soon as possible and no later than 24 hours after applying KMM Aggregate Binder Emulsion.
Application of BAT Topping: BAT is applied in three steps resulting in a protective topping weighing 650-700 pounds per square. The steps are as follows:
1. Gravel aggregate is applied at the rate of 450-475 lbs. per 100 sq. ft. on the finished KMM roof surface. Aggregate application by gravel buggy is recommended.
^- -- a - a
Grading Requirements for Coarse Aggregates from ASTM Standard C 33--Standard Specification for Concrete Aggregate Use Size #8 in making Bituminous Aggregate Topping (BAT). Use Size 457 for Loose Aggregate Topping.
Sira Number
57
8
Nominal Size (Sievoe with Square Openings)
1 m to Not4 (25.0 to 4 75 mm)
H in to No 8 !9 5 to 2.36 mm)
1HH. (37.5 mm)
100
_
Amounts Floor man Each Laboratory Slava (Squara Opanlngs), Weight Parcant
1 In. (25.0 mm)
Kin. (19.0 mm)
K m. (12.5 mm)
Km.
(9.5 mm)
No. 4 (4.75 mm)
No. 8 (2.36 mm)
95 to 100 _ 25 to 60
_
Oto 10
Oto 5
_
100
85 to 100
10 to 30
OtO 10
No. 16 (1.18 mm)
_
Oto 5
26
m
a
.
v'rw`,1t:i'vpw5s*<" wpni *
KOPPERS 7 1.KOP Architectural and Construction Matenals
A. All KMM membrane applications should De performed by a contractor who has been trained by Koopers. Where a Koooers roof ing guarantee is required, KMM membrane must be aooiied by a contractor specifically authorized by Koppers.
B. Prior to beginning installation of the KMM roofing system, substrates for roofing as well as waterproofing shall be inspected by the roofing contractor for dryness, smooth ness. rigidity and freedom from debris. All protections and holes which might cause rupture of the memorane are to be repaired. Review "Conditions of Surface to Receive KMM Membrane'. page 22.
C. All metal surfaces must receive a coating of KMM Adhesive before covering with KMM membrane.
D. Determine the direction of water drainage and the low point of the deck. The direction of both end laps and side laps shall be such that the direction of the water flow is over the laps. The direction of the overlap shall be changed as the direction of the water flow changes.
E. Each succeeding sheet of KMM mem brane shall be interply-fuseo to previously positioned sheets in successive order.
F. End laps of KMM membrane shall be staggered.
G. Cushioning or stripping layers of Standard Grade KMM memorane shall be applied in areas of potentially high stress, sharp edges, terminal closures and/or changes in direc tion of KMM membrane. These areas include interior and exterior corners, bottoms of valleys ano/or maior changes m directions of slope, drams, joints, openings, metal flanges, protections, etc. Cushioning layers shall be applied prior to me main KMM membrane system installation and shall be embedded in KMM Adhesive, substratefused. and then top-sealed to form a smooth transition surface.
H. All inside comers shall be cushioned with double or triple layers of Standard KMM membrane to provide a firm cant and support for corner application of the main KMM memorane system.
I. In KMM roofing systems, fiber, wood or smooth mortar cants are permissible alternates to multiple-cushioning layers of KMM memorane. However, when non-KMM cants are used, a layer of KMM membrane applied over the cant is necessary before the application of the final flashing system In waterproofing systems.only KMM cushion layers are acceptable as cants.
J. The mam KMM membrane shall extend a minimum of 2" above the cant Interply-fuse all side laps Substrate-fuse and top-seal the terminal end of the KMM membrane to the wail
K. All joints and openings in the Substrate resulting from pipes, conduits, hatches.
ductwork, steelwork, etc., penetrating the membrane layer are to be covered with Standard KMM membrane, sealed at the areas of intersection and protected with Aluminum KMM membrane.
LDeck areas around dram openings that are protected by multiple layers of mem brane and lead flashings must be tapered from the outermost perimeter of the final protective membrane to provide slope to the drain. All waterdams that hinder the free flow of water to the dram because of multiple thicknesses of KMM membrane shall be corrected.
M. Any KMM membrane which will not otherwise be covered by a topping shall be protected with a layer of Aluminum KMM membrane extending a minimum of 4" beyond the edges of the unprotected mem brane and substrate-fused around its perim eter. Specific details of the installation must be agreed upon between the architect and Koopers prior to installation.
N. Aluminum and steel hatches should be insulated prior to installation.
O. At the end of each day's work, temporary waterstops must be installed to protect the insulation or substrate from water pene tration.
Aluminum KMM Joint Connection
The overlapping joint is maintained on Aluminum KMM membrane by the heat fusion attachment of the upper sheet to the exposed 4" bitumen band on the lower sheet. During inter-ply fusion of this ioint. a bitumen bead shall be forced from between the mated edges which is then covered by the aluminum extension tab on the upper aluminum sheet.
The use of a roller is recommended to properly press laps firmly together.
Application Tamperaturs:
KMM membrane should be carefully un rolled at material temperatures below 40F. At these temoeratures. warm storage prior to use will improve handling and flexibility. Do not apply when material temperature is below 32F or on frosty surfaces. Store KMM Adhesive at temperatures above 40F.
Application of KMM Adhesive
KMM Adhesive can be applied by brush, roller or squeegee
Do not thin KMM Adhesive prior to use. Mix thoroughly before applying.
KMM Adhesive m finishing systems is applied at a rate of 1 to 1,4 gal. per square as a thin, full coating, in waterproofing systems the application rate is 2 to 3 gal. per square The adhesive must be applied
one-hatf to the substrate ana the other naif to the underside of tne KMM memorane When KMM Adhesive is used for attaching KMM Aluminum Membrane to insulation, decking or roof surfaces, the adhesive may be applied entirely to the surface.
When the membrane is to be totally aaherea to a board-type insulation, additional adhe sive may' be required depending upon its porosity.
The KMM membrane must be set into place while the adhesive is still tacky. To insure good adhesion of the KMM membrane to the substrate and to force out any entrapped air. apply pressure to the membrane surface by hand rubbing, stiff broom and/or roller
27
Loose Aggregate Topping System Specification No. 610 Bituminous Aggregate Topping (BAT) System Specification No. 620
::2"3;S per 100 sq. ft. of roof
KMM Membrane (Standard)
i ply
Surfacings
Loose Aggregate
1.000 lbs. mm.
BAT System
650 lbs. mm.
3!^ c5 *3"jirB.T'.sr.S(
1" per foot maximum (loose aggregate topping). 1H" per foot maximum (BAT topping).
General Requirements on Pages 21 through 27 and Detail Specifications on Pages 30 througn 31 are a part of this specification and must be adhered to where applicable.
1. Prior to starting the application of the roofing membrane, cushioning or stripping layers of Standard Grade KMM membrane shall be applied m areas of potentially high stress, sharp edges, terminal closures and/ or changes in direction of KMM membrane. These areas include interior and exterior corners, bottoms of valleys and/or major changes in directions of slope, drains, joints, openings, metal flanges, projections, etc. Cushioning layers shall be embedded in KMM Adhesive, substrate-fused, and then top-sealed to form a smooth transition surface.
2. Determine the direction of water drainage and the low point of the deck. The direction of side laps shall be such that the direction of the water flow is over the laps. The direc tion of the overlap shall be changed as the direction of the water flow changes.
3. Beginning at the low point of the roof slope, install one ply of Standard Grade KMM membrane. The membrane shall be laid in a fashion which allows water to pass over the lap instead of agatnat the lap.
4. All side and end tape shall be 4" and interpiy-fused and too-sealed.
5. Each sheet of KMM membrane shall be set in place and shall be stretched slightly to remove any wrinkles. To retain the mem brane in the smoothed position, the ends may be tacked to the substrate by partial substrate fusion.
6. Substrate-fuse the KMM membrane to the substrate around the entire perimeter of the roof, at parapets, skylights, walls, etc.. with all joints interpiy-fused and top-sealed.
7. Extend the KMM roofing membrane a minimum of 2" above all cants. Substratefuse and top-seal along the upper terminal edge.
8. The contractor shall thoroughly inspect completed KMM membrane at the end of each day s work as well as just before appli cation of topping.
9. Install KMM Aluminum flashings in accordance with flashing specification described on Page 30.
10. When the flashings have been com pleted. install a loose aggregate or bitumi nous aggregate topping over the entire membrane. Refer to Page 26 for topping information.
Sc9c;-f!ca:icn Me. SGO
KOPPERS 7 1,'KOP Architectural and Construction Materials
. b " I.S per 100 sq. ft. of roof
KMM Adhesive KMM Membrane (Aluminum)
i-iHgal.* 1 oiy
2': :3 riscuirs.T.encs
No Limitations.
`Depending upon the porosity of the roof deck or insulation, additional KMM Adhesive may be required.
Procedure
General Requirements on Pages 21 through 27 and Detail Specifications on Pages 30 and 31 are a part of this specification and must be adhered to where applicable.
1. Prior to starting the application of the roofing membrane, cushioning or shipping layers of Standard Grade KMM membrane shall be aoolied in areas of potentially high stress, sharp edges, terminal closures and/ or changes in direction of KMM membrane. These areas include interior and exterior comers, bottoms of valleys or major changes in directions of slope, drains, joints, open ings. metal flanges, projections, etc. Cush ioning layers shall be applied prior to the main KMM membrane system installation and shall be embedded in KMM Adhesive, substrate-fused, and then top-sealed to form a smooth transition surface.
Oetermme the direction of water drainage and the low point of the deck. The direction of side laps shall be such that the direction of the water flow is over the laps. The direc tion of the overlap shall be changed as the direction of the water flow changes.
The selvage edge of the Aluminum KMM membrane shall be positioned on the high side so that the direction of the flow of water is over the laps.
2. Starting at the low point of the deck, set the first sheet of Aluminum Grade KMM membrane into a full bed of KMM Adhesive (application rate of 1 to 1H gat. per square) before the adhesive becomes dry to the touch. Rub or stiff broom thoroughly to obtain proper adhesion and to remove all entrapped air from under the membrane. End and side laps shall be 4". 3. Subsequent courses are to be laid with 4" end and side laps, from the first course progressing to the high point. Proceed until the entire membrane is completely adhered to the deck, and all joints interply-fused.
4. The main KMM membrane shall extend a minimum of 2" above the cant. Interply-fuse alt side laps. Substrate-fuse and top-seal the terminal end of the KMM membrane to the wall. 5. The contractor shall thoroughly inspect the completed KMM membrane at the end of each days work and when the job is finished.
6. install KMM Aluminum Flashings in accordance with flashing specifications described on Page 30.
7. After completion of the Aluminum KMM roof and flashing system, a high quality varnish-base aluminum paint may be applied to any exposed streaks or seams of bitumen.
29
XMM Flashing Specifications
(Generai information)
Vertical Flashing
, Horizontal Flashing
Flashings are the terminal closures of a roofing system which perform a water proofing, and in some systems, a decorative function. Flashings must be installed at all intersections formed by vertical surfaces. Their importance cannot be stressed too strongly Water entering the roofing system througn flashings can result in water vapor forces which can destroy the effectiveness of the roofing and insulation.
Raggl* to m SaattC
Aluminum KMM Mamcran*
KMM Adhesive Standard KMM Membrane
Koooers flashings are an integral part of a Koppers roof. Designed for flexibility. Aluminum KMM flashings will provide many years of service.
Flashing should be installed as roofing progresses to prevent possible water damage to insulation or deck under the roofing.
Note:
1. If bonded/guaranteed flashing is required, it must be installed in conjunction with a
Specification No. 710
Koppers bonded/guaranteed roof and can Flashing system application:
00 bonoed/guaranteed for standard penods
uo to but not greater than the period for (Vertical)
Flashing system apDlication: (Horizontal)
which the roofing is bonded/guaranteed. To be bonded/guaranteed, flashings must be set at least 8" above the roofing base.
1. When flashing is to be installed over a 1. All surfaces to be covered by the KMM porous cementatious surface, apply a prime Flashing must be coated with KMM Adhesive coat of Hi-Pen Primer at a rate of H to K gal. ' at a rate of 1 to thi gal. per 100 sq. ft. This
2. Metal Cap flashings are not bondable and per 100 sq. ft. Allow to dry four hours : includes all metal surfaces,
are not included under any flashing bond/ minimum.
i 2. When the adhesive becomes tacky, stnc
guarantee.
2. Each course of KMM Aluminum mem ; metal flanges using 4" minimum widths of
3. Metal work of any description used as brane shall be unrolled and cut to maximum . standard KMM membrane as a cushioning
flashing or a part of a flashing system is not length of 11' prior to setting in place.
I strip centered along the length of the entire
bondaoie and is not included under any flashing bond/guarantee.
4. Vertical flashing that terminates without use of metal counterflashing, must be stripped with 6" wide KMM Aluminum Mem brane totally fused to the wall and the KMM
3. Apply a coat of KMM Adhesive at a total | edge of the flange. The cushioning must
rate of 1 to t hi gal. per 100 sq. ft. to all areas , cover the edge of the metal where it meets
of the completed roof membrane to be , the main membrane a minimum of 2" and
covered with KMM flashing, and on under ! must cover ail nail heads. The balance of the
side of flashing that will contact roof width of the cushioning strip must extend a
membrane.
i minimum of 2" onto the roofing membrane.
Aluminum Membrane.
5. When parapet wall flashing exceeds 28" from roof surface, the length of flashing
4. While the adhesive is still tacky, set a layer of KMM Aluminum membrane into place extending from 4" onto the roofing
! 3. The perimeters of the KMM cushioning : strip are then substrate-fused and top; sealed.
must not exceed 43" KMM Aluminum membrane to above the top of the cant strip | 4. KMM Aluminum membrane is then
Membrane on such flashing must be set in KMM adhesive at the total rate of 1-1hi gal. per 100 square feet, applying hi on the wail and on the underside of the membrane. The memorane must be substrate-fused 4* around perimeter of each layer, except at selvage where fusion should be 4" inward of selvage, avoiding fusion under selvage.
Flashing specification No. 710 must be in place prior to proceeding with above-
a minimum of 4". Adjacent pieces shall be ; installed in KMM Adhesive applied at a rate
side lapped a minimum of 4".
; of 1 to thi gal. per 100 sq. ft. extending a
; minimum of 4" beyond the inside edge of 5. Rub. brush or roll thoroughly to obtain ' the KMM cushioning strip and to the outer properadhesion and to remove all entrapped edge of the metal flange. air from under the flashing membrane.
' 5. It is then fused around the perimeter.
.8.Substrate-fuse flashing that extends
above termination of roof membrane, 8 Once this operation has been completed,
interply-fuse all laps and that which extends the flashing system can be surfaced with
onto roof surface.
aggregate as may be required.
described application.
7. The contractor shall thoroughly inspect
rrscaraiicn
the completed flashing system at the end of each day s work.
1. All surfaces to receive the KMM Flashing Systems must be free of dirt, gravel or other loose material.
8. A high quality varnish-base aluminum paint may be applied to any exposed streaks or seams of bitumen.
2. All surfaces must be reasonably smooth 9. Install metal counterflashing as required.
and dry.
10. Complete the top surfacing of the roof
ing membrane to the base of the cant stnp
as may be specified.
30
J
Aluminum KMM Membrane Standard
Standard KMM Membrane Substrate-fused
Root Made
Matal braes 30" O.C. \
Gutfer-
N^naulattonJ Traatad wood nailer
1 ^ * ew
Aluminum KMM Mmbran
KOPPERS 7 1/KOP Arehitactural and Construction Materials
.aesrea ant
Aluminum KMM Mtm&ran#
2sr~c with
! i: Sr> vcj
Parapet
NOTE: When height of Hashing exceeds 28" refer to page 30.
'Overlap " and substrate-fuse when flashing height exceeds 12"
Specification No 7io must be in place prior to application of higher Hashing.
NOTE: When height oflSShing exceeds 28' refer to page 30
'Overlap 4* and substrate-fuse whan flashing height exceeds 12*. Specification No. 710 must be in place pnor to application of higher flashing.
31
, , v v 7 J O i/Mvw^iWJW W I
. M N-, *... , -- -*^*v* "^ -- <
VM
-- W I ^ ^ < J ' -- W ' *w C? * O
.J VJ
FOR ENGINEERING ASSISTANCE . . .
Since the majority of projects present such a wide variety of conditions, the specifier must take precautions in the preparation of
waterproofing specifications and related details to maximize the possibilities of a permanently watertight job.
Koppers has had many years experience in
the waterproofing field and offers the specifier engineering assistance in achiev ing the best possible waterproofing job.
The function of waterproofing and damo proofing is to prevent the entry or passage of water through masonry or concrete structures. The most important property that must be possessed by any waterproofing or dampproofing matenai is its ability to resist prolonged contact with water.
Because of coal tar's natural resistance to moisture, bacteria and acid, it has proven to be the most effective hot applied water proofing system available today.
Z. ZZ 'Z~ " 3','3!STS
Koppers KMM Membrane is a cold applied, prefabricated waterproofing sheet designed for exceptional waterproofing protection. When a cold applied sheet membrane is desired, ease of application, dependability, and economy make KMM the system you can rely on for your most critical water proofing requirements.
ct:.-c
Many projects require the advantages of cold applied liquid or mastic moistureproof ing materials. Koppers manufactures a wide variety of quality dampproofing compounds. Applied by themselves or in combination with reinforcing fabrics, Koppers dampprooftna nrrvii !/* ------
KOPPERS 7 1/KOP Architectural and Construction Msttrists
T:sl :zr 21222 2sr.d .vs:: /r.B.-prosrirg sysiBrrs
Membrane Waterproofing
Materials a. Coal Tar Waterproofing Bitumen A.S.T.M.
0-450 Type III.
b. Membrane (Select one or combination). GLASFAB--A.S.T.M. D-1668.
Tar Saturated Cotton Fabric--A.S.T.M. D-173 Tarred felt --A.S.T.M. D-227.
c. Concrete Priming Oil--A.S.T.M. D-43-41.
General Requirement* a. Preparation of surfaces: Surfaces to be waterproofed snail be reasonably smooth and free from holes or projections which might cause puncture of the membrane. The surface shall be dry and thoroughly cleaned to remove dust and loose materials imme diately before application of the waterproof ing. Do not apply waterproofing where effects of freezing or moisture will adversely affect the waterproofing application.
b. Applicator All membrane waterproofing shall be applied by an experienced roofing and waterproofing contractor.
Application Precautions a. Waterproofing bitumen shall not be heated above 425F.
b. Roll or press firmly all plies of membrane into the hot bitumen and apply without wrinkles, buckles or kinks.
c. On vertical walls apply hot bitumen with cotton roller mops or by other suitable application techniques.
d. Apply membranes on vertical surfaces in courses not exceeding ten'feet in length where immediate ana careful backfilling is not possible. After each course of the water proofing system is completed and before the top mopping is applied; nail each course at the upper edge before the next course is applied. Nail each succeeding course end lapping not less than 10 inches.
a. Reinforce wall angles, comers or any place the waterproofing membrane course may be subject to unusual stresses with not less than 2 additional plies of fabric or GLASFAB reinforcement and moppmgs of bitumen.
f. Insulate and protect all hot water and steam pipes which project through or are near the surfaces to be waterproofed. Take the necessary precautions to prevent water from getting between the waterproofing and the waterproofed surface at all points where the membrane is penetrated by drains, pipes, etc. Apply extra plies of reinforcing membrane and bitumen moppings in these areas.
g. Carefully examine laps which have been cautions above the following additional
exposed for any length of time, such as at precautions shall be taken: (t) If deck is
the junction of a vertical wail and a slab, for sloped to interior drams, specify water
defects and insufficient lap areas and repair proofing Bitumen conforming to ASTM
as necessary before proceeding with further Specification D-4S0 Type III. (2) Before the
application.
pouring or placing of pedestals supporting
h. Apply all membrane waterproofing systems in a workmanlike manner and use wood nailers treated with a water-borne preservative for ail vertical wall water proofing.
I. Protect the membrane from damage by other trades after installation to maintain the integrity of the waterproofing throughout the structure.
j. Ventilation should be provided in enclosed spaces during application.
precast finish slabs, additional reinforcement shall be installed under each pedestal over existing membrane. (3) Extreme care should be taken to protect the finished waterproof ing from damage by other trades during construction of towers, etc. Place a pro tective course over the finished membrane until the wearing surface is placed. (4) On precast concrete systems all joints should be grouted with flashing cement and stripped with a reinforcement fabric.
Horizontal waterproofing
operations:
(t) Beginning at the low point of the slab mop the surface with hot Koooers Water proofing Bitumen and immediately apply the reinforcing membrane over the entire area. (2) Be sure that each ply is solidly mopped and bonded. (3) For the.various waterproof ing systems lap the reinforcing plies as follows: (a) Two Ply System--lap 19 inches. (b) Three Ply System--lap 24*5 inches. (c) Four Ply System--lap 27H inches. (d) Five Ply System--lap 29 inches. (4) Mop the entire top surface with Koppers water proofing Bitumen. The completed water proofing forms a firmly bonded system and the reinforcement shall not be exposed at any place. (S) As soon as any portion of the waterproofing has been completed, cover it with the protection course specified, such as brick, tile, concrete, rigid insulation or other specified material.
3slow grscs wail '^snrcoiing application:
(1) Apply a uniform brush coat of Koppers Concrete Priming Oil over the entire sur face to be waterproofed (approximately 1 gallon for each 100 square feet). (2) Mop wall completely with Koppers waterproofing Bitumen. (3) Starting at the most practical place, install the desired number of plies lapping them as follows: (a) Four Ply--lao 27H inches, (b) Three Ply--lap 24H inches, (c) Two Ply--lap 19 inches, (d) When more than 4 plies are used in a membrane, it is recommended that they be installed in at least two operations, i.e.. 2 plies over three. 3 plies over three, etc. maintaining the shingle fashion method in each operation. (4) Nail membrane with concrete nails 8 inches on centers through flat tin discs at the end lao horizontally across the mem brane. If wood nailers are installed, nail membrane to nailer with 1H inch roofing nails through flat tin discs 8 inches on
r',223 deck .vz:srzrccfing apc iictic rs:
centers. (5) Mop the entire surface with Koppers Waterproofing Bitumen. The com pleted waterproofing forms a firmly bonded
When membrane waterproofing is used in system and the reinforcement shall not be
plaza construction with interior drains and exposed at any place (6) As soon as any
the finish slab does not rest immediately on portion of the waterproofing has been com
the waterproofing, but on concrete pleted. cover it with a protection course and
pedestals, in addition to the application pre backfill.
Fooling Foundation
33
X,\IM Membrane V/a-tsrpr fina o' -S': errs
Msisrleis and .$ys:am discussion
KMM waterproofing specification* are categorized as vertical and horizontal to differentiate between slight differences in application procedures dictated by the orientation of the surface to be waterproofed. The vertical specification is written for foundation wall waterproofing, but may be modified for other vertical or steep surfaces to be waterproofed. The horizontal specifi cation is written for split-stab or plaza deck applications but can also be modified for other low slope or flat surfaces. Consult your local Koppers sales representative for assistance with these modifications.
~'N
Description
Koppers Vertical Waterproofing Specifica tion No. 840 consists of Standard Grade KMM membrane applied to a vertical surface
4. Substrate-fuse the KMM membrane to the substrate around the entire perimeter, and at all projections, walls, etc., with all joints interpiy-fused and top-sealed.
)-
in a full bed of KMM Adhesive. The KMM membrane forms a waterproof system through the use of joint heat fusion, a unique process whereby all contiguous joints are affixed together to develop a monolithic waterproof membrane. In addition, the entire system is completely adhered to the vertical surface to eliminate any voids which might permit collection of water between the surface and membrane.
5. Each sheet is to be set vertically, in a full bed of adhesive, from the first course to the high point of the area to be waterproofed. Each course shall end lap the lower course 4" and side laps shall be 4". The top ends of each sheet of KMM membrane shall be substrate-fused and top-sealed. Proceed with application of KMM membrane until the entire surface is completely adhered to the wall, interpiy-fused and top-sealed.
This system is applicable for use with any vertical structural surface which provides continuous support for the KMM membrane.
The general requirements and application procedures found on Pages 21 through 27 are part of this specification and must be adhered to where applicable.
Procedures
6. The contractor shall thoroughly inspect the completed KMM membrane at the end of each day's work as well as before the backfilling phase.
7. To eliminate potential abrasions, breaks and punctures, it is strongly recommended that the completed KMM waterproofing system be completely covered immediately,
1. Apply cushioning or stripping layers of Standard Grade KMM membrane prior to the installation of the KMM waterproofing membrane.
2. The adhesive application rate for all waterproofing is to be 2 to 3 gal. per square.
3. Starting at the low point, set the first sheet of Standard Grade KMM membrane into a full bed of KMM Adhesive while the adhesive is still tacky. Rub and/or brush thoroughly
with a minimum thickness protective board. It should then be permanently back filled. tamping the backfill as required. Pro tective board can be installed in KMM Adhesive or other suitable asphalt base adhesives.
.8 Any KMM waterproofing membrane left
exposed after backfilling shall be protected with Aluminum Grade KMM membrane or other suitable sunlight-protective materials.
to remove all entrapped air from under the 9. When any portion of the membrane is to
membrane. End and side laps shall be 4". be permanently exposed, it must be covered
All end and side laps shall be interpiy-fused with Aluminum KMM Flashing, Specification
34
and top-sealed.
#710 for protection.
KOPPERS 7 1/KOP
Architectural and Construction Materials
r'
Description
4*. All end and side laps shall be interply-
Kopoers Horizontal Waterproofing Specifi fused and top-sealed.
cation No. 650 consists of Standard Grade 4. Substrate-fuse the KMM membrane to the
KMM membrane applied to a plaza deck or substrate around the entire perimeter, and
c horizontal surface in a full bed of KMM at all projections, walls, etc., with all joints Adhesive. The KMM membrane forms a interpiy-fused and top-sealed.
waterproof system through the use of joint 5. Subsequent sheets are to be laid shingle heat fusion, a unique process whereby all fashion, with 4" end and side laps, from the contiguous joints are affixed together to first course progressing to the high point. develop a monolithic waterproof membrane. Proceed until the entire membrane is com
This system is applicable over any structural pletely adhered to the deck, interpiy-fused
deck ana/or approved rigid board insulation and top-sealed.
where the substrate provides continuous support for the KMM membrane. It is ideally suited for application directly to poured structural concrete decks.
6. Extend the KMM waterproofing mem brane. as flashing, up vertical surfaces to a height above the water level expected at the wearing slab The top of the KMM membrane
Slope
shall be substrate-fused and top-sealed to the wall. All side laps shall be mterply-fused
Applicable for deck scoes of 0" to 4" per and top-sealed. When vertical waterproofing
foot. When slope exceeds 4" per foot see is required to join the upturn, continue the
Specification No. 640 on Page 34.
upturn a minimum of 6" above the height of
General requirements
the wearing surface and substrate-fuse to the wall.
The general requirements and application procedures found on Pages 21 through 27 are part of this specification and must be adhered to where applicable.
7. The contractor shall thoroughly inspect completed KMM membrane at the end of each day s work as well as before application of protective board.
Procedures
1. Apply cushioning or stripping layers of Standard Grade KMM membrane prior to the installation of the KMM waterproofing membrane.
2. The adhesive application rate for all waterproofing is to be 2 to 3 gal. per square.
3. Starting at the low point of the deck, set the first course of Standard Grade KMM membrane into a full bed of KMM Adhesive while the adhesive is still tacky. Rub and/or brusn thoroughly to obtain proper adhesion and to remove all entrapped air from under the membrane. End and side laps shall be
8. Proceed with application of the remaining phase of the horizontal system. Care must be taken to eliminate any puncture or damage of the KMM waterproofing mem brane system by other trades.
9. It is required that a suitable protective layer be placed over the entire membrane on both horizontal and vertical surfaces to provide puncture resistance during con struction and during placement of the wear ing surface as soon as possible.
10. When any portion of the membrane is to be permanently exposed, it must be covered with Aluminum KMM Flashing. Specification #710 for protection.
35
i:\d and Mastic A
*<
M
"'.c
^ we a - W W J
WV
i
ii
^
4 >JJ
>
lied V/stsrprcofjng
* i < tv
. . -- 4 wO^m.; Si^i^ .^/<! wsDe*'**`Wr` il ^'4l>
All-weather cold process mastic membrane system
Hydroshield Mastic 451 is a solvent based asphalt mastic which is unaffected by immersion in water either before or after curing. It will adhere tightly to damo or even wet surfaces. Hydroshield is not damaged by soil alkilinity. acidity or minerals. This unique mastic may be applied under an extreme range of weather and temperature conditions.
Hydroshield Mastic for Dempproofing. When applied to masonry or concrete con
struction. Hydroshield Mastic serves as an effective dampproofing barrier to prevent the entrance of moisture by capillarity. Usually only one coat is necessary for dampproofing. Hydroshield Mastic goes on cold and may be applied to a wet or dry surface.
nydrocnwo wwtw for vnmpioonnQ* When a permanent vapor barrier to prevent the entrance of water undera head of preesure is required, Hydroshield Mastic.
combined with Koppers Heavy Duty Glass Fiber Mesh, produces a tough, durable waterproofing membrane that cannot rot or deteriorate at sub-grade levels. For details of waterproofing .applications, consult your Koppers representative.
- rciicst.-cn juice
452 Primer Per 100 ft.1 (When Needed)
Dampproofing Waterproofing
Hto h gal. Kto H gal.
`n*yo-f--O-----H* N- M-a Vptr--MuA vflo ^m Per 100 ft.*
2 gal. 5 gal.
------------------------ S9-----------------
Koppars Hmtf Outy Qtow None 1 or more pilee
HydroahleM Top Coet Per 100 It1
None 3 gal.
-.1. --1 ____ JiG
/-\ t--c-, i--. >
Cai
l
W
- :;.c-acciieG as crsit emu,sicn zarr ^proofing.
*
V
Liquid Asphalt 480 is a filled, cold-applied, high-quality asphalt emulsion containing Bentonite clay.
When applied to masonry or concrete con-
struction. Liquid Asphalt 480 serves as an effective dampproofing barrier to hM|: prevent the entrance of moisture by capil larity. Usually two coats are necessary for
dampproofing. Liquid Asphalt 480 goes on cold and may be applied to a wet or dry surface. For detailed specificatiM consult your Koppers representative.
::i!c3ticn
Damooroofing
452 Primer Per 100 ft.* ti to K gal.
UauW Alphas 480 Par 100ft.1 (2 coats) 3 gal.
35
. EX ELI'-! E?, M4 1 nsu iaticns Urethane Roof Insulation Composite Roof Insulation
KOPPERS 7 1 /KOP Architectural and Construction Materials
Xocoers .-nesting todays insulation demands
Meeting the demands required to conserve our energy resources makes the need for high efficiency, deoendable roof insulation mandatory.
KooDers Company, Inc. offers Exeltherm URETHANE Insulation and Exeltherm COMPOSITE Insulation to meet todays energy conservation requirements,
it makes good sense to invest in a depend able Exeltherm roof insulation that can provide increased returns corresponding with the continued energy price escalation.
COMPARATIVE WEIGHT
COMPARATIVE PERFORMANCE
in ralation to "C" vatu*. Wsight in lbs. oer 100 sq. ft. BTU/hr./sc. ft./f/in.
for aauivalant. 15 "C" Value.
ExtiUitiiii UraMana
mm
1" pp
1
I
Exeltherm Urethane
"k"_____ 13 cm
fibrous glass i Dtrlite board
38 1-------
r.imur Qiasm
3" r--^---1-------- j--------- ft cellular glass fee. 900 1000 1800 2000
40 |------1
1 2"
"Data generated from Exeltherm Urethane with felt skins.
thickness required for equivslent k"
TYPICAL PHYSICAL PROPERTY DATA
Property
Teat Method
Thermal Conductivity "k" (Foam Core) STU/Hr/fH/F/in
ASTMC177
Comoretaive Strength, osi
ASTM 0 1621
water Vapor Permeability Perms--Inches
ASTM 0 355-62T
Service Temoerature. F
Dimensional Stability. % (Linear variation. 24 hrs.)
158 F/100% RH
Value 13 25
<1 0 -100 to 250
<1 0
3
I I
! Urethane Roof Insulation
. Exeltherm* Urethane insulation board combines a core of rigid. ' closed-cell urethane foam with integrally bonded, asphalt: saturated felt skins. A low "k" factor combined with high moisture
resistance and moisture vapor resistance derived from the i aspnalt-saturated skins provide high insulating efficiency and < long life. It is aporoved by Factory Mutual for use above non
combustible roof decks and as a Class II material on metal decks.
Size* Available: 36" x 48*. 48" x 98"
-C" Value
THERMAL CONDUCTANCE AND HANDUNG DATA
Square Approx. "R* Thickness* Pieces/ Ft. Per Lbs. Per Flute Vftlu* (Nominal) Bundle Sundte Bundte SpanaMRy
Exeltherm* Composite insulation combines two time-proven I building products, urethane roof insulation and perlite board j This unique combination provides a commercially acceptable
urethane insulation with both Factory Mutual approval for Class I construction and Underwriters Laboratories approval for use in Construction i and Construction II.
Sizee Available: 36" x 48". 36" x 42".
0 19 5.26 0.15 6.87
0.12 8.33
0 10 1000 0.09 11 11
0.08 12.50 0.07 1430
0.06 16.66 0,05 20 00 0.04 25.00
8"
r
1 2H~ 1 4"**
1.5" 1 75" 2'
2.25' 2.5* 3*
'Inciuoea bom membranes.
8 8
6 6 6 5 4
4
3 3
96 39
96 51 72 44
72 48 72 48 60 42 48 38 48 40 38 28 36 33
2X* 2X' 3*
3X" 3X* 3X* 3X* 3X" 3X" ' 3X"
"C" VMM
0.15 0.13 010 0.08 0.07 0.08 0.05
THERMAL CONDUCTANCE AND HANOUNG DATA
Square Approx.
"R" Thickness Ptpoea/ Ft. Per Lbs. Per Flute Value (Nominal) Bundto Bundle Bund* Spanablilty
6.67 1.5"
6 72 70
7.59 1.6"
6 72 * 70
10.00 1.75* 5 60 65
12.50 2.0*
4 48 56
14.30 2.5"
3 38 44
16.56 2.75* 3 36 46
20.00 3.0*
3 36 48
2X* 2X" 254" 3S4* 3S4* 3X* 3X*
Note: Under normal use, Exeitherm Insulations wiH retain an average of 80% of their thermal resistance R-faetor values.
37
EXELTHERM* Roof Insulations
Suggested soecifications
Any moisture present at the time the roofe Sftcrt fOi"T) SCSCifiCBtiCO
and general conditions
Vapor Rctardtr
insulation is applied may result in poor for standard buiit-uo roofing
adhesion of materials to tha deck and blis tering of the membrane. Moppings tend to
systems
Moisture vaoor tends to migrate from warm congeal rapidly in cold weather, even when Roof insulation shall be Exeltherm Urethane.
to cooler areas, in buildlrtg construction, the deck is dry. so extra care must be taken Exeltherm Composite, or Exeltherm iso-
vaoor retarders are used to retard or block to set insulation as quickly as possible while cyanurate foam panels (choose one), factory
the passage of moisture into walls or roof* the asphalt is still hot. Do not overheat the laminated to form an integral bond with the
ing assemblies.
bitumen to offset this rapid chilling, but surfacing skins, as supplied by Koppers
To determine whether a vapor retarder is keep the insulation close behind the mop Company, inc. Pittsburgh. Pa. Foam density
necessary, computations based on occu ping of hot bitumen.
:;
to be in excess of two pounds per cubic foot.
pancy and relative humidity inside the
"C" factor shall be:________
building and the outdoor temperatures during the various seasons must be con sidered. if the potential dew point occurs io. or above tne insulation, a vapor retardar is reouired.
On decks with alopas aver i" par foot, wood nailers should be used. Nailers should be the same thickness as the insulations and treated with a preservative compatible with the roofing system. They should be securely
Installation thicknets(es) shall be as indi cated on drawings. Lay insulation panels at right angles to the desired direction of roofing and in parallel courses with cross joints broken. Butt edges without forcing. Standard roofing practices for adhering
Since the specifier is aware of the actual listened to the deck at right angles to the
conditions of tho specific instaHatton,-trie r3n of the felt. The maximum spacing of the
specifier has tho responsibility to determine -mailers should be 48* O.C.
whether a vapor retarder Is required.
Wood insulation stops shall be nominal 6*
Protection of Material
wide by the. thickness of the insulation and
Exeltherm Roof insulation must be pro treated with a preservative compatible with
rigid board insulation to the deck shall be used.
The foam used in Exeltherm Insulation complies with the following specifications:
Fed. Spec. HH-I-530A.
tected from the weather at all times. No the roofing system. Insulation stops shall be U.S. Dept, of Commerce. Maritime Admin.
more insulation should be laid than can be securely fastened to the deck at the edgy* Spec. No. 32 MA-4B. Dept, of Navy NAV
completely covered with roofing materials on the same oay. At the end of each day's work or in the event work it stopped
abruptly, temporary water cut-offs should be installed at the edges of all drains and in the field of the roof. Such cut-offs shall be removed when work is again started.
and eaves (not parapets orequipment curbs).
Bitumen Exeithenn Roof Insulation manufactured with asphalt felt or asphalt saturated asbestos
skins, integrally bonded, is compatible with all typea.of B.U.R. bitumen, and can be laid direitfty'tn hot bitumen.
Fac. Spec. 49 YB. N.Y.C. Bd. of Std. & Appeals Cal. No. 91566 SH.
Koppers Company, inc.. supplies rigid ure thane and isocyanurste insulation materials. It does not practice''architecture nor engi neering. Roofing incorporating Koppers insulation products, we believe, results m
"Rigid foamed polyurethanes are organic materials, which deoompoee at 4S0*F^ and wil ignite and txmrat 600*-700F., or when exposed to open flame. These produota should not be installed in exposed appli cations."
Tasting laboratory approvals
Compliances Factory Mutual Underwriters Laboratories
Koppers Company. Inc. has submitted its products to the rigorous feauirements of both Factory Mutual Insurance and Under
Recommended bitumen application temperaturea: Steep Asphalt. Type III 400450F, Coal T*r Bitumen 350-400F
In aporoving any deck as satisfactory to receive Exeltherm Roof Insulation, only the deck surface is accepted, ft is the respon sibility of the building designer and the deck manufacturer to provide for:
A. expansion and contraction in a manner that will provide a stable base for the roof insulation.
B. support of maximum intieipated loads.
C. securing attachments vertically and
satisfactory installations when properly
Characteristics, properties, or performances of materials or application specifications herein described are based on data ob tained under controlled test conditions. Koppers makes no warranties, expressed or implied, as to the characteristics, prop erties. or performance of its products under any variations from such conditions in actual construction. Koppers assumes no respon sibility forthe effects of structural movement and makes no implied warranties what soever.
writers Laboratories and can report that laterally. -
No agent, salesman, representative nor
Exeltherm tfand Exeltherm Composite Roof O. the selection of the deck material `and
insulation are acceptable Claes I eompo-* construction details including their ability
nents for metal deck construction. Exel to contain bitumens.
therm Composite is also acceptable for U.L.
Constructions 1 and 2.
Koppers will not assume responsibility for
deck defects or bitumen seepage. The
Exeltherm urethane Roof Insulation is an placing of-conduits. bolt heads, etc., above
acceptable component for non-combustible the roof deck and below the roofing mem
decks and for Class II decks.
brane is not recommended. All projections
employee is empowered to change, alter or amend this provision unless it is done in writing by a duly authorized officer or employee of Koppers Company. Inc.
Exeltherm Urethane Roof Insulation whan or^openings in the deck should be com
field applied over 1" perlite roof insulation, pleted odor to the application of the roofing.
in a double layer application, will also meet Optimum adhesion to the deck is necessary
the requirements of Factory Mutual43|ass I for good roof performance.
Construction over metal decks. ^
Adheetves
Cold Weather Precautions .
Although cold adhesive attachment of
Roofing installation at temperatures below Exeltherm Insulation can be used, extra
45F reauires special precautions to insure care must be taken in the choice of adhe
satisfactory performance of the finished sive and application conditions. Hot applied
roof. Remove all traces of ice and snow from asphalt is the preferred adhesive.
the deck before applying roof insulation.
38
Exeltherm Insulation Application
KOPPERS 7 1/KOP Architectural and Construction Materials
1.0var Stoat Oaeka--MetaJ deck suitable for the installation of Exeltherm II and Exeltherm Comoosite Insulations shall be clean, dry and properly graded to all outlets. Only the surface of the metal deck shall be accepted by the roofing contractor to receive insulation. Apply the Exeltherm Composite Insulation felt side up. Apply Exeltherm II and Exeltherm Composite with edges parallel to the flutes and bearing on the surface of the metal deck. Secure the insu lation to the metal deck with hot steep asphalt at the rate of 12-15 Ibs/sauare or secure with five nails per 2' x 4' board or six nails per 3' x 4' board with mechanical fasteners of a type approved by FM. A preservative-treated wood strip compatible with the roofing system and of the same thickness as the insulation shall be secured to the roof deck adjoining all eaves to act as a stop for the insulation.
Steel decks with vapor retarder--When Factory Mutual Class 1-90 construction is required, install roof insulation over an FM Approved Vapor Retarder System and mechanically fasten around exterior perim eter according to Factory Mutual Loss Prevention Data Sheet 1-28.
2. Over Non-Nailable Decks--Non-naiiabie decks suitable for the installation of Exel therm insulations shall be provided clean and dry and property graded to all outlets. Prime the surface of concrete decks with Kopoers Hi Pen Pnmer approximately ^ gal/square. On precast units hold priming back 4 inches from all joints. Over all roof areas embed Exeltherm Insulation in hot steep asphalt approximately 20 Ibs/square. keeping asphalt 4 inches from all joints.
With vapor retarder--On primed concrete decks set vapor retarder in solid mopping of hot steep asphalt, brooming each ply to assure complete embedment according to manufacturers' specifications. On nonnailable sloping roof decks, in addition to the embedment of roof insulation in full mopping of hot steep asphalt, nailer strips (insulation stops) must be provided to pre vent root insulation from sliding.
3. Over Nakabie Decks--(Wood, plywood, structural cement fiber, poured gypsum, and acceptable lightweight concrete).
Over vapor retarder--Embed Exeltherm insulation in full mopping of hot steep asphalt. Lap in parallel courses. Stagger end joints in adjoining courses. Vapor retarder shall be capable of receiving hot steep asphalt.
Without vapor ratardor--Over all roof areas install Exeltherm Insulation. Lay in parallel courses. Stagger end loints in adjoining courses. Secure each insulation panel with five nails per 2' x 4' board and six nails per 3` x 4' board of sufficient length to pene trate structural deck at least H inches but not to protrude through underside of struc
tural deck. Set nail heads slightly below surface of roof insulation. When two layers of roof insulation are applied, apply first layer with fasteners penetrating the struc tural deck at least H inches, then apply the second layer in a solid mopping of hot steep asphalt. Stagger joints m each layer with those of the layer below.
Note 1: If application is over wood decks, cover the deck with one layer of rosin
sheathing paper lapping each layer not less than 1 " and nail sufficiently to hold in place.
Note 2: Since the specifier is aware of the actual condition of the specific Installation, the specifier has the responsibility to deter mine whether a vapor retarder is required. The application of the vapor retarder shall be in accordance with the recommendations of the manufacturer of the type specified.
Meta! Roof Deck Application
For FM approved Class l roof system as illustrated, install Exeltherm Composite, according to Factory Mutual Approved Guide for Class I. Insulated Steel Deck (See Also FM Bulletin 1-28.).
Exaltharm Uretnane Comoosita Roofing- insulation
Adhasiva or Bitumen as Raauirad Matal deck ----
Concrete Root and ?!aza Deck Apolicaticns
Exeltherm Insulation Urethane Apoiication
Exeltherm Urethane Root Insulation without Vapor Retarder shown.* When sprinklered at 130 square feet coverage per sprinkler, the roof may receive some insur ance advantages as Class I. where-according to FM guidelines, "values are not excessive". (See Also F.M. Bulletin 1-28.)
Gravaf -------
BUR
Exeltherm urathana
roofing insulation
Bituman Pourad concrata
a-
_s_.
o. `o
_Q_
Exeliherm High-Density Insulation Plaza Application
Exeltherm Plaza Insulation, a high density material (nominal 75 psi compressive strength), is recommended with hot applied waterproofing.
Pourad Concrata BUR
Exaltharm high oansity olaza
Roofing insulation
---
Bitumen Pourad concrata
:; Q
O, o
Wood Deck Application
Impregnated fire-retardant treated lumber or plywood is of low combustibility (when
treated according to FM guidelines) and acceptable for roof deck construction with
out automatic sprinkler protection. Grave) BUR -
Exaltharm uretnane roofing insulation
Bituman
SRI \ \ MVi twDBasaoiy(nailed! Rosin oaoar Wood deck
Gypsum--Lightweight Insulating P.cof Deck Acpiication
Gravel
BUR
Exeltherm urethane roofing insulation
Base ply
=F
`nailed)
A.o.'i' t>' t> <'.< t> ifck" Cx` > : <v >'
Gyosum lightweight
^ < . t> * / N.' ' n * Vr' A
insulating concrete
^ ^o
. k v . -1 *
_________________ < * > . q
'4
39
'(HL7ri53M U r.ccf !nsda-:!cn
Exeltherm* I is a non-composite factory laminated isocyanurate roof insulation board reinforced with glass fibers and faced with asphalt saturated asbestos. This unique combination results in excellent product strength and dimensional stability.
C" Value
12
to
THERMAL CONDUCTANCE. SIZES. ANO HANDLING DATA
"R" Value
Nominal Thiekneet
Pleoee Bundle
Sq. Ft Bundle
Weight Per Bundle
8 33 1.2
6 72
38
10 00
1.4
6 72
41
Flute SpenabWty
3.50
4 25
Compliances Exeltherm n is approved as a component of
Factory Mutual Class I Insulated Steel Deck Roofs and Factory Mutual 1-90 wind resis
.09 11.11 08 12.50 07 14.30
1.6 1.8 2.0
6 72 5 60 4 48
43 39 33
4 25 4 25 4 25
tance classification when applied in accord ance with FM Loss Prevention Sheet 1-28.
06 16.86 ,05 20.00
2.25 2.5
4 48 3 36
35 28
4 25 4 25
Sizes Exeltherm H Roof insulation is available in thicknesses ranging from 1.2" to 3.0". Sizes are 36" x 48". and 48" x 96". (See table for
.04 25.00
3.0
3 36
31
4'25
Nott: Under normal use. Exeltherm II Roof insulation will retain an average 80% of its tnormil resistance (R-feetor) value.
specific information). Precautions:
| COMPARATIVE INSULATION THICKNESS CHART DIMENSIONS IN INCHES
Exeltherm S Roof Insulation shall be pro tected from the weather and standing water at all times. No more'insulation shall be laid
-cVatue
"R" Value
Exeltherm II
Urethane Perlite
Compeelte
Flbroue Qlata
Parma
than can be completely covered with roofing matenals the same day. At the end of each day s work or in the event work is stopped
12 8.33 .10 10.00
1.2 1.4
1.65 2.06 30 1.75 2.44 3.6
abruptly, temporary water cut-offs shall be
09 11 11
16
1.85 2.9 40
installed at the edges of all drains and in the field of the roof. Such cut-offs shall be removed when work is again started.
.06 12.50 ,07 14.30
1.8 2.0
2.0 3 25 4.5 2.5 3.72 5 15
Warning:
06 16.66
2.25
2.75 4.33 6.0
This product wHI decompose and/or bum If
.05 20.00
2.5
3.0 5.2 72
exposed to sufficient heat or an ignition source of sufficient intensity. It should not
04 25.00
3.0
- 6.5 90
be used in exposed or inadequately pro tected applications. It should be installed according to Koppers specifications.
Pfopifty
TYPICAL PHYSICAL PROPERTY DATA Test Method
Value
The facers of this product contain asphalt saturated asbestos fiber. The Occupational Safety and Health Administration (OSHA),
Tharmal Conductivity "k" (Foam Cora) 8TU/hr/ft*/F/in
Compresaive Strength, gsi
ASTMC 177 ASTMD1621
.13 40
an agency of the United States government, 1 believes that repeated mnalation of asbestos
Water Absorption Incrsase in Volume (2 hr immersion) %
ASTM C 209
<1.0
fiber is a health hazard and may cause various diseases including asbestosis and !
Water Vapor Permeability Perms--Inches
ASTM C 355-62T
<1.0
cancer
1 Service Temperature. F
-- -100 to 250
Dimensional Stability. % (Linear variation. 24 hrs.)
158 F/100% RH
<1,0
Exeltherm H.Vietai Scot
i'CuiICm
' For FM approved Class I roof system as illustrated, install Exeltherm B.
. according to Factory Mutual Approved Guide For Class I. insulated Steel Deck. ; (See Also F.M. Bulletin 1-28.).
Graval BUR
40
F
J
KOPPERS 7 1/KOP Architectural and Construction Materials
Reinforcement Fabrics are necessary for wateroroofing and roofing systems because the waterproofing agents (bitumens) have practically no strength by themselves. Koooers Reinforcement Fabrics provide this extra strength in a manner similar to that of reinforcing rods in concrete. Some times called membranes, these fabrics serve as mechanical reinforcement for hot or cold applied bituminous coatings in roofing and waterproofing systems. They also pro vide the framework to build up coating thicknesses, achieving longer lasting water proofing systems. Once applied, they form stress-resistant pliable sheets that withstand stresses and strains from wind, vibration, and expansion or contraction due to temper ature changes.
Applications Of Koppers Reinforcement Fabrics are many, the largest being with hot or cold applied bituminous coatings in roofing and waterproofing.
Other applications include bridge deck
waterproofing and flashings, foundations, siaos. tunnels, subways, pipeline wrapping, pipeline lOint wrap, parapet wall treatment, asphalt paving repair and protection, drive
ways. parking areas and tennis courts.
Many of the reinforcement fabric systems installed over 25 years ago are still in use today In large construction protects such as highway bridges, their applications have insured complete protection against mois ture penetration that ultimately leads to corrosion and the weakening of the structure.
Roof Repairs are long lasting when Koppers Reinforcement Fabric is used. Quick repairs to roofing and flashing membranes are possible if a ply of fabric is embedded in the first application of roof coating. A second application then completely seals the area where blisters and cracks once appeared.
Roof Resurfacing with reinforcement fabric adds strength to existing built-up roofs. Since it is important to select the membrane mat performs best with a particular coating, Koooers manufactures fabrics that can be utilized with cold-applied products or hot bitumen Coated glass fabrics are available as well as glass mats and saturated cotton faoncs Glass membranes non-rotting feature, its ability to conform to irregular surfaces, and its high tensile strength makes it a highly desiraote reinforcement Cotton faonc is often used for strippmg-in and covering corrugated metal roofs.
When selecting the proper roof resurfacing reinforcement, it is important to also use the
proper amount of coating to assure a long
service life
Other Uses for Koooers Reinforcement Fabrics exist wherever waterproofing sys tems are reauired Tennis courts can better maintain their tight, smooth playing surfaces
with applications of Giasfab' membranes coated with bituminous or synthetic sealers. This wateroroofing combination eliminates the recurrence of cracks, thereby preventing water from seeping under the asphalt and gradually breaking up the base.
Tunnels are effectively protected against water seepage into and through the concrete shell with Koppers Reinforcement Fabric embedded m a bituminous compound. A properly installed tunnel waterproofing sys tem prevents rapid deterioration of reinforc ing rods, heaving of concrete and the formation of icicles on the underside.
Pipeline protection has been achieved through an application consisting of a bitu minous coating (Koppers Tar Enamel) and a reinforcement fabric (Giasfab membranes) to successfully prevent corrosion and soil stress.
Ptaza Deck Waterproofing provides sub terranean structures with needed protection against moisture. Any subterranean con struction. whether used for office space, classrooms, storage or a parking garage, must be watertight: including walls and top surfaces. Landscaped plazas are often con structed on these top surfaces, it is here that Giasfab1 is used as the reinforcing membrane in the waterproofing systems placed under the plaza surface.
Giasfab is available with a coating of asphalt or tar. to be compatible with the specified bitumen. Possessing the highest tensile strength of any reinforcing membrane currently m use. Giasfab provides a strong waterproofing system. It strengthens and secures the waterproofing agent between slabs and on walls under the plaza deck.
sealing and protecting them from water and chemical penetration.
When a reinforcing membrane is reauireo that is not coated with asphalt or tar. Koppers fills the need with Glascoaf*. Like Glasfao. Glascoat is a woven glass fabric, but is coated .with white resin. Glass mats and cotton fabrics may be needed in specific cases. Koppers makes these products avail able as waterproofing membranes, also.
Bridge Deck Waterproofing effectively pro tects bndge surfaces and substrates from premature deterioration Koooers Rein forcement Fabric, used in coniunction with coal-tar coatings, repels the adverse effects of weather, salt, gasoline and oil spillage. In addition, the waterproofing prevents spal ling of concrete and the corrosion of bridge reinforcing rods (caused by penetration of moisture and de-icing chemicals). The woven glass reinforcement fabric serves a function similar to that of steel mesh in concrete. Forming a stress resistant pliable sheet, the supporting membrane adds strength and serviceability to the inherent water resistance of the coal-tar emulsion.
Foundation Waterproofing And Dampproof ing at the time of construction can eliminate the problems of damage-causing leaks. Architects and engineers have long realized the advantages of waterproofing compounds in preventing or retarding the passage of water. The reinforcement fabric enables waterproofing compounds to remain station ary while being built-up to the specific quantities desired, thus allowing the speci fier to achieve the build-up necessary to resist existing hydrostatic pressure.
Koppors Asphalt Or Coat Tar Saturatad Cotton Fabrics are available in both standard and specification grade. The primary differ
ence between the two grades is weight.
Totton Fabric has the longest successful application record. Specification grade cotton complies with specifications from the federal government, the American Society
for Testing Materials (ASTM), the American Railroad ancFEngineering Association (AREA) and the American Association of State Highway Officials (AASHO).
Product
Spoclllcstlon Cotton Fabric
Standard Cotton Fabrle .
Appiteflbift SpedBcetkxe
Fad. Scac. SS-C-450A ASTM 0-173-74
AREA and AASHO forvarioutttatat.
-Nona
Nominal Sq. Yd. Dry Weight
3.5 oz.
*a ___ flCl'
2.0 OZ.
Sq. Yd. Saturatad Wt 10 oz. minimum
8.5 oz. Typical Analyze
Breaking Strength of Saturated Fabric
50 Wkrp 50 Fill Minimum
40 warp 20 Fill Typical Analyse
Nominal Thread Count
25 to 32 wars 24 to 32 Fill
JE
27 Warp 15 Fill
Typical Analyst*
Coating
Asphalt or Tar
Asphalt or Tar
Color Black
Black
Koppers Glaofato* And Glasooat* Woven Glasedat, a white resin-coated fabric are ^giaas fabric is greater than^cotton fabric or
Glass Fabrics are both well-known and. inorganic woven glasa membranes which' jute.
_
widely accepted inthe construction industry." will not rot. ere lightweight and conform to
Giasfab. an asphalt or tar coated fabric and irregular surfaces. The tensile strength, of
Product Qiaatab*
QMecoot*
-J^ofeaM * Sptetfieationt
Fed. Spec. HH-C*46flb ASTM 0-1658-73 Type t & II -
Whit*
Nominal Sq. Yd. Drr Weight 1.2 ox. to 2.0 oz.
1.4oz. min.
Sq. Yd. Saturatad WL
I.5oz.to2.6oz.
2 oz. to 3 oz.
Breaking Strength or Saturatad Fabrle
75 Warp 75 Fill Minimum
12 oz. to 2.0 oz. 1.5gs.to2.6oz;H.
. 55 Warp 64 Fill
Minimum
lrlaaomralerail Thread Count
20 X 10 or
20X20
20X10, or
20X20
Coating
Aaohalt or Tar
Color Black
Ream White
Koppers Jute (Burlap) Fabric is asphalt saturated. Commonly known as treated burlap, it is a coarse fabric which tends to hold more bituminous roof coating matertat.
resulting in a heavier build-up of coating in fewer applications. It is quite often specified for roofing and waterproofing. Jute is also used for protection of newly seeded areas.
embankmenterosion control and ditch liners
Jtar holding planted materials in place until grbwth.starts.
AppUeabte -
MomHe) 3q.
ProductSpocinoatlonoYd. Pry Watpht
Juto
Fed. Spec.
HH-S-00800
ASTM 0-1327-59
7.5 oi. _____
So. Yd. Saturated Wt,
9.75 minimum
Typical Analytic
_____
"
Breaking Strength o< Saturatad Fabric
SOWtrp 50 Fill Typical Analyse _
Nominal Thread Count
Wim 9 Fill Typical Analysis
Coating Asphalt
Color Black
m'
)-
42 r-
y\
KOPPERS 7 1/KOP
Architectural and
Construction Matarials
n
Koppers Gian Mats ara widely used with cold-aoolied roofing products. They are nonshrinkmg, possess excellant embedment dualities and conform to irregular surfaces.
The u. F Glass Mat is white, lightweight, comprised of fine glass filaments in a random swirl arrangement, reinforced with glass strands at the edges and bonded with
urea formaldehyde. An asphalt coated U. F Mat is also available.
Standard Glass Fiber Mesh consists of chopped mono-filaments formed into a random pattern and bonded with a resinous binder.
Heavy Duty Glass Fiber Mesh is constructed of heavy glass yam. chopped m two inch
lengths and formed into a jackstraw pattern It is bonded and coated with a pliable asDhalt. The open pattern permits excellent bleedthrough of the asphalt into wmch it is embedded.
Product U. P. Mat--White
U. F. Mat--Asphalt
Standard Mash Heavy Duty Mach
Binder
Urea Formaldehyde
Urea Formaldehyde
Resin
Asphalt
Glass Weight 100sd.lt.
.9 lbs.
.9 lbs. 1.39 lbs. 2.22 lbs.
Total Wsight 100 sq.ft.
i oibs.
3.5 lbs. 1.44 lbs. 2.9eibs.
Tens#* Strength Width
4 lbs.
31 lbs. 10 lbs. 25 lbs.
Tensile Strength Length
13 lbs
47 lbs
18 lbs 34 ICS
Fabrics
RoM Width (150' Long)
Nominal
Gtasfab'
48" 38' 24" 18" 12"
9" 6* 4* 3"
Glsscoet*
36" 24"
1i8r"
9"
. 6" 4*
3"
U. F. Aspnait
Glass Mat White
""
Heavy Duty Glass Fiber Mesh
T
36"X180' 36"x 180'
27"X 96'
Std. Glass Fiber Mesh
38"X 180'
ROMs per Carton
4
6 6 12 18 24 36 54 72
6 8 12 18 24 36 54 72
1
Carton Weights
48a 52# 40# S2# 52# 52# 52* 52# 52#
42* 28* 42# 42# 42* 42# 42# 42#
' 21#
1 7#
-------------------------------------
4 40#
1 11*
Fabrics Standard Cotton
Specification Cotton
--
Juts
Roil Width (150' Long)
Nominal
36" 24" 18" 12"
9" 6"
4"
3"
36" 24" 18" 12" 9" 6" 4" 3"
36" 24" 18" 12" 9" 6"
4"
3"
Roils par Carton
1 1 2 4 4 8 12 18
1 1 2 3
4
6
9 12
1
1
2 3
4
6
9 12
Carton Weights
22#
14*
22* 30# 22* 30* 30* 30#
40* 26* 40* 40* 40* 40* 40* 40*
44*
28*
44* 44* 44* 44* 44* 44*
43
After the roofing system is first applied, the degradation process Begins. If the roof is allowed to age unattended, you will be hit with the high cost of replacing the entire roof.
The materials needed to repair or maintain the common Built-up roof depends upon the construction and condition of the roof and the nature of the problem. Maintenance or repair isn't merely a matter of adding more bitumen. Each roof responds to the ravages of time and weather in different ways. Each needs specific materials to combat deterio ration.
Then there s the flashings, counter-flashing, paraoet walls, bitch pans, and wet insulation to be considered. Each of these areas is susceptible to deterioration and damage. Each reauires particular materials for main tenance and repair.
Kopoers has all the materials necessary to keep your roof in perfect condition. Our Roof Shield System, for instance, can add years of extra life to smooth surface asohait roofs and our resaturant applications have extended the life of many built-up gravel roofs 50% or more. We have also developed a "Built-Uo Roof Inspection Guide" which covers all components of your roof system.
Koopers will be pleased to assist you in putting a Planned Roof Maintenance Pro gram into practice. The life cycle of a roof can be greatly increased if this program is started at the proper time.
; Roof conditions
Dry Petts A Bare Spots: are caused by the oxidation of surface bitumen on gravel roofs. Roof Pelts become exposed to attack by the sun s ultra violet rays, and rapid deterioration follows. . Koppers root resaturants help avoid this situation.
Blisters: usually are formed by the presence of moisture resulting ' in vapor pressure that has been trapped between plies of felt on ` either gravel or smooth surface roofs. Koppers roof cements and | membranes can solve this problem.
; Alligatoring: is a condition almost universal to smooth surface ; hot asohait roofs. Attack from the sun starts immediately and : progresses to the formation of deep roof alligators as time goes 1 by. The appropriate Koppers asphalt emulsions will provide a
smooth top surface that will not alligator in the future.
Splits: are the result of excessive movement in the roof system. Freeze-thaw cycles or expansion and contraction may cause roof splits if proper expansion joints have not been provided. Koppers Strioshield and other systems can help control this condition.
Wet Insulation: will greatly effect the performance of any built-ub roof. Moisture trapped within the roofing system must be removed. Certain types of insulation can be successfully vented. This can eliminate costly roof replacement.
Worn Flashings: can lead to a total roof failure. Koppers cements and membranes offer a system to restore worn flashings to a "like new' condition if damage is more severe, our KMM aluminum flashing system offers an approach that will provide a completely new flashing with a durable aluminum top surface.
r
Effsciivs Maintenance
,Vi;;l
1 Si
ci,m
^ *4* MCpJiCi
*r ^ or
i-ssaTjrs;
KOPPERS 7 1 -KOP Architectural and Construction Materials
> Lowers the softening point of the top pour of bitumen and possibly the first inter-ply.
> Restores flexibility to dried or otherwise brittle felt.
Adds additional waterproofing to the surface.
> Provides a means of attaching new gravel.
Purpose:
Tar:
Many factors play a part m the service life of a roof. Some factors are uncontrollable. Others can definitely be controlled. There
Koppers Roof Reaaturant 410 has a base of coal tar roofing bitumen, blended with non volatile oils and graded asbestos fibers. Roof
1. All loose gravel must be removed from roof If existing gravel is to be reused, it must be washed free of silt.
are some aspects of roof degradation that will follow a recognized path and the end result can be predicted.
The normal degradation of a Duilt-up roof begins at the top surface. This is under standable since it is the top surface that is subiected to the deleterious elements of the atmosphere. As soon as a roofing bitumen is exposed to these elements, an age harden ing process begins. As the softening point of the bitumen increases, cold flow properties diminish and resistance to moisture pene tration decreases. The volatizing or sublim ing of a roofing bitumen takes its toll on the performance characteristics of the bitumen.
At some time pnor to the roof reaching the point when maintenance is no longer feasible, preventive maintenance should be established, even though the roof may not
Resaturant 410 provides the maximum softening effect and penetration obtainable from a product of this type. There is no addition of volatiles that would rapidly evaporate.
Koppers Fiber Coeting 41S is a tar base product specially formulated to meet Federal Specification SS-C-540. Fiber Coating 415 contains properly graded asbestos fibers plus selected penetrating oils.
Koppers Roof Resaturant 425 is an asphalt resaturant designed to have the greatest softening effect available in an asphalt base product. Roof Resaturant 425 is a blend of asphalt and oils combined with asbestos fibers to provide a product suitable for flat or sloped graveled roofs.
2. Silt is removed with water pressure, air pressure or vacuuming. If water is used, the roof must be allowed to dry completely before proceeding.
3. Drains are covered with screens to pre vent clogging of the dram system.
4. After the roof is properly cleaned, all necessary repairs are made with compatible materials.
5. Koppers Roof Resaturant is applied evenly onto roof at the rate of seven (7) gallons per square. The application rate may vary with the condition of the roof.
6. Gravel or slag is applied to cover the Koppers Roof Resaturant. Gravel shall be m the H-H" range, and must be washed. Care must be taken to avoid exceeding weight limits of the roof deck.
be leaking excessively. After considering
the age. type of bitumen used to construct
r the roof, and general condition, the use of
Koppers Hoof Resaturants offers an
effective means of implementing preventive
roof maintenance
45
Effacing Maintenance with Ter ar.d Asoneit -T: :Cf i.5?5 2*^i
KOPPERS 7 1 -KOP Architectural and Construction Matarials
> Lowers the softening point of the top pour of bitumen and possibly the first inter-ply.
- Restores flexibility to dried or otherwise brittle felt.
Adds additional waterproofing to the surface.
Provides a means of attaching new gravel.
Purpose:
Tar.
Many factors play a part in the service life of a roof. Some factors are uncontrollable. Others can definitely be controlled. There are some asoects of roof degradation that will follow a recognized path and the end result can Oe predicted.
The normal degradation of a Built-up roof begins at the top surface. This is under standable since it is the top surface that is subiecteo to the deleterious elements of the atmosphere. As soon as a roofing bitumen is exbosed to these elements, an age harden ing process begins. As the softening point of the bitumen increases, cold flow properties dimmish and resistance to moisture pene tration decreases. The volatizing or sublim ing of a roofing bitumen takes its toll on the performance characteristics of the bitumen.
At some time prior to the roof reaching the point when maintenance is no longer feasible, preventive maintenance should be established, even though the roof may not be leaking excessively. After considering
Koppers Roof Reuturant 410 has a base of coal tar roofing bitumen, blended with non volatile oils and graced asbestos fibers. Roof
Resaturant 4io provides the maximum
softening effect and penetration obtainable from a product of this type. There is no addition of volatiles that would rapidly evaporate.
Koppers Fiber Coating 41S is a tar base product specially formulated to meet Federal Specification SS-C-540. Fiber Coating 415 contains properly graded asbestos fibers plus selected penetrating oils.
Koppers Roof Reuturant 425 is an asphalt resaturant designed to have the greatest softening effect available in an asphalt base product. Roof Resaturant 425 is a blend of asohalt and oils combined with asbestos fibers to provide a product suitable for flat or sloped graveled roofs.
1. All loose gravel must be removed from roof If existing gravel is to be reused, it must be washed free of silt.
2. Silt is removed with water pressure, air pressure or vacuuming. It water is used, the roof must be allowed to dry completely before proceeding.
3. Drains are covered with screens to pre vent clogging of the dram system.
4. After the roof is properly cleaned, all necessary repairs are made witn compatible materials.
5. Koppers Roof Resaturant is applied evenly onto roof at the rate of seven (7) gallons per souare. The application rate may vary with the condition of the roof.
6. Gravel or slag is applied to cover the Koppers Roof Resaturant. Gravel shall be in the X-H" range, and must be washed. Care must be taken to avoid exceeding weight limits of the roof deck.
the age. type of bitumen used to construct
< the roof, and general condition, the use of
V_ Kobpers Roof Resaturants offers an effective means of implementing preventive
roof maintenance
45
Koppers Heavy Duty Roof Shield System comDines two Koppers roofing materials, Heavy Duty Glass Fiber Mesh and Liquid Asphalt 480.
Liquid Asphalt 480 is a filled, cold applied, high-quality asphalt emulsion containing Bentonite clay. It is the waterproofing com ponent of the Heavy Duty Roof Shield System. The unique gel structure of Liquid Asphalt 480 will not alligator, blister, or flow in hot weather.
Heavy Duty Glass Fiber Mesh is a patented reinforcing mat of a non-woven jackstraw pattern of short cable strands of glass fiber. Each strand is composed of more than 200 glass monofilaments and is completely sur rounded with the Liquid Asphalt 480. thereby eliminating water wicking by capillarity into the waterproofed surface.
I <I*
46
r
application
1. Surface Preparation. If there is a question to the soundness of the existing roof and insulation, a core cut should be made. All minor repairs must be made prior to priming. ANY blister containing moisture must be allowed to DRY before repair is made.
2. Priming. Every effort should be made to remove dust from the surface. If the dust cannot be completely removed. Koppers High Penetration Primer *452 should be applied at the rate of approximately % gallon per 100 sq. ft.
If a primer is used, it must be allowed to dry thoroughly before proceeding with- Roof Shield application.
3. Flashing. Flashing areas shall be exam ined. repaired and primed as required. Roof Shield should be applied first to flashing areas.
4. Application. Brush or spray-on an embed ding coat of Liquid Asphalt 480 at the rate of
4 gallons per 100 sq. ft. Do not apply if temperatures below 40F. are expected within 8 hours or if rain Is expected before the emulsion has time to dry
While the emulsion is wet. embed Heavy Duty Glass Fiber Mesh into it with firm brush pressure forcing the emulsion through and around the glass strands. Each suc ceeding glass strip should overlap the preceding one by 2 inches. Roll ends of Heavy Duty Glass Fiber Mesh should over lap 6 inches. Do not allow dry or starved laps. Permit Liquid Asohalt 480 and Heavy Duty Glass Fiber Mesh to dry sufficiently to permit foot traffic.
After the embedding coat is dry, a top coat of Liquid Asphalt 480 is sprayed or brushed on at the rate of 3 gallons per 100 sq. ft.
'i
J
' { ym.-^ 'e*
** C * * 7^
-' '- *W ? < -- ** . **e . . . J e* i J -**y* -m +*i Wj'
Koppers asphalt base aluminum coatings contain pure aluminum paste consisting of millions of tiny pigment flakes. When the coating is applied, these flakes rise to the surface and arrange themselves into many shingle-like layers of aluminum. The result is a reflective metal surface that protects the substrate from the elements. With Kopoers aluminum coatings, there is no peeling or separating because the asphalt base securely bonds the aluminum to the pro tected surface.
Aluminum Coating 434 contains three pounds of extra duality aluminum paste per gallon of high grade, non-fibrated asphalt base.
Aluminum Coating 435 contains three pounds of extra quality aluminum paste per gallon. This coating is reinforced with asbestos fibers for a thicker, tougher coating and extra life. Aluminum Coating 444 contains two pounds of extra quality aluminum paste per gallon of
high grade non-fibrated asphalt base.
Aluminum Coating 445 is the same as 435 but contains two pounds of paste per gallon.
1. Preparation--The surface to be coated should be cleaned of all loose material such as gravel, dirt, dust, rust or scale. All breaks, cracks, holes and other structural defi ciencies should be repaired prior to applying the Aluminum Coating.
2. Priming--Before applying Aluminum Coatings to roofs, dry or dusty felts should be primed with Koppers Hi-Penetration Primer 452 at the rate of approximately X gallon per 100 square feet. This preliminary step insures proper adhesion of the Alumi num Coating.
3. Coating--Stir thoroughly before and occasionally during application. Apply with spray or brush.
4. Curing--Allow one month curing time before application over new asphalt emul sion coated roofs. Allow three months curing time before application over new asphalt or solvent type asphalt coated roofs. Oo not apply over "dead level" surfaces subject to standing water.
COVERING CAPAcmr
(Perl 00 sq. It.)
Type of Surface
Metal Composition
Non-Fibrated Aluminum
X to X gallon X to 1 gallon
Fibrated Aluminum
1 to IX gallons 2to3'gallons
KOPPERS 7.1/KOP Architectural and Construction Materials
Information contained m this bullatin it oratanted in good taith.but it it not to be inferred ttitt by oubiicttion hereof by Koppera Company. Inc., nor by tha use or'ampioymant by tha raaoar of any
suggestions ot method contained herein, that Koppers Company, tnc. has assumed any liability for infringement ot any patent, foreign or domestic, nor given any warranty, expressed or implied.
47
Contact a Koppers Sales Office Near You
* Bessemer. Alabama 35020 P.O. Box 752 205-744-9110
" Commerce. California 90040 5900 S. Eastern Avenue Suite 104 213-726-8666
Burlingame. California 94010 1801 Murchison Drive 415-692-3330
Atlanta. Georgia 30338 4380 Georgetown Sq. 404-458-8851
* Elmhurst, Illinois 60126 188 Industrial Drive 312-833-3380
Southfield, Michigan 48075 24800 Northwestern Highway 313-352-3920
St. Paul, Minnesota 55104 1000 N. Hamline Avenue 612-646-7801
Kansas City, Missouri 64111 Room 5 V.F.W. Building 816-531-6680
St. Louis. Missouri 63101
706 Chestnut Street \ 314-241-8096
* West Orange, New Jersey 07052
Paragon Building.
10 Rooney Circle !, '
201-736-9150'
j: Tl
Charlotte,,NoTtfiCaTolina " *
1409 Eastfloulevardl P.O. Box 3186 4 3 704-375-44277 J j
Wickliffe^Ohlo 44092
30060 Lawiancifilvcut 216-944-3808^ .
Portland. Oregon 9722^ .
7540 N.W. SL Helens Rcfiawf
503-286-3681
-^
* Pittsburgh, Pennsylvania 15219 1028 Kippers Bldg. I
412-2^1-2360
'
Richanjfeon, Texas 75081
1221 International Parkway 214-69^-1103
-
Oistrict Offees
KOPPERS
Architectural and
Construction Materials
CM-J47-99