Document dQVeEa9gExzV7OLOq4ymbRNwQ

Monsanto Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Anniston Summary C. K. Eastman A. J. Koenig J. C. Landwehr L. J. Boesch G. W. Miller U. B. Papageorge W. F. Taffee H. L. Williams November , 1968 Cost Improvement Results For First Eleven Months Estimated Actual Target % of Target Month $11,545 $36,130 32* YTD $376,455 $460,500 81% General Offices U. C. Carder D. E. Cayard D. Danna (5) H. O. Hehner P. B. Hodges D. B. Hosraer (2) W. A. Kuhn C. F. Luecke H. L. Payton N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail Organic Division Increased demand for Solid Aroclor (50% above capacity for 1969) can only be met by making solids In liquids system plus successful demonstration of: 1. Yield Increase by improved Santowax R composition and radiation instruments projects 3015 and 3OI6. 2. First sales lot of blended 4465 in early December. 3. Maintenance projects 2924 and 2942. Installed spare pump and SS circulating line on chlorlnator. 4. Additional chlorine unloading dock-project 2342. These items are in progress now and should be Installed by the end of January 1969. The No.l Biphenyl Tubular Unit was down 2 weeks for revision and is now on stream after a smooth startup. Other Locations D. W. Jackson-WGK T. M. Patrlck- So.2nd.St. CED has taken over the project to purify biphenyl hydrogen for HB-40. Production of Aroclor 5460, color<1 Gardner, can be accomplished using Santowax R which has been pretreated to remove color bodies. Plant production of Aroclor 4465 by the blending process is ache duled to begin week of 12/1/68. Initial production of 20 M lbs. will be used for customer perfomance evaluation. L------- --------------------------------I____ ___ ___________________________________________________________ f4etasv.li/i/iMi . COMPANY CONFIDENTIAL INFORMATION .. 0346292 . "This document contains csnfldential Information which is the property of Monsanto Company. Only those portions of the document relevant TOWOLDMONOQ44388to a duly authorized individual's need to know may be exetpted for him. The report must not be sent outside the Company without written Company Confidential 2. Organic Division (Continued) Staley Grade HC1 project approved 11/20/68. Long delivery items ordered. Design scheduled for 2/1/69 completion. Agricultural Division Sulfur recovery status reviewed with CED Project Engineer. Potential markets for recovered sulfur being evaluated as an alternate to use in PgSj. Tentative process will be issued for approval by 1/1/69. Parathlon recovery progress report issued. Project ($3,000 expense) submitted to inspect unit and determine cause of pluggage. Design and Drafting Santowax Still design and drawings completed and forwarded. Solid Aroclor work underway with top priority. Utilities Cost Improvement Collection of data for Plant Power Factor Improvement and Plant Central Com pressed Air System was completed. Progress reports on these projects will be issued in December. CED Liaison Aroclor/Biphenyl flaking-bagging equipment being modified at months end as start-up reveals needs. Personnel Mr. J. T. Bell joined PR&D effective 12/1/68. Mr. Bell will be responsible for direction of the plant PR&D programs. Jw TOWOLDMONOQ44389 N u m b e r s n (S 1,0 0 0 > f-I Company Confidential TOWOLDMONOQ44391 AROCLOR E. E. Bowles, C. R. Mcllwain,(V. R. Haupt) Cost Improvement Month YTD Target $4910 $52,310 Actual $9800 . $42,265 Company Confidential 3. Evaluate QuaterphenylPolyphenyl Effects on Solid Aroclor Yields 1969 Savings $63,200 NFC $14,000 TSD Objective B-8 (a) Radiation instruments for measuring densities And level received. Drafting underway. Submitted request to Alabama Department of Public Health for radioactive materials license. Improve 5460 Color TSD Objective 1969 Engineering evaluation began on PR&D method to improve the color of Aroclor 5460. The most promising method Involves sodium treatment of the Santowax R raw material. Solid Aroclor 4465 Savings $12,000 by BlendingNFCzero1969 TSD Objective Market testing begAn on the new blended Aroclor 4465. The first sales lot will be made in early December 1968. Therminol System Evaluation TSD Objective 1969 TSD recommendation, based on computer simulation and plant tests, are being prepared. Distribution is planned for eArly December. Liquid Still Debottlenecking1969 Evaluation TSD Objective Increased sales forecast for Solid Aroclors indicates the necessity of Solid production in the liquid system. This will drastically reduce Liquid Aroclor capacity unless present equipment capabilities CAn be maximized. Engineering evaluation of the present system is in progress and a plan for improved operation is being formulated. 0346296 TOWOLDMONOQ44392 AROCLOR (Continued) Company Confidential 4. Installation of Entrainment Separator - No. 2 Liquid Aroclor Still Capacity Increase NFC $4,500 TSD Job 868 Project 3093 was issued for approval 11/19/68. Engineering work is under way, drafting priority is being evaluated, and completion date targeted for July, 1969. This is part of overall plan to debottleneck the stills. BIPHENYL-SANTOWAX W. G. Niemeyer, (V. R. Haupt) Cost Improvement Month YTD Target $3,335 $40,155 Actual 0 $100,330 Debottleneck Biphenyl Capacity Stills to 87.6 M lb6/yr.Increase TSD Objective B-7 (a) CED has issued piping and structural drawings for work in the distillation area. Equipment installation scheduled for February 1969. No. 1 Furnace Upgrade Capacity TSD Objective Liaison (CEA-1892)IncreaseB-7 (c) Work in furnace area is essentially complete. Furnace was shutdown on November 9. Work started on November 10 for a scheduled two week shutdown to replace internal coils and connect piping to new preheaters. Field work was completed ahead of schedule. Hydrotest of new piping system was made on November 20. Followed by 48 hour brickwork "dry-out" period. Benzene feed was started about 2 PM on November 23 and reached normal operating temperature by 12 PM on November 23. Unit was shutdown on November 25 for about 6 hours to tighten flanges at reboilers. No. 1 Furnace continuing to run well after a smooth start-up. Biphenyl-Santowax TSD Objective MIPB-l (a) Biphenyl TSD manpower is tied up as Manufacturing Representative on No. 1 Tubular Unit revision and debottlenecking the stills plus the Santowax R column project. These projects will continue until February 1969. Therefore the Biphenyl MIP is not expected to be published until April 1969. 03*16297 TOWOLDMONOQ44393 Company Confidential 5. BIPHENYL-SANTOWAX (Continued) Santowax R Quality Distillation Column__________________________B-7 (d) TSD Objective Construction planning and scheduling is active on Phase I of the project. Phase 1 Includes installation of column and new Montar-9 pump with manual controls. The column and pump are scheduled to be installed by the end of December. HB-40 J. L. Brown (G. W. Miller) V. R. Haupt Alternate Hydrogen Supply Project Scope TSD Objective 1969 Progress reports summarizing complete PR&D evaluation are in typing, and will be issued in early December. CED has requested competatlve bids from Linde and other alternate vendors to Chemical Design. Plant manufacturing repre sentative has maintained contacts with CED to follow progress. Installation of 2nd Rate Increase Autoclaveup to 200,000 lbs/mo. TSD Job AFE 3 CED supplied assistance by Walt Peterson for a design for immediate of a second HB-40 autoclave. The autoclave was obtained from WGK surplus and instal lation will start in the first week of December for completion before end of year. This clave will contribute a 20% Increase in capacity by permitting start of second batch during last 15 minutes of previous batch when hydrogen is avail able but not being used. CHLORINE D. W. Dudley (D. c. Malm) Cost Improvement Month YTD Target $2,750 $41,350 Actual $ 425 $57,755 Reduce Mercury Usage To Savings $1,700 TSD Objective 0.75 lbs. Hg/Ton Cl?______________________________________________________ B-6 (b) Project to install acid wash tank for recovering mercury is in construction. Completion is scheduled in December. 0346298 TOWOLDMONOQ44394 Company Confidential 6. CHLORINE (Continued) Brine Dechlorination Savings $6,875 TSD Objective ________________________________________________________________________________B-6 (c) No change in status. Waiting for maintenance to detect and repair leaks in vacuum system. Central Chlorine Project Scope TSD Job 860 UnloadingDetailsCEA 1831 E. D. Sundstrom and R. J. Hood met with plant to map out details of CEA 1631 on November 25-27. Drawings of existing equipment layouts were forwarded to CED for design purposes. HC1 0. J. Norris, J. M. Jones, (D. C. Malm) Cost Improvement Month YTD Target $1,830 $7,910 Actual $ 800 $4,200 Production of Staley Increased Sales TSD Objective Grade AcidAnd S?,400 SavingsB-10 (c) APE number 3076 for $6,000 to Install coalescer prior to carbon tower treatment was approved 11-20-68. Long delivery items have been placed on order. Project has been given high priority for drafting. Drafting expected to begin 1-1-69. Transmittal targeted for 2-1-69. Progress report was published 11-15-68. Muriatic Acid StorageSavings $21,200TSD Job 497 Bid package has been submitted to Purchasing Department. Contract expected to be completed by 3-1-69. Foundation construction still in progress. Revise HC1 Manufacturing TSD Objective Long Range PlanImprovement PlanB-l (b) Work delayed 6 months due to high priority PNP debottlenecking. Revised target date 6/1/69. 03462`*9 TOWOLDMONOQ44395 PNP 0. J. Norris, J. M. Jones, (D. C. Malm) Cost Improvement Month YTD Target $2,500 $116,500 Actual 0 $ 55,100 Company Confidential 7. Debottleneck to 1.8 M #/mo. Capacity TSD Objective 1969 Project premise for preheating and pressurizing the charge tank issued. Approval being held until recommendations from maintenance engineering, on charge tank wall thickness loss to corrosion, are received. Mid November inspection showed carbon steel tank to be heavily pitted and ability to withstand pressurizing questionable Project for larger wash water pump transmitted to maintenance. Transmittal of project on new filter pump expected by 12/6. Increase Reactor Capacity TSD Objective Temperature_____________IncreaseB-9 (b) Scheduled shut down in mid November for repairs prevented further studies on reaction time. Currently awaiting lab results on recycle composition in an effort to find variable causing poor letdowns. Study of Molar EVOP TSD Objective Ratio NaOH/FNCBB-9 (c) No action in November; programmed PNCB charge increases set-up. Will review job with production first week in December so tests may begin in field by 12/9. Revise MIP TSD Objective B-l-fe) Typing revisions in progress. Work delayed due to high priority manpower planning for 1969. NIRAN D. W. Dudley, K, G. Hale (D. C. Malm) Cost Improvement Month YTD Target $19,325 $176,090 Actual 0 $108,850 03A6300 TOWOLDMONOQ44396 Company Confidential 8. NIRAN (Continued) Solvent Addition Savings $59,000 TSD Objective _________________________________________________ B-5 (a) Savings of $50,600 have been obtained during the 1968 Methyl run versus a 1968 target of $50,500. An EV0P of Clj and N2 levels during the 1969 Methyl run is expected to yield additional savings in this area. Sulfur Recovery from Residue $500,000/yr. Savings, 407, Reduction in SO2 in Air TSD Objective B-5 (d) The sulfur recovery process and project status were reviewed on 11/18-19 with the CED project wnager. Future work for Anniston TSD and PR&D was reviewed along with CED plans. Potential markets for recovered sulfur are being evaluated as an alter nate to sulfur use in l^S' Tentative process by PR&D expected 12/68. Demonstrate Parathion Recovery Savings $70,000 and 10-15X Reduced COD Loading TSD Objective B-5 (a) Progress report summing work to date and proposed work plan was published 11/19/68. Project No. 3106 for $3,000 expense was forwarded for plant approval 11/26 to cover inspection of coalescer for cause of pluggage. Submerged Pump for RI Control of Chlorination Savings $1,500 TSD Objective B-5 (c) No tests ran in November. Monel pipe has been Installed and initial tests will begin in December. Fume Collection System Reduce Corrosive TSD Objective in Parathion DepartmentAtmosphereF-10 Wrap-up report will be issued in mid-December. ENGINEERING DESIGN AND SERVICES Mechanical/Electrlcal/Instrument Design and Drafting J. C. Price, J. A. Veazev. R. L. Brewer. J. K. Rennie. (W. F. Taffee) Highlights Phase I of Santowax R column installation is underway and controls design package completed and critical instrumentation components for phase II on order. Work underway on Solid Aroclor chlorination and still controls to provide increased production. 0346301 TOWOLDMONOQ44397 Company Confidential 9. ENGINEERING DESIGN AND SERVICES (Continued) Highlights (Continued) Acidic spring water sewer drafting delayed until December by Aroclor startup and Santowax column. Reviewed Aroclor freight elevator based on recommendations of latest safety audit. AFE covering changes recommended to provide safer opera tion will be forwarded for approval in January. Procedure for Electrical Safety TSD Objective / TestingA-6 TSD/Maintenance meeting rescheduled to December 6. Design Responsiblity Safety TSD Objective ' in Disaster Control PlanA-7 Radio equipment specifications and complete design transmittal are scheduled for December. Niran Interlocks Safety TSD Objective ________________________________________________ ________________________________A-14 (b) AFE, originally scheduled for 11/30 delayed by Santowax work. Will submit in December with design scheduled for last quarter of 1969. UTILITIES ENGINEERING J. C. Price, L. 0. Chambers (W. F. Taffee) The projects for Installation of Gas Meter at Biphenyl and Changing Cooling Water on Trane Compressor to Tower Water were approved. These projects will be forwarded for drafting in December. At the request of W. E. Chandler, re-evaluation of the steam and water meter projects was started and is expected to be completed in December. Collection of required information to evaluate plant power factor improvement and plant central compressed air system was completed, preliminary estimates are being prepared and progress reports will be issued in December. Project to protect the 20 inch city water main from corrosion was forwarded for typing and approval. PLANT IMPROVEMENT G. C. Goodwin (W. F. Taffee) Published 1968 Plant Improvement third quarter progress report. AFE forwarded for solids incinerator at plant dump. 1969 Plant Improvement Program preliminary scope has been completed. 0346302 TOWOLDMONOQ44398 Company Confidential 10. ASSIST OPERATIONS ON START-UP V. T. Langdon (W. F. Taffee) CEA 1430 - Aroclor Expansion Temporary drumming facilities Installed and operating satisfactorily. Flaking and bagging equipment being modified as start-up uncovers needs. Thermlnol heating system started up satisfactorily. POLLUTION CONTROL E. G. Wright <W. F. Taffee) Reporting Spills and Other Non-Routine Operating Conditions in the Plant Pollution Abatement TSD Objective F-4 No air emission or spill reports were received during November. Install Adequate Drainage Pollution Abatement TSD Job 729 at Soda Ash Slurry Tank _________ ______________ _____________. Concrete pad Installed during Niran turn-around. This pad has eliminated PNP and soda ash from getting into Snow's Creek from slurry tank. Install Solids Removal Pollution Abatement TSD Job 808 Equipment at Waste Treatment Plant________________________________________________________________________ A revision to this project will be prepared as soon as firm quotes received from the electrical and piping contractors. Special Activities 1. On 4 trips to Coosa River everything okay. 2. Visited City Treatment Plant Personnel and discussed solids problem with them. They agreed that problems are not as severe during winter months. 3. Completed pollution control objectives for 1969. Waste Treatment All wastes were effectively treated during November. Average values for Monsanto's effluent to City Treatment Plant in November are as follows: Average Daily Specifications PNP COD Parathion BOD 1.0 ppm 51.0 ppm 08 ppm 3.6 ppm O ppm ''\200 ppm '<3 ppm <200 ppm 0 3*6303 TOWOLDMONOQ44399 PROCESS AND QUALITY ANALYSIS W. B. Dunlap Company Confidential 11. P2S5 Parathion Correlation Study_________________________ Potential $50,000 Savings TSD Job 827 A Progress Report was issued summarizing a survey of viscosity-percent phosphorus relationships. Viscosity serves well as a day-to-day control of the reactor, but long term correlation is very poor. Variability is high, and must be reduced before optimization studies are made. Identification of Potential Parathion Variables______________ $17,000 Savings TSD Job 828 A Progress Report was issued summarizing the survey of variability in assay of chlorinated crude intermediate. The random error is two great for practical optimization studies. An experiment to isolate components of variability was outlined. RIG Documents Manpower Planning TSD Objective 1969 Overall Process and Quality Analysis effort to contribute to the MIP's was defined. The manpower requirement for this effort was summarized; cost improve ment potential was totalled. From the overview objectives were set up in terms of dollar savings and work accomplishment. RIG documents were written for P&QA Supervisor and Process Analysis Technician. Quality The RFT Index was 98.5 with 7 lots rejected out of 471; 6 out of 427 from the Organic Division. The Plant Quality Score was 90.5, down 0.2 from Oct ober, with YTD score of 95.0 against a target Of 93.0 minimum. 0346304 TOWOLDMON0044400 PLANT LABORATORIES G. W. Miller Company Confidential 12. PROCESS RESEARCH AND DEVELOPMENT J. T. Bell Solid Aroclor G. L. Arnett 1. Aroclor 5460, color <1 Gardner, has been produced under laboratory conditions^ Pretreatment of"Santowax R with metallic sodium produces a raw material which under present Aroclor 5460 processing conditions yields Aroclor 5460 with a color level equal or superior to that of competition (Bayer and Kanekafuchl). Process development is scheduled for completion by 1-15-69. 2. Catalyst studies on Solid Aroclor production have been terminated. Based on the studies recently performed a 30% rate increase of chlo rination can be expected by substituting either Aluminum metal or Aluminum chloride for the present ferric chloride catalyst. Only minor composition changes are detectable by infrared inspection of material produced with aluminum systems. HB-40 - Biphenyl Hydrogen Purification J. L. Brown 1. Results of studies conducted to determine the allowable Carbon Monoxide concentration in the hydrogen feed stream for HB-40 production show that no detectable difference in hydrogenation cycle time is realized at CO levels of 50 ppm and below. However, cycle time penalties first appear somewhere between 50 and 100 ppm CO. Therefore, to Insure that no cycle time increase is realized from hydrogen quality, 50 ppm CO has been accepted as the maximum tolerable level. The results are Included in a report (Anniston 710-861, No. 3) to be issued on 12-3-68. 2. A study was completed to determine the actual hydrogen consumption rate curve in HB-40 manufacture. Based on scaled-up laboratory data determined at atandard HB-40 operating conditions, the maximum consumption rate which occurs at the start of the hydrogenation is 78 lb./hr. This data is also Included in Anniston 710-861, Report No. 3. 3. Tests were completed on the Heatless Solid Bed Adsorption Pilot Unit designed and constructed by Chemical Design, Inc. The unit was operated successfully with Biphenyl Hydrogen Off-Gas for over 700 hours with no major problems. Carbon Monoxide, which was present in the feed stream in amounts from 2,0 to 2.5% was removed to a level of 50 ppm and below with hydrogen recoveries reaching 75%. Optimum operating conditions meeting the 50 ppm CO specification limit gave a hydrogen recovery of 75%. The report (Anniston 710-861, Report No. 4) detailing the pilot operation will be issued on 12-4-68. 0366305 TOWOLDMONOQ44401 Company Confidential 13. PROCESS RESEARCH AND DEVELOPMENT (continued) Sulfur Recovery I. Ransaw, W. H. Howard 1. Major improvements in the process washing ateo were accompllahed during November, By washing with solutions and altering ionic strength the organic content of sulfur can be reduced to 0.03-0.04%. 2. Final investigation of a hydrolysis procedure on washed sulfur shows that little or no benefit is realized from hydrolysis after an effective wash step. The minor reduction of carbon realized from hydrolysis is not significant enough to warrant the incorporation of a hydrolysis step. ANALYTICAL AND QUALITY CONTROL 1. Analytical work load was below normal during November due to parathion turnaround. 2. Approval was received during November to purchase equipment recommended by R. A, Munch for improved Aroclor analytical testing. The new equipment and procedures are scheduled for use during the first quarter of 1969. Complaint Report Quality No. Material Customer Reason 8-A-68 Aroclor 5460 Precision Cast Parts Dark Color YTD Quality Complaints/100 Shipments 0,11 : Target 0.20 Service None YTD Service Complaints/100 Shipments 0.16 : Target 0.20 Cost and Operational Indices October 1968 YTD Average Target (1) Manhours/Sample (2) Dollars/Manhour (3) Lab % Total Plant Cost (4) Overtime % 0.51 8.50 0.91 3.5 0.41 8.64 1.05 4.49 0.40 8.50 1.50 5.00 0346306 TOWOLDMONOQ44402 Company Confidential 14. COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT Peraonnel 1. Interviewed R. L. Russell for position of Senior Process Engineer. 2. J. T. Bell reported for assignment as Senior Process Chemist Supervisor of PR&D. Mr. Bell is a MS chemist graduate of Mississippi State and has five years experience in teaching and industrial research. 3. J. 0, Hopper joined the Lab 11/11 replacing M. E. Twigg who transferred to the Personnel Department. Development 1. Gould's Pumps conducted two 4 hour seminars to plant engineers concerning centrifugal pumps. 2. J. C, Price, W. F. Taffee, J. A. Veatey, J. L. Brown, W. B. Dunlap, V. R. Haupt, and G. W. Miller attended Kepner-Tregoe Problem Analysis and Decision Making course held at Holiday Inn 11/18 thru 11/22. 3. G. C. Goodwin attended "Technical Writing" Seminar held by IEI in Atlanta 11/12. 4. E. G. Wright and Ed Bowles attended an IEI seminar on "Effective Oral Presentations" held in Atlanta 11/20. 5. R. L. Brewer visited CED and WGK during 11/12 thru 11/21 for a corporate corrosion seminar at CED and indoctrination in Materials Engineering and Inspection at the W. G. Krummrlch Plant with 0. W. Siebert's group. 6. J. C. Landwehr attended Associated Industries of Alabama meeting in Birmingham on November 4, concerned with presenting industries' testimony before the FWPCA National Estuarine Pollution Study hearing scheduled for Nov. 21 at Mobile, Ala. Visitors 1. E. D. Sundstrom, R. J. Hood, CED engineers visited plant Nov. 25, 26, and 27 concerning Bulk Chlorine Handling project. 2. V. Schotte, CED, in plant 11/18 and 11/19 to review sulfur recovery process and project status. 3. Technical representative from Chemical Design Incorporated discussed final design of biphenyl hydrogen purification unit on Nov. 14. R. L. Sllfer, process design representative for CED, participated in the meeting. 4. Walt Peterson of CED spent Nov. 19-27 at plant to develop design for installation of second autoclave in HB-40. 0346307 TOWOLDMONOQ44403 PROCESS IMPROVEMENT Company Confidential DISTRIBUTION OF TIME BY TECHNICAL SERVICE Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. NEW PRODUCTS / s. P.LANT IMPROVEMENT ASSIST OPERATIONS 20 10 0 20 10 0 SPECIAL ENGINEERING SERVICES w0.1 ""1 TECHNICAL MANPOWER MISCELLANEOUS ACTIVITIES AND ABSENCES 50 AO 30 s J Jan. Feb. March-Apr. May June July Aug. Sept.-Oct. Nov. Dec. 03A6308 TOWOLDMONOQ44404 IN MAINTENANCE FOR CONSTRUCTION IN MAINTENANCE COMPLETED NOT CLOSED PROJECTS SUBMITTED FOR APPROVAL APPROVED PROJECTS IN TSD company uonnaenaai TSD PROJECT SUMMARY TOWOLDMONOQ44405 ANALYTICAL SAMPLES '' 60 . 56 5?. 48 44 40 2400 2300 2200 ANALYTICAL MANPOWER 2100 2000 1900 1800 1700 0.6 Monpower/sample 0.4 0.2 11.00 10.00 $/Manhours .. ' X Total Plant Operating Cost 9.00 8.00 7.00: 2.0 1.5 1.0 0.5 Overtime 7. 7 5 3 1