Document dQRb58X0RdDzMMJN02VqnX0bb
AR226-2171
^'y Debbie J Mulrooney 08/02/2001 10:52 AM
To: cc:
Subject:
carrington@mail.dep.state.wv.us Chris E Shoop/AE/DuPont@DuPont, Robert L Ritchey/CL/DuPontQDuPont, Robert F Pinchol/DEV/AE/DuPont@DuPont, Kart G Kronberg/AE/DuPont@DuPont, Andrea V
Malinowski/AE/DuPont@DuPont Building Pile
Chris,
Here is a preliminary building file. Note that this is only preliminary and I will probably be making
D modifications to it after my site visit next week.
washworks.bid
Several buildings are shown with a height of zero. These buildings are not shown in the microstation file that we extracted the heights from. This may be because they are not buildings, but may be truck spots or tank dikes, or other structures. Next week when I am on-site I plan to verify in the field that we have all the necessary buildings in the model, that their heights are correct, and take out the "buildings" that really aren't buildings.
Debbie
Debbie Mulrooney
Consulting Engineer DuPont Engineering Technology (DuET) Environmental Engineering Brandywine 9430/ Voice: 302-774-8083 / Fax: 302-773-1202
debbie.j.mulrooney@usa.duponLcom
DuPont Engineering Technology : Rnd the right consultant:
http://engineering.dupont.co[n/env_engg/ ht.tp://engineering.dupont.com/resources/techdir.htni
EID420099