abBaATEMENT Technologies Dear Industrial Hygiene Professional: As you know, one of the major uses of asbestos-containing materials prior to 1975 was for pipe and boiler insulation. Although these products are effective insulators, they have now aged and deteriorated, creating a potential for employee exposure to friable asbestos. Professionals, like yourself, must now consider the expensive and potentially hazardous job of replacing these unsafe materials. UTILITIES, REFINERIES, CHEMICAL COMPANIES, GOVERNMENT AGENCIES, MILITARY FACILITIES, HOSPITALS, SCHOOLS, CONSULTANTS, AND GENERAL INDUSTRY HAVE ALL CHOSEN SAFE-T-STRIP HIGH CAPACITY GLOVE BAG SYSTEMS FOR REMOVAL OF FRIABLE ASBESTOS-CONTAINING MATERIALS FROM PIPES. WHY? SAVINGS OF 50% OR MORE Recent user studies show that by using Safe-T-Strip you can typically cut your cost per linear foot of insulation removed by 25% to 50% compared to low capacity polyethylene glove bags and cut costs by over 50% compared to total work area enclosure methods. Safe-T-Strip is designed for high capacity use (up to 400 lb. of material) and can be safely moved along the pipe. As a result, one Safe-T-Strip bag has the same capacity as up to 10-12 single use polyethylene glove bags! LOWEST FIBER COUNTS On the job sampling has consistently shown that ease of use, outstand ing construction features and high-quality materials of Safe-T-Strip result in far lower fiber counts than those encountered with standard polyethylene glove bags. In addition, Safe-T-Strip is also far more resistant to tearing, punctures, and seam failure. WON'T DISRUPT THE WORKPLACE Total work area enclosure usually requires that work activities cease in the areas surrounding the removal work. Safe-T-Strip encloses only the immediate work area and allows you to continue these activities virtually uninterrupted. WIDE RANGE OF USES Competitive products are typically limited to use on straight, horizon tal pipes of 10" diameter or less and cannot be used on tees or valves. With Safe-T-Strip you can safely handle virtually any size or configura tion of pipe. (over, please) RO. Box 930416 Norcross, Georgia 30093 UCC 006352 (404)934-5115 EASE OF USE Your workers or outside contractors are easily trained in the safe, efficient use of Safe-T-Strip. A 34-minute training video is avail able at our cost of $50.00 to assist your training. Why use more expensive and less safe methods for removal of asbestoscontaining materials from pipes and boilers? Take these steps today ... (1) Look over the enclosed brochure to find out how your company can benefit from Safe-T-Strip, and (2) Call our customer service department at 404-934-5115 today or write for additional information. Ask for the name of the Safe-T-Strip distributor-in your area. Please take advantage of our special Trial Order Offer. P.S. Send in the enclosed reply card to order a training video or to have our representative contact you for a Safe-T-Strip demonstration. UCC 006353 M HOW TO U5 bAhfi'a i-m- mm SYSTEMS UCC 006354 SAF6-I-5THIF ' ' Hazards of Asbestos Insulation Government ogenctes and the pn. vote sector now recognize there are hazards connected to the inhalation of asbestos fibres. Persons exposed to asbestos have bri" indeased ri$k of developing .Jung cancer, asbestasis . and mesothelioma. Although thpuse of friabl^asbestos containing^ materials has virtually been elimyjptedin new constructtgn, many existing buikjin& fStates, power stations and petrochemiobl irv stallations ..contain these: materials. Asbestos was used for Phany of the following applicaticjgB:[S|jir(3yed.-fire(Droofing on columns;',,decks and beams, sprayed thermal and acoustic insulation and pipe and boiler insula tion. Pipe and boiler insulation ap plied prior to 1975 frequently contain :; j ed friable asbestos. This material is vr now of an pge that it reqpiies mairv ! - tenance or replacement.^ s * Health hazgfds to emplaypps, strin gent government regulations and the ` liability to employers have prompted ` '' many owners. to remove asbestos w." ..containing pipe insulation from their buildings and installations. The Safe-T-Strip system hgs been - developed to provide on effective, economical solution for the removal of hazardous, pipe insulation, during maintenance programs and removal projects, without significant dlsruption of the surrounding wort area. oases the Safe-T-Strip expansion strip Each Safe-T-Strip gloye bag is can be added to increase the sleeve individually inspected and date size or two Safe-T-Strip bags can be stamped to meet the stringent re zipped together. To facilitate main quirements of our quality control. tenance requirement? or removal of short lengths of pipe Safe-T-Strip's Economy , . .. unique interior zip-lock channel .. The ease of use of Safe-T-Strip make it system is available. This affbws the the most economical glove bag aval I- removal of the bog from the pipe to able on the market. Safe-T-Strip can another location with the con i>e easily and rapidly fastened on a taminated material and tools in the -.pipe by a single worker. Bogs which lower portion of bag. ojjnust be cut, stapled and taped usuah The versatility of the Safe-T-Strip Jy require two workers. Safe-T-Strip system allows its use on any piping can be quickly moved along a pi pe by diameter, eliminating the need for,, one worker until the bag Is titled to disruptive full enclosure methods. capacity. The method of fastening on Dependability the pipe (shoulder strop cmd double throw zipper) and the strength of the Safe-T-Strip is manufactured entirely product facilitate this movement. of heavy gauge PVC with a PVC im Safe-T-Strip is not limited to removing pregnated zipper. All seams are theinitial 3or4feetof pipe insolation welded, using ultrasonic techniques . per bag, but can contain a manage for maximum weld strength. Seams able capacity which may be as much of different materials, whether weld as 39 feet of pipe insulation. (See ed, glued or stitched, can fail, re average capacity chart.) The ease of sulting in contamination of the sur use of Safe-T-Strip allows it to be used rounding environment, defeating the in remote locations. purpose of the glove bag. _ In addition to the obvious savings on The pre-shaped shoulder design allows for an effective seal with the pipe when used with the Safe-T-Strip shoulder straps. Without this shoulder design, straps do not give an ade quate seal. No holes need be cut into Safe-T-Strip labour, the progressive movement of Safe-T-Strip alonig-^the pipe, ac cumulating-in the bottom section a high capacity of waste material, yields supplementary savings on glove bags, disposal bags and ac cessory equipment. during use as the elasticized valve can be used for the water sprayer noz zle and a HEPA nozzle if required. SAFE'T-STRIP* Systenj Versatility . The Safe-T-Strip system consists of glove bags and accessories, deve loped, manufactured and inspected hr provide the highest standards available for ihe removal of hazard ous pipe insulation. The system was developed for insula tion removal from horizontal and ver tical piping as well as specialty areas such as valves and tee joints. All styles of Safe-T-Strip glove bogs are manufactured in three sizes, 6* (15cm), 10" (25 cm) and 14* {36 cm). Custom sizes are available on re quest. This range allows the tg^irv tenance worker or contractor to'handle most piping systems. In un,usual TEE-SAFE-T-STRtP UCC 006355 TABLE OF AVERAGE CAPACITY O/O of Insulation Safe-T-Strip Size Average Capacity Lin. Feet 2" Horizontal 2" Vertical 4' Horizontal 4" Vertical 6" Horizontal 6" Vertical 8' Horizontal 8" Vertical 10" Horizontal 10' Vertical 12' Horizontal 12" Vertical 14" Horizontal 14' Vertical 16" Horizontal 16" Vertical `with extension odded 6" Horizontal 6" Vertical 6" Horizontal 6' Vertical 6" Horizontal 6" Vertical 10' Horizontal 10" Vertical , 10" Horizontal 10" Vertical 14' Horizontal 14" Vertical 14" Horizontal 14" Vertical * 14" Horizontal * 14" Vertical 39 24 34 17 29 15 18 11 16 9 14 7 12 7 10 7 Average capacity depends on these conditions: 1. Condition of insulation. 2. Operator or worker's ability to arrange insulation sections in bag. 3. Types of jacketing - i.e., aluminum, canvas, etc. Capacities based on non zip-lock bog on a continuous removal project. Actual results depend on conditions at the time of use. 0.0. = Actual 0.0. of Pipe + (2 x Insulation Thickness) T = 3.14 Circumference ~ 0.0. x x N.P.S. Vi % 1 1 Vi V/i 2 7'h 3 3Vi 4 4Vi 5 6 7 8 9 10 11 12 14 16 18 20 24 30 O.O. of Pipe .84 1.05 1 32 1.66 1.90 2.38 2.88 3 50 4.00 4.50 5.00 5.56 6.63 7.63 6.63 9.63 10.75 11.75 12.75 14.00 16.00 18.00 20.00 24.00 30.00 Examples: Problem 1 - 3" x 1 Vi' Line insulated with asbestos insulation a) Actual O.D. of Pipe (See chart) = 3.50" b) Plus Insulation 2 x 1 Vi" = 3.00" c) Total O.D. of Insulation -- 6.50" d) Circumference = 6.50* x 3.14= 20.41" Solution: A 6" Safe-T-Strip Bag has an outside circumference of 22' and would be the recommended bag to use. Problem 2 - 20" x 2Vi" Line Insulated with Asbestos Insulation a) Actual O.D. of Pipe (See Chart) = 20" b) Plus Insulation 2 x 21/2* = 5" c) Total O.D. of Insulation = 25" d) Grcumference = 25' x 3.14 = 78.5" Solution: There are several options with Safe-T-Strip. a) 1-10" Safe-T-Strip (36' Grcumference) + 1 - 14" m Safe-T-Strip (49" Circumference) = Total Grcumference 85 b) 2-14" Safe-T-Strip (49" Grcumference) = 98" Total Grcumference - Larger waste capacity than Solution 'A' c) 1-14" Bag (49" Circumference) 4-1 - 26' Extension +1-6" Extension = Total 81' Grcumference Safe-T-Strip Table: Size 6' Grcumference 18.84' 10' 31.4" 14" 43.96' Safe-T-Strip Circumference 22' 36' . 49" Actual Safe-T-Strip O.D. 7.0' 11.4" 15.5" Marketed Exclusively in the United States by: Abatement Technologies, Inc. P.O. Box 930416 Norcross, GA 30093 (404) 934-5115 (Safe-T-Strip is o product of Asbeguwd Equipment Inc., Canada) Distributed by: UCC 006356 j High strength zipper for ease of fastening by one worker THE STRENGTHS OF THE SAFE-T-STRIP SYSTEM Double pull zipper for easy movement post hangers Plastic flap under zipper for strength on pipe and effective Pre-shaped shoulder design vital for effective seal to * Anti-slip buckle * on high-strength * woven nylon shoulder slrop Elosticized volve for woler sproyer. Con also be used for HEPA vacuum Ot completion if required. Three finger (welder- style) glove for ease of use. Glove of heavy gauge PVC continuously welded for mart imum slrenglh and compatibility with bog. ifil Bag constructed of heavy gouge window clear PVC for strength and puncture resistance. Side entry tool pouch with bui in water drain. Safe-T-Sthp lab gives day of manufacture for quality control Optional zip-lo (to allow material to be sealed in bottc of bag for movement off pipe). All ultrasonic welds at sides, gloves, valve and zipper. No weak stitching or heat seals, No bottom seam or weld. Volume of water demonstrates quality ond strength of standard Safe-T-Slrip. UCC 006357 TABLE OF AVERAGE CAPACITY O/D of Insulation Safe-T-Strip Size Average Capacity Lin. Feet 2" Horizontal 2" Vertical 4" Horizontal 4" Vertical 6" Horizontal 6" Vertical 8" Horizontal 8" Vertical 10" Horizontal 10" Vertical 12" Horizontal 12" Vertical 14" Horizontal 14" Vertical 16" Horizontal 16" Vertical *wHti extension added 6" Horizontal 6" Vertical ' 6" Horizontal ^ 6" Vertical 6" Horizontal 6" Vertical 10" Horizontal 10" Vertical 10" Horizontal 10" Vertical 14" Horizontal 14" Vertical 14" Horizontal 14" Vertical *14" Horizontal * 14" Vertical 39 24 34 17 29 15 18 11 16 9 14 7 12 7 10 7 Average capacity depends on these conditions: 1. Condition of insulation. 2. Operator or worker's ability to arrange insulation sections in bag. 3. Types of jacketing - i.e., aluminum, canvas, etc Capacities based on non zip-lock bag on a continuous removal project. Aclual results depend on conditions ot the time of use. O.D. = Actual O.D. of Pipe + (2 x Insulation Thickness) x = 3.14 Circumference = O.D. x x N.P.S. Vi Vi 1 VA m 2 2'/i 3 3Vj 4 A'h 5 6 7 e 9 10 n 12 14 16 18 20 24 30 O.O, of Pipe .84 1.05 1.32 1.66 1.90 2.38 2.88 3.50 4.00 4.50 5.00 5.56 6.63 7.63 8.63 9.63 10.75 11.75 12.75 14.00 16.00 18.00 20.00 24.00 30.00 Examples: Problem 1 - 3" x 116" Line insulated with asbestos insulation a) Actual O.D.ofPipe (See chart} = 3.50' b) Plus Insulation 2 x 116* -- 3.00" c) Total O.D. of Insulation = 6.50" d) Circumference = 6.50" x3.14 = 20.41" Solution: A 6" Safe-T-Strip Bag has an outside circumference of 22' and would be the recommended bag to use. Problem 2 - 20" x 216" Line Insulated with Asbestos Insulalion a) Actual O.D. of Pipe (See Chart) = 20' b) Plus Insulation 2x216' -- 5" c) Total O.D. of Insulation = 25" d) Circumference = 25" x 3.14 = 78.5" Solution: There are several options with Safe-T-Strip. a) 1-10" Safe-T-Strip (36' Circumference) +1-14' Safe-T-Strip (49" Circumference) = Total Grcumference 85". b) 2 - 14" Safe-T-Strip(49' Grcumference) = 98" Total Grcumference - Larger waste capacity than Solution 'A' c) 1-14' Bag (49" Circumference) + 1 - 26" Extension + 1-6" Extension = Total 81' Grcumference Safe-T-Strip Table: Size Grcumference 6" 18.84" 10" 31.4" 14" 43.96" Safe-T-Strip Grcumference 22" 36" 49" Actual Safe-T-Strip O.D. 7.0" . 11.4" 15.5" Marketed Exclusively in the United States by: Abatement Technologies, Inc. P.O. Box 930416 * Norcross. GA 30093 (404)934-5115 Distributed by: (Safe-T-StrifA is a product of Asbeguafd Equipment Inc. Canada) ' UCC 006358 HORIZONTAL 6H - 6' Horizontal 10H - 10' Horizontal 14H - 14' Horizontal SHOULDER STRAPS 30SS - 30' Shoulder Straps 60SS - 60' Shoulder Straps 6V - 6" Vertical 10V- 10' Vertical 14V- 14' Vertical HORIZONTAL-Z1PLOCK 6HZ - 6' Horizontal c/w ziplock 10HZ - 10' Horizontal c/w ziplock MHZ - 14' Horizontal c/w ziplock 16FS - 16' Rexisaw 20FS - 20' Rexisaw 24FS - 24' Rexisaw 6VZ - 6' Vertical c/w ziplock 10VZ - 10" Vertical c/w ziplock 14VZ - 14' Vertical c/w ziplock 6VIZ - 6" Valve c/w ziplock 10VLZ - 10' Valve c/w ziplock 14VLZ - 14' Valve c/w ziplock EXPANSION STRIP 0640EX - 6'X40` Expansion Strip (Tea Bogs only; 2 required) 0654EX- 6'X54` Expansion Strip 1354EX - 13'X54` Expansion Strip 2654EX - 26'X54* Expansion Strip 6TZ - 6' Tee c/w ziplock 10TZ - 10' Tee c/w ziplock 14TZ - 14" Tee c/w ziplock UCC 006359 ASBESTOS-CONTAINING PIPE INSULATION REMOVAL MATERIAL PURCHASE SPECIFICATION PVC Glove Bag: prefabricated, 0.25 mm (10 mil) minimum thickness, poly-vinylchloride bag with integral 0.25 mm (10 mil) thick poly-vinyl-chioride gloves and elasticized valve/port. Bag equipped with reversible double-pull double-throw zipper on top to facilitate installation on pipe and progressive movement along pipe and with straps for sealing ends of bag around pipe. ASBESTOS-CONTAINING PIPE INSULATION REMOVAL GLOVE BAG SPECIFICATION 1, Scope of Work 2. Regulatory Agencies 3. Material and Equipment 1.1 Remove entire asbestos containing pipe insulation as specified. 1.2 Where exposed ends of pipe insulation remain, seal exposed end with an approved encapsulant, tape or other appropriate means. 1.3 Seal all surfaces of piping, from which asbestos-containing pipe insulation has been removed, with an encapsulant suitable for system (type of pipe). 2.1 Comply with Federal, State or Provincial and Local requirements for asbestos abate ment. In any case of conflict among these requirements or with this specification the more stringent requirements or specifications shall apply. 3.1 PVC Glove Bag: prefabricated, 0.25 mm (10 mil) minimum thickness, poly-vinylchloride bag with integral 0.25 mm (10 mil) thick poty-vinyl-chloride gloves and elasticized valve/port. Bag equipped with reversible double-pul! double-through zip per on top to facilitate installation on pipe and progressive movement along pipe. All glove bags, disposal bags, tape and any other disposable material shall be new, uncontaminated and in same condition as purchased from manufacturer. All equip ment must be clean, uncontaminated and in good working order. 3.2 .Securing Device: reusable nylon straps at least 1' wide with metal tightening buckle for sealing ends of bags around pipe and/or insulation. 3.3 Sprayers: garden reservoir type, low velocity, capable of producing mist or fine spray. 3.4 Waste disposal bags: 0.15 mm (6 mil) minimum thickness polyethylene. Labelled as follows: "Contains Asbestos, Cancer Hazard, Avoid Breathing Dust", or equivalent wording, 3.5 Tape: self-adhering with sufficient strength for sealing ends of exposed insulation. (3 inch fiberglass reinforced duct tape is recommended.) 3.6 H.E.PA Vacuum: (High Efficiency Particulate Absolute) filtered vacuum equipment with a filter system capable of collecting and retaining asbestos fibres at 99.97% efficiency for fibres 0.3 microns or larger. 3.7 Equipment: tools to safely carry out pipe insulation removal (i.e., retractable utility knife, flexisaw, snipes, rags, scrubbing pad, etc.) 3.8 Encapsulant: water based latex sealer or latex paint. 3.9 Amended Water water containing a surfactant. UCC 006360 4. Preparation 5. Removal i 6. Disposal 4.1 Instruct workers on necessary safety procedures and protective measures. Instruct, in correct use of the glove bag and ensure their comprehension and ability to safely, use same. 4.2 Instruct workers on necessary personal protective equipment as required by job specification or local, state or provincial and federal regulations. 4.3 Arrange all waste disposal as required by applicable regulatory bodyftes). 5.1 Have each worker fit and check respirator and personal protective equipment as specified. 5.2 Place any tools necessary to remove insulation in bottom of bag. Zip the bag onto the pipe and seal alt openings to the pipe with the nylon straps. For valve bags seal valve cover with tape or equivalent. . 5.3 Insert nozzle of spray pump (pre-filled and primed with water and surfactant mixture) into bag through valve. Place hands in gloves and place necessary tools to remove insulation in tool pouch. 5.4 Cut or remove exterior insulation covering where applicable to expose asbestos pipe covering. Wet exposed pipe covering with sufficient mixture to suppress any dust. Remove insulation and arrange in bottom of bag to obtain maximum capacity of bag. Wash down exposed portion of pipe and top section of bag ensuring that any expos ed end of asbestos insulation is thoroughly surface saturated as well as insulation in lower portion of bag. Use one hand and a cloth or sponge to aid in washing process. 5.5 If bag is to be removed from pipe for use on new section of pipe seal two or three , channels of zip-lock from outside of bag. (Note: trying to close all four channels of zip-lock together is difficult.) Re-install in new location before opening zip-lock. 5.6 If bag is to be moved along pipe, move bag, re-seal to pipe with straps and using double-pull zipper to pass hangers. Repeat stripping operation. 5.7 To remove bag after completion of stripping, wash top section and tools thoroughly. Put all tools in one hand (glove), pull hand out inverted, twist to create a separate pouch, double tape to seal. Out between the tape and place in next glove bag or into a water bucket, open pouch under water and clean and then allow to dry. 5.8 While glove bag is still on pipe but after tools have been removed, an appropriately labelled waste disposal bag is slipped up and over the glove bag. The glove bag's straps and zippers are opened and the glove bag opening carefully folded over and lowered into the waste disposal bag. Disposal bag is then sealed with tape or tie strap (not wire), to minimize bags being punctured in transit to disposal site). 5.9 After removal of bag ensure pipe is clean of all residue. If necessary after removal of each section of asbestos, vacuum all surfaces of pipe, using H.E.P.A. Filtered Vacuum equipment. If H.E.PA Vacuum equipment is not available, use cloths, mops or sponges, dampened with water. Ensure that surfaces are kept free of wet sludge which after drying could release asbestos fibres into the atmosphere. Do not use vacuum equipment other than H.E.PA equipment with high efficiency filters. 5.10 Seal all surfaces of pipe with suitable sealer to seal any residual fibres. Cover expos ed ends of remaining asbestos insulation with tape. 5.11 After removal of pipe covering vacuum all surfaces of work area including reusable tools and equipment used to perform the work. 5.12 Have each worker remove and dispose of personal clothing and respiratory equip ment as specified. 5.13 Welds and folds of glove bags are to remain intact without modification to manufac turers design. 5.14 Glove bags, disposal bags, cloth rags and any porous materials are to be considered hazardous after use and handled according to disposal sub-section. 6.1 Deliver and deposit waste in accordance with regulations set by applicable environmental regulatory authorities. UCC 006361