Document dQBxn21My8Zzm3VkK70Dob

ODHBBOHBDODD PROGRESS REPORT JOB NUMBER PROCESS ENGINEERING DEPARTMENT ORGANIC CHEMICALS DIVISION OPEA 1430 REPORT NUMBER 1 T5TTT RS ORGANIC DIVISION Cieve Coeur ORGANIC RESEARCH 2nd Stieet g*p-t-p>m'hAT 9Q 1 Qfifi CENTRAL ENGINEERING DEPARTMENT .MAHONEY minckler KLEIN SODEN PELLINSER . HOSIER OURLAND DANNA Cresce C. Carder 0. Hehner 1 1 C. e. ANAONOSTOPOULOS 1 | O. DE OARMO f3F| H. L. HUBBARD BL. C. Fuhrmeister ipr.dr.i E3J. R. Savage ,TPM> (MKT) (DEV) Eg. L. Judy BR. E. Lischer a a `Tsc" " e- WRIOHT | | R. E. HOWARD M. P LUX J. P NEPP R. P STEVENS [] CED CENTRAL PILE (2) . * To Rtctivt Details Section title. AROCLOR QUALITY IMPROVEMENT personnel. D. A. Snyder (L. L. Fellinger) problem. l. Summarize project background. 2. Determine capital requirements for expansion and upgrading of WGK Aroclor facilities. 3. Present recommendation for future action. summary. 0 - 14*2 New specifications for electrical grade Aroclor were proposed at the divisional Aroclor meeting of March 10, 1966. WGK PR &' D has proposed that KOH washing and fractional distillation be added to the existing process to meet the revised specifications. This proposal could also apply to the Anniston Aroclor plant. Capital requirements for this proposal were determined as follows: Straight Takeover Distillation Additional capital for fractionation KOH washing of crude Earth treatment Tank farm 250,000 125,000 170,000 295,000 400,000 1,240,000 These figures are for a 50M lb/yr Aroclor plant. No capital is provided for changes in the chlorination area. Both engineering and contingencies are included as 15% of installed equipment cost. Definition of the process proposal is not complete enough for preparation of a detailed engineering scope. Organic Process Engineering will continue to follow plant quality efforts in anticipation of future expansion. DSW 181504 STLCOPCB4050770 Job No. 0PEA-1430 Report No. 1 September 29, 1966 Page 2 DETAILS; General Background Chlorinated biphenyl (Aroclor) has long been a successful product for Monsanto. Monsanto Company is the sole Aroclor producer in thp United States. Current annual sales are_approximately 64M lbs. Monsanto Chemicals Ltd. produces 7M lbs. annually and is well established in the United Kingdom. Monsanto accounts for about 75% of the world Aroclor market. The remainder is shared by five other producers. Quality Maintenance of product quality is necessary to protect Monsanto's enviable marketing position. About half of Monsanto's production is used as a dielectric fluid in trans formers and capacitors. This material must pass rigid speci fications. Important quality considerations for electrical grade material are resistivity, power factor, water content, and stability. In each of these catagories Monsanto Aroclor compares poorly with that produced by foreign manufacturers, notably Prodelac (France) and Bayer (Germany). Monsanto is having difficulty competing with the electrical grade foreign material in non-domestic markets. Monsanto's American customers are either unaware of the quality compar ison or are unwilling to change from an established supplier. Whatever the reasons are, there appears to be an as yet unrecognized incentive for other companies to get into the American Aroclor business. Revised electrical-grade specifications were established at the March divisional Aroclor meeting to meet the challenge of foreign competition and to protect existing markets. These quality goals call for material equal to or better (for resistivity, power factor, and stability) than that produced by the present competition. Capacity The standard capacity of the WGK Aroclor plant (Dept. 246) is 28.8M lb/yr. Anniston's standard capacity is 48M lb/yr. The potential capacity of Dept. 246 with existing equipment has been determined to be 36M lb/yr. Potential capacity at Anniston is now being determined. DSW 181505 STLCOPCB4050771 Job No. 0PEA-1430 Report No. 1 September 29, 1966 Page 3 The sales forecast, Fig. 1, indicates that WGK will be out of capacity in 1967. If the existing potential is used, the "pinch" won't occur until 1969. In this event some of the WGK sales could probably be shifted to Anniston since it is predicted that they will have approximately 5M lb. or more excess proven capacity in 1969. However, in the 1970's max imum total production capacity of both locations will be realized. Also, as part of the strategy adopted at the divisional Aroclor meeting, it was proposed that Monsanto should maintain a production capability at least 25% higher than annual sales. This relationship existed in 1965 but obviously cannot con tinue to be satisfied with the present production facilities. Process Proposals Plant personnel at both Anniston and WGK proceeded to deter mine methods of attaining the new quality goals at the con clusion of the divisional Aroclor meeting. Anniston has devoted most of its efforts to improving the earth treating area of the existing process. WGK has been studying the possibilities of KOH treatment of crude Aroclor followed by batch fractionation. Evaluation of Process Revision Flowsheets and equipment lists were prepared for the process revision proposed by WGK (WGK PR & D Report No. K177, 7-16-66). A capacity of 50M lb/yr. was chosen as a design basis. This would satisfy the 25% excess criteria until 1970. Excess capacity would be completely used by mid-1970's. If engineer ing were started now, start-up for a new facility would be early 1968. Equipment requirements were determined for all process areas except biphenyl storage and the chlorinators. Additional biphenyl storage is to be included in a project scope for WGK storage facilities being prepared by ODPED. Sufficient capac ity from the present chlorinators can most likely be obtained by increasing the chlorine supply and removing the catalyst baskets. KOH treatment tank, still feed tank, stillpot, column, receivers and earth treating facilities were sized by assuming an 8 hr. batch time cycle. An addition of 165,000 gal. of storage was determined by requirements for a minimum product inventory. DSW 181506 STLCOPCB4050772 lAR. STLCOPCB4050773 Job No. OPEA-1430 Report No. 1 September 29, 1966 Page 5 Total project cost was determined by CED to be 1-1/4M dollars (CE Estimate No. 03-053). This was estimated by developing equipment costs and factoring by various catagories of equipment. Engineering and contingencies were each estimated at 15% of installed equipment cost. Capital cost of various process areas were determined as follows: Single Stage Batch Distillation $ 250,000 Additional Capital for Fractionation 125.000 KOH Washing of Crude 170.000 New Earth Treatment Facilities 295.000 Tank Farm 165,000 Gal. 400.000 Total-Project NFC $1,240,000 This estimate can be extended to capacities other than 50M lb/yr. by multiplying by capacity ratio taken to .6 power. Future Work Research Work Several important aspects must be considered before KOH treat ment is added to the Aroclor process: 1. Explosion hazard - can there be an absolute guarantee that KOH will not build up to explosive levels in the stillpot? 2. Capital requirements - the KOH treatment tank must be nickel. CED estimates that $170,000 capital (for 50M lb/yr) is required for. adding KOH.treatment to process. Does the incremental improvement of stabilities justify this investment? Also, what is the risk for the investment when the statistical scatter of analysis is considered? The advantages of fractionating crude Aroclor to obtain product quality are obvious. However, there are several unknowns that could offset the quality improvement: 1. Disposition of fore and tail cuts How will the various cuts for each aroclor be used? To what extent will blending be required? This will determine the overall yield and the capital required for storage and blending facilities. 2. Increased complexity of operation Day to day operation could become unwieldy. The five liquid Aroclors being made at DSW 181508 STLCOPCB4050774 Job No. 0PEA-1430 Report No. 1 September 29, 1966 Page 6 WGK will each have a tailcut and forecut. The possible combinations of what to do with all of the cuts are numerous. Production planning would be tedious unless some simplified procedure can be found. Plant Work Plant TSD and research groups are working on areas that show much promise for quality and capacity improvement in the existing process: 1. Earth treatment - Anniston has demonstrated that Porocel! earth and fixed-bed treatment can improve both resistivity and thermochemical stabilities. Results from both plant and laboratory tests have been encouraging. 2. Piping - Both Anniston and WGK are planning to minimize iron contamination by changing from steel to aluminum piping. 3. Nitrogen blanketing - Anniston is preparing a scope for this work. WGK already has nitrogen blanketing. 4. Process fundamentals - The effect of process variables upon quality is not well defined. Such work is essential to establish a firm design basis for new facilities. Anniston has a long-range plan that outlines such a study. 5. Debottlenecking - Ultimate capacity of present WGK facility has been determined. Anniston is working on deter mining their capacity. Recommendations Preparation of an engineering scope for the proposal of KOH washing and fractionation is at this time premature. However, Organic Process Engineering will follow plant and research efforts closely in anticipation of a management decision on new facilities. DSW 181509 STLCOPCB4050775 CHANGE <y AMOUNT Of A PROJECT AUtEADY LISTED (M3-K) 1. Title: EXPAND THE CAPACITY CT THE ABOCLOR DEPARTMENT AT v.a. orkhawrich and improve the quality the electrical GRADE PRODUCT - BO CHANGE FROM LAST LISTING. 2. Amount of Project: 1750,000 - An increase fro the original project of *495,000. 3. Description: This project contemplates Increasing the capacity of the department from 2S? lb./yr* to 3 lbs./yr. by the installation of a distillation system, facilities to improve the electrical properties of Aroclor and finished goods storage. Improved quality on electrical properties is required to maintain and increase sales in several countries where our competition is Bayer and Progil. 4. Estimated Return on Investment: 13* (formerly 15*) 5. Request to be Submitted: Third Quarter 1966 - (no change from last listing). 6. Timing of Expenditures 1 1st Quarter l$6j 2nd Quarter 1967 3rd Quarter 1967 4th Quarter 1967 Revised *150,000 250,00 350,000 -- Last Listing m *100,000 300,000 95,000 DS\N 181510 STLCOPCB4050776