Document dQBNKwJ48353a6oxxmozYanE9
FILE NAME: Allied Signal Bendix (ASB) DATE: 1966 Apr 14 DOC#: ASB208 DOCUMENT DESCRIPTION: Plant Visit Report
D .H :C .0 .Id .
TEL: 1-519-973-1906
Occupational Health Clinic for Ontario Workers/Windsor 547 Victoria Avenue Windsor, Ontario N9A 4N1 (519) 973*4800
FAX TRANSM ISSION SHEET
Jan 06'93 10:13 No .001 P.01
FAX 973-1906
d ate:
A t
NUMBER OF PAGES fly CLUDING TH IS COVER SHEET): U
IF YOU DO NOT RECEIVE THE COMPLETE NUMBER OF PAGES, CALL 973*4800. MESSAGE;
\<r.f a . &. cjL -euJ
tmorindua toi
^
Dr* A* It lu()i*rltnd|
Director
TEL: 1-519-973-1906
Jan 0 6 '93
W DEPARTMENT OP HEALTH - INDUSTRIAL HYGIENE BRANCH -
Plint Visit Report
'
10:13 No.001 P.02
`
Datet April 14, IMA Fromi H.M. kelson
Unt i ddrssst
Bendlx-Eclipse of Cuadi Uiitti0 MS Prince Rood, Windsor, Ont,
la. Bmployaaat
M. Total
loMrdt Aabeatos duet
\
......... --
oopany to bo not^lod byt V ;
Tint forward* ; Toko no'tottorn
.
Dr. EV Mastromatt o f
tot Ml% ik N#li0n (2)
Nr* D.B. Mooro
Raqusatad byi
Accompanlad byt Hr, A.H. Mabel, X.B.B. ; Mr. 0. Blackwell, I,*.*.
Bote of Viaitt M^rch 23, 1966.
Contacts i _ v. ;
Mr. E.A. Clifton,f Superintendent.
Mr. Q. Spence ^ J- pyh
' (KDOSbTRIALlYttENEIUKUI ." 'id.ir
APR 15 1*66
ROOM 6406 - CAST BLOCK
?i*,.. ' ;
i
The abore Mentioned company manufactures automobile brake assemblies.
This includes mounting of brake lining to brake shoes, requiring grinding or sanding of the lining. If the linings are riretted to the shoot then drilling of the lining is also required*
The drilling and grinding is carried out in a room about 75 ft x
.
50 ft x 30 ft. There are three large grinding vheela about 24 in. diameter
and one about 16 In. diameter in operation. Each of these units are connected
to a separate exhiust system handling about 2,000 cfa with capture velocities '
$
ranging from 200-1,600 fpm. The exhaust system for the amall wheel was also .
connected to two drilling operations, but apparently these vert not considered '.
necessary and had been blanked off. Each exhaust system was connected to its
own bag collector located in the room with the discharge air directed to the .' .
outside.
.
The filter bags are shaken about four times a shift by hand. Mills
h tthhiescoilslbeecitnogr daonndstetnhdesftaonssaertetlechouuttofonf haonpdpceornssiadnedroatbhloerduesqtu;iepsmoeanptesinftrhoem ;
room, tfeployess Save expressed concern over the dust in the room.
.N %
pommyfll
1. The exhaust systems seem adequate. During operations the air was clear with vary llttla observable duet, What duet waa visible appeared to
be that regenerated from settled dust.
vV'o#.
O.H.C.O.U.
T E L =1-519-973-1906
a-
Jan 0 6 '93 10=14 No.001 r .03
2.
Housekeeping it onlj fair with no attempt to keep dutt collect#** "
and machine* fre of nettled duet*
t
3. Bag shaking in done during break periods so that onlgr the main*
tenance operator is in the room The operator dots not wear a respirator
for the job* The man shaking the bags during the visit, had a badly marked ;
* face such that a respirator could not be effectively fitt ed to hi.m*
..*
4 When the eollector hopper is filled with dust, it is removed from
the unit for disposalcf the dust, and an empty hoppor put in place
Apparently this happens not mere than once a week.
`
* .
5 Mo xray* of exposed persons are done by our unit*
*. ;
. ,* *.
Power brake assemblies are vapour degreased using methylene chloride /.v.'
in the degreaser They immediately go to an automatic spray paint booth and
are given a black finish Total openings of the booth aro 18 sq ft with
average faeo voleelty of 200 fpn for 3,600 efm total exhaust. Three spray
guns are used in the booth. One is pointed in such a way that considerable \-
spray escape* fro the entrance side of the booth*
.
In another location platee for mounting brake assemblies are fitted
with mounting lugs and pressure welded using induction heating. Up to four
welding units art used. The plates then pass to a trichloroethylene degreaser, .
a paint dip tank and to a bake oven. The line is U-shaped with the degreater,
paint dip and ovei on one side and the welding units on the other side* thus '
the degreaser Is only about 5 or 6 feet from the nearest welding unit and not
more than about IS ft from the furthest. The degreasing unit is "heme made",
fairly efficient, but deteriorating badly* It is not provided with local
-
exhaust, Tbe paint dip tank and oven are effectively exhausted*
. '
;.
* ..*-*.:-
,
' *
Comnents
1. ' The first degreaser unit should present no health hastrd. The solvent
boils at a low temperature so that degreasing should be fast and vapours more
easily controlled than with trichloroethylene. The vapours are less toxic
than trichloroethylene, and there is good general ventilation provided by the -V.y
paint spray booth.
K-*
2,
The second degreaser unit discussed would aeoi to present a definite
hatard. The vapour section is badly corroded eking it liable to leakage of
vapours* There In a possibility of phosgene being formed because of the
nearness of heat oouroos, ^
.. . >-
.
. *
/*
O.W.
TEL: 1-519-973-1906
Jan 0 6 '93 10:15 No.001 P.04
-3-
'
Directions to bo Issued
/
1 Collector bags in the brake lining shop shall be shaken with only ' ; '
.the maintenance operator present*
.
2,
The operator shall wear a suitable approved respirator for shaking
ths bags*
'
a, .
s>%
3.
Housekeeping shall be improved in the brake lining shop* All
settled dust shall be removed by vacuuming or wet leaning No dry sweeping
shall be permitted*
,
4* The vapour degreaser at the brake plete assembly line nhell be put in a suitable state of repair or replaced with an acceptable unit*
-T'V 5, The vapour' degreaser hall be located at least 50 ft fVom a hot
operation or fitted with an adequate local exhaust system to remove any solventV.
vapours escaping from the dtgrcastr or evaporating from parts leaving ths
dogreaser*
.
N .
'
: .? m
Kccomwendn t ions
.
1* Operators working with asbestos should bs pieced under medicel super*
vision* including periodic x-rays by the Industrial Hygiene Branch*
'
Occupational Chest Unit*
2. Where the respirator is directed above* it saist be considered that not
all people can be fitted with a respirator* I would put the operator on the
day of the visit in this category*
..
3*
An alternative to vapour degreasing* such as caustic cleaning* would beV
preferable* If it were employed then directions 4 and 5 could be disregarded* .
4* Some baffling should he provided to prevent the escape of paint spray "73 from the power bribe spray booth* .