Document dQ8mnyq55wg2rO3e5z1XpxEL5

ENGINEERING RETORT PROJECT NO. 734? S1AB MILL MODIFICATIONS M1DDI.ETOWN WORKS Volume I March 15, 1965 KAISER ENGINEERS, INC. Report. No. 7147-3 BIG RED AKE-004288 I 1 [ I I I m m is BIG RED 2.0 FACILITY DESCRIPTION The new slab mill modifications, as shown on drawing PR-3297-963, combined with the present facilities will provide a primary mill installation employing the "cold slab practice*' and consist of the following: 2.1 Soaking Pits (Existing) The pits are located centrally in the building, forming a "T" with the slab mill roller table line. Ingots are heated in 36 pits, 20 of which are in 10 rows of two pits each, and 16 in 4 rows of four pits each. All pits are heated by coke oven gas with pressure and temperature controls and have the following dimensions; Unit Row No. Pits Type Dimensions Hearth Area 1,2, 3,4, 5,6 2 each Cross-Fired Regenerative Length 13'-0" Width 3 4'-O'* Depth 9*-2m 182 Sq. Ft. 74 One-Way Recuperative Length 18*-4f< Width 6'-4" Depth 33'-5" 336 Sq. Ft. 84 One-Way Recuperative Length 23'-4" Width 6'-4" Depth 12'-3" 347.7 Sq. Ft 10 4 One-Way Recuperative Length 38'-4" W5 dth 6,-4" Depth 11*-8" 116 Sq. Ft. 11 4 One-Way Recuperative Length 18*-4" Width 7*-0" Depth 128.3 Sq. Ft 9,12, 2 each 13,14 Cross-Fired Regenerative Length 15*-0" Width 14,-l|" Depth 9,~2j" 211.8 Sql Ft The total hearth area of the soaking pits is 5,910 square feet which is estimated to provide a maximum peak productivity rate of*355 tons per hour based on heating 60 tons per hour per 1,000 square feet. This is equivalent to 246,000 ingot tons per month operating 20 turns per week. March 15, 1965 2-3 AKE-004289 2.2 45 Inch by 120 Inch Slabbing Mill (Existing) The existing mill equipment to be utilized for cold s3 ab practice will comprise the following: Two Ingot Buggies 600/1200 FPM Ingot Receiving Table 191-5" long 398 FPM Mill Approach Table 20* 9-3/4*' long 398 FPM Mill Entry Table 27* -9*' long Front Mill Table 13*-6n long 375 FPM 375/750 FPM 45 Inch by 120 Inch Two-high Slabbing Mill, Rolls individually driven at a speed of 475/946 FPM by two 5000 HP, 40/80 KPM motors. IVjo (2) entry feed rolls, two (2) delivery feed rolls. Fifteen inch diameter screws, 2 inch pitch driven by two (2) 150 HP, 450 RPM motors. Mill Delivery Table 33'-0" long 375/750 FPM (This table will receive a general over haul as part of the scope of work) Vertical Edging Mill - 40 inch diameter rolls driven by a 2000 HP, 100/200 RPM motor. Maximum roll opening is 76 inches. Edger Delivery Table 13'-6" long 302 KPM (This table will receive a general over haul. as part of the scope of work) Scarfer Approach Table 33r-0" long 302 FPM Scarfer Unit i.s a Linde CM-43, two sided unit. Shear Entry Table 33*-0" long 302 FPM Slab Shear driven by two (2) 250 HI5 motors and suitable for shearing a 76 inch wide by 5.5 inch thick maximum slab. Shear Pull-back Table 1.2*-2" long 250 FPM Transfer Run-in Table 33n-li" long 302 FPM March 15, 1965 2-2 AKE-004290 2.3 Mill Machinery (New Equipment) All new equipment will be designed to suit the 100,000 pound continuous cast slab in the event that this equip ment is relocated in the future, and be interchangeable with machinery items of the new hot strip mill to minimize spares* The new equipment wi33 comprise the following: Shear Approach Tables (2) Shear Entry Table Motor Operated Adjustable Sideguards 900 Square Inch Dovmcut-Upcut Type Mechanical. Shear Deflector Gate and Crop Chute Crop Car and Cable Hoist Shear Delivery Table Shear Run-out Tab!e No. 1 Shear Run-out Table No. 2 Slab Scale S3 ab Stamper Scale Tab! e - Slab Transfer Four (A) Disappearing Stops IVo (2) Water Wheel Type Slab Coolers and Pushers t Water Wheel Tables Three (3) Slab Filers Recirculating Oil Systems Grease Systems Hydraulic Systems March 15, 1965 2-3 AKE-004291 Slab Shear Operators Pulpit Slab Pusher Operators Pulpit Scale Removal System 2.4 Water Piping Modifications 2.4.1 Mill Service Pumps The mill service pumps are presently located in the basement of the power house between column rows 19 and 20. There are four existing pumps as foHovs: 2 Worthington Pumps - Model 121.3 - present rating of 5000 gpm at 130 feet head - with 200 HP motor at 25 cycle. 1 Worthington Pump - Model 121.A3 - present rating of 5000 gpm at 130 feet head - with 200 HP motor at 25 cycle. 1 Worthington Pump -- Model 12LA3 - present rating of 5000 gpm at 175 feet head - with 300 HP motor, 1750 RPM, 440 volt, 3 phase, 60 cycle. The two pumps, model 121-3 arc to be relocated to the new pump house and modified to provide 5000 gpm at 175 feet head with a 300 HP motor, 1750 RIM, suitable for 2300 volt, 3 phase, 60 cycle supply. The 25 cycle pump, model 121 .A3 i.s to be removed and stored. The 60 cycle pump, model 321 .A3 is to be relocated to the new pump house. These pumps provide raw raver make-up water to the existing clarified water system for the slabbing and hot strip mills. Existing Claad.fied Water System The mill service pumps supply the raw river make-up water from the hot well and cold well to the system through a 12 inch pipe, to a dirty well located at No. 1 concentrator. The system can also be supplied through the 36 inch pipe which completes a loop with the 32 inch line. The system description is as follows: The water from the existing slab mill and part of the existing hot strip mill is drained via flume which conveys the water to No. 2 concentrator. From this concentrator the water is pumped through a 20 inch pipe to the mixing tank. It is then conveyed to the flocculation tank, then to the clarifiers. March 1.5, 3 965 2-4 AKE-004292 The remaining water drained from the hot strip mil] is conveyed via flume to No. 1 concentrator. From this concen trator it is pumped through a 24 inch pipe to the mixing tank. 3t is then conveyed to the flocculation tank, then to the clarifiers. From the clarifiers the water is conveyed by gravity flow to the clear well which is located at concentrator No. 1. The water is pumped from the clear well to the system through a 24 inch pipe. The 12 inch line from the mi31 service pumps connect to this 24 inch line at about column row 22 of the slab mill building. Beyond the takeoff to the bar mill booster pumps the line reduces to 20 inches. It is then reduced to 36 inches at the roll cooling towers and continues back to the mill service pumps, thus completing the loop system. 2.4*2 The existing clarified water system is shown on drawing PR-3297-851. New Piping Connections New Facilities The new facilities requiring water are the water wheels, slab shear and crop pit. It is proposed to recirculate an additional 8000 gpm to the water wheels through the clarified water system. This will be accomplished by tapping into the existing 16 inch header at the south end of the slabbing mill and supplying water to the new cooling towers. From the cooling towers the water will be pumped to the water wheels. The water wheel will have an overflow and drain~into concen trator No. 1 for recirculation in the system. The shear will be supplied from a branch line from the main header to the water wheel.. This branch line will also supply the water cooling requirements of the new slab shear crop pit. Sump pumps will maintain crop pit water level with discharge to No. 1 concentrator system. 2.4*3 Make-Up Water The make-up water for the cooling towers will be river water from the existing line that runs west along column row B of the slabbing mill, to the new cooling towers. This line is shown on drawing PR-3297-852. March 15, 1965 2-5 AKE-004293 I BIG RED 2.4*4 Supply Header from Pumps A new 16 inch header will be installed from the mill service pumps to the existing 16 inch line as shown on drawing PR-3297-852. A 12 inch tap will also be made into the existing 12 inch pipe that is located on the south si.de of the cold well, which ties into the existing 12 inch line on the north side of the cold well for feeding the soaking pits, hot process treatment, the ash disposal system, the cold process treatment and the Smith Shop. The new 16 inch line will be placed in a trench on the east side of the crop pit. It will run north to column row D, then west to column row 19 where it will be connected to the existing 12 inch line. Also from this 36 inch line, a 12 inch line will be taken off for connection to the existing 12 inch line on the north side of the cold well. A 1A jnch line will, be connected to this new 3.6 inch line for the emergency feed to the scarfor pumps. This new header is shown on drawing PR-3297-852. 2.4.5 Water Cooling for Air Compressors The existing pumps; 1 DeLaval Pump - Serial No. 22b093 - 1200 gpm @ 162 ft. head - with 40 HP motor, 1425 RPM, 220 volts, 3 phase 25 cycle. 1 DeLaval Pump - Serial No. 85355 - 600 gpm-- 3000 RPM steam driven - 315 ft. head. will, be retained and all piping rerouted to suit the new location of the air compressors. 2.4.6 Plant River Intake System The cold well receiving the river water for genera], plant supply will be a twin cell Installation with provision for individual operation of each cell during the annually scheduled clean-out. 2.4*7 Hydraulic Water for Slab Mill Side Guides and Roll Balance Water is supplied by two 1000 gpm, steam turbine pumps (one operating, one standby) at 600 psi for the operation of the slab mill side guides. The pump delivery incl.udes an March 15, 1965 2-6 AKE-004294 accumulator, compressed air type, and the pump suction is connected to a surge tank which is charged continuously with water from the existing air compressor cooling system. -Well water is presently used as make-up for the surge tank. The basic equipment items of the existing system will be relocated to the new pump house. 2.5 Electrical Power Distribution Power for the slab mill modifications will be obtained from the 6.6 KV 3 phase, 60 cycle existing bar mill auxiliary feeder at tower No. 9. The 6.6 KV feeder routing is shown on drawing PR-3297-915. The pump house control room feeder will originate at tower No. 9 where, it will, tap the existing bar mill auxiliary feeder and terminate at the incoming line circuit breaker which will be included on the indoor 13.8 KV, 500 MVA metal clad switchgear located in the pump house control, room. Double ended unit substations will be parallel connected in order that both ends can be fed from the same feeder. The double ended unit substations will employ a normally open tie circuit breaker operating in a momentary paralleling scheme with the two transformer main secondary circuit breakers. Double ended unit substations will be rated 7500 KVA at 6,600x13,200-2400 volts, 3000 KVA at 6,600xl3,200-480Y/27? volts and 2000 KW at 6,600x13,200-250 volts D.C. One line diagram of these distribution systems are shown on drawing PR-3297-913 and PR-3297-924. Each 2400 volt and 480 volt transformer will bo loaded to only approximately 60 percent of its rating. This practice insures that with one transformer out of service the remain ing transformer of the double ended unit, operating with the normally open tie breaker closed, can carry all essentia] loads on both busses. Because of its overload rating, the double ended 2000 KW constant potential 250 volt D.C. rectifier substation has essentially a 200 percent standby capacity for two hours. Loads up to and including 200 HP will generally be fed at 480 volts; loads above 200 KP up to and including 2000 HP at 2300 volts; and loads over 2000 HP at 13,800 volts. u L March 15, 1965 BIG RED 2-7 AKE-004295 II I II Motors applied at the 2300 volt level will bo breaker started or employ medium voltage starters depending on motor horsepower and frequency of operation. On the 480 volt system the motor starters will be grouped into motor control centers. Kach starter in a 480 volt motor control center will consist of a three pole visible contact disconnecting device* three class J current limiting fuses, a NMA sized contactor, three over]oad relays and a control power trans former. BIG RED March 15, 1965 2-8 AKE-004296 Me*'- PROJ SECT, TOO 701 CONS TO DETAIL -- 01b 02?.. 03b 120 130 IbO 150 2.2.0 366 b6l U6? b6b b65 i|66 b6? PIPING DISTRIBUTION SERVICE WATER Includes the purchase and installation of all piping starting with the suction line from the new cold well at the boiler house to the three (3) relocated service water pumps and extends to' the existing headers in Slab Mill Area. This account includes all interconnecting lines between existing headers and from existing headers to new cooling tower. Also included are lines to and from cooling tower to water wheels, slab mill equipment and oil cellar. All as shown on Drawing 853* This Section includes all above ground, under" ground, and piping in.trenches complete including ditching, concrete trenches and supports. Shoring Removal, and Chipping Existing Concrete Ditching and Backfill Formvjork Reinforcing Steel Anchor Bolts and Embedded Metal Concrete Miscellaneous Steel Painting - Purchase - Pipe and Fittings Purchase - Valves Pipe Installation Pipe Insulation Hangers and Supports Valve Box BIG RED March 15* 1965 700-1 b-31 AKE-004297 I I I PROJ SECT CCNSTR. DETAIL I TOO PIPING DISTRIBUTION (Continued) TO? HYDRAULIC WATER PIPING I Includes the purchase and installation of piping from the relocated accumulator to the tie-in to existing header. Ditching for the underground a portion is covered under Section T01. 366 Painting i I46I Purchase - Pipe and Fittings Ij6? Purchase - Valves 1|61( Pipe Installation i T03 AIR PIPING ^Includes the purchase and installation of piping i starting with the prefilters, to dryers and then to tie-in to existing header in Slab Kill Area. Also included is a line to the oil cellar. i 366 Painting 1)61 Purchase - Pipe and Fittings 1(6? Purchase - Valves i 1|61( Pipe Installation h66 Hangers and Supports R 708 ----- STEAK PIPE Includes the relocation of existing steam and feedwater lines in boiler house, tie-in of existing lines along Column Row UC" of Slab Mill and new header from existing ?0 inch steam line in boiler house for turbines on I relocated hydraulic water pumps. Also included is a line to the oil cellar. R I46I Purchase - Pipe and Fittings 1(6? Purchase - Valves h6h Pipe Installation b65 Pipe Insulation lj66 Hangers and Supports to 700-2 2(~3? BIG RED AKE-004298 t I BIG RED AKE-004299 S5frr ENGINEERING REPORT PROJECT NO* 71A6 UNIVERSAL SLABBING KILL "CHART OF ACCOUNTS" MIDDLETOWN WORKS VOLUME II APRIL 15, 1966 KAISER ENGINEERS, INC. REPORT NO. 71A6-2 AKE-004300 PROJ. SECT. 704 CONSTR. DETAIL 461 462 464 465 466 STEAM This project section shall include all the costs for the steam piping -within the Slab Mill Facilities. This system will start at a valved connection near the Hot Strip Mill Slab Reheat Furnaces and end with a valve at the Soaking Pit Structure. Purchase - Pipe and Fittings Purchase - Valves, Strainers and Traps Pipe Installation Pipe Insulation Hangers and Supports April 15, 1966 BIG RED 700-4 AKE-004301 PROJ. SECT. 705 CONSTR. DETAIL 414 461 462 464 465 466 WELL WATER` This project section shall include all the costs for the well water piping within the Slab Mill Facilities. This system will start at a valved connection at the Soaking Pit structure and continue throughout the Slab Mill Facilities, Also Included here are the branches to the drinking fountains and valved connections at the header for branches to the Rest Rooms. Drinking Fountains Purchase - Pipe and Fittings Purchase - Valves Pipe Installation Pipe Insulation Hangers and Supports April 15, 1966 BIG RED 700-5 AKE-004302 s I BIG RED AKE-004303