Document dJw7pGON696yJvO8aLj2krOQ
SUBJECT: ASBESTOS
PAGE: 3 OF 3 LAST REVISED: 11/09/87
UNION CARBIDE CORPORATION TEXAS CITY PLANT
Plant Procedure SH-5.6 Attachment #1
NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR FACILITY CONTAINING ASBESTOS MATERIAL
^ I SIDescription of the facility:
Estimate of approximate amount of friable asbestos materials present:
(Area in sq. ft. or linear ft.)
Estimation technique used:
Estimated age of asbestos materia! _ocation of faci1ity:
AO
Scheduled starting day: __ Scheduled completion day:
V/./V/>9
Nature of planned demolition or renovation: /Pe.
s/A
_ r^ r'V* /if rf-
Method to be used (negative pressure enclosure, glove bag, etc.)
yfrv-z*
Name of person that prepared the form: Location and telephone number: Date:
<3
NOTt:
This form must be completed and delivered to the EP Department
(Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, - or as soon as poss'toe following an emergency renovation operation.
April 1985/Revised November 1987 #0134s
UCTC 18658