Document dDaEXKGd85B7LReMMQJmyEwYR

U.S. Environmental Protection Agency Region 7 11201 Renner Blvd., Lenexa, KS 66219 Date: NOTICE OF INSPECTION Resource Conservation and Recovery Act (RCRA) Public Law 94-580, as amended. Subtitle I Underground Storage Tanks 3-1-23 Inspector: Joe Heafner Brian D'Alfonso Facility Name: Indian Country Mini Mart Agency Facility ID# EPA-TrUSTD-2320 Street Address: 20330 US HWY 75 Facility Representative(s): [sign and date] See Original City: Holton State: KS Zip Code: 66436 Reason for Inspection: __Scheduled_________ Entry by Consent (X) Warrant ( ) To determine the extent of compliance with the above referenced law, which may require the collection of samples, documents and/or photographs. Other (Specify)__________________________________________________________________________ Does EPA have access to this facility for the inspection? Yes (X) No ( ) Name and title of person granting access___ ______________________________________ Facility Compliance Documents Received Log Document Description, e.g., ATG tapes, CP tests, SIR reports, Line tests, etc. Representative Initials ATG Tapes Photos See Original See Original The facts established by this inspection will be reviewed by personnel in the EPA Regional Office. A final determination of your facility's compliance with the EPA regulations will be made as a result of this review. The review may reveal additional deficiencies. Signature of Inspector: JOSEPH HEAFNER Digitally signed by JOSEPH HEAFNER Date: 2023.04.14 06:03:22 -05'00' Date: ECAD RCRA Section Chief: Digitally signed by AMBER AMBER WHISNANT WHISNANT Date: 2023.04.21 11:29:22 -05'00' Date: UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 1 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Agency Fac. ID: EPA-TrUSTd-2320 REPORT OF OPENING AND CLOSING CONFERENCES Opening Conference 1. Give time of and list attendees of Opening Conference: Joe Heafner, Brian D'Alfonso ____ ________________Carla Nissen______________________________ _ ____________________________________________________________________________ Circle Yes or No 2. Were UST Inspection Credentials presented? Yes No 3. Was the statutory and regulatory purpose of the inspection explained? 4. Were areas of the facility being inspected noted? 5. Was a list of records being reviewed provided? 6. Was an opportunity given to claim confidential business information (CBI)? 7. Was the approximate duration of the inspection noted? 8. Were operators at the facility notified they have the opportunity to fix areas of concern identified during the inspection? 9. Was equipment used during the inspection noted? Yes No Yes No Yes No Yes No Yes No Yes No Yes No Closing Conference 1. Give time of and list attendees of Closing Conference:_Joe Heafner, Brian D'Alfonso____ ___________Carla Nissen_________________________ ____________________________________________________________________________ Circle Yes or No 2. Was the purpose of the inspection restated? Yes No 3. Was what happens with photos taken during the inspection explained? 4. Were areas of concern and inspection observations discussed? Note: Compliance is the responsibility of the operators and any potential deficiencies or areas of concern are not the final determination of compliance. Yes No Yes No 5. Was EPA's right to bring an enforcement action pending review explained? 6. Were any "fixed" deficiencies or areas of concern noted in the report? Yes No Yes No 7. Were photos and copies of documents itemized on the report? 8. Was the time frame for receiving the completed report given? 9. Was the Small Business Resources Information Sheet provided? Yes No Yes No Yes No UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 2 of 24 Pages Initial/Date:JAH 3/1/23__ 1 UST Inspection Checklist I. Ownership of Tank(s) Tribal Agency Fac. ID: EPA-TrUSTd-2320 II. Location of Tank(s) same as owner location (I.) Owner Name: Carla Nissen _____________________________________________________________ Street Address 20330 US HWY 75 ______________________________________________________________ County Jackson ______________________________________________________________ City State Zip Code Holton KS 66436 ______________________________________________________________ Phone Number 785-364-4223 ______________________________________________________________ Owner Contact Person Carla Nissen ______________________________________________________________ Do you own UST(s) at other UST Facilities Yes/No If Yes, how many facilities______________ How many USTs____ __________________ Facility Name or Company Site identifier, as applicable Indian Country Mini Mart ___________________________________________________________ Street Address or State Road, as applicable 20330 US HWY 75 ___________________________________________________________ County Jackson ___________________________________________________________ City (nearest) State Zip Code Holton KS 66436 ___________________________________________________________ Contact Person(s) at Facility Phone Number Carla Nissen 785-364-4223 ___________________________________________________________ Latitude Longitude 39.145167 -95.747322 ___________________________________________________________ Datum WGS 84 ___________________________________________________________ ICIS/FERS Number: Date entered: ___________________________________________________________ III. Notification (280.22) Notification to implementing agency; name _________________________[280.22(a)] Agency Facility ID # _EPA-TrUSTD-2320 ___; Agency notified? Y N Unknown NA [280.22(b)] Has ownership changed in previous 30 days? Y N Unknown NA [280.22(b)] Have substances stored changed in the USTs? Y N Unknown NA [280.22(b)] Do newly stored substances include blends greater than E10 or B20? Y N Unknown NA [280.32(b)] IV. Financial Responsibility (280.93) Is documentation of financial responsibility available? Y N Unknown NA Does Wording Follows 40 CFR 280 Subpart B Y N Unknown NA Does FR mechanism cover cleanup of releases from USTs? Y N Unknown NA Does FR mechanism cover damage to property and third party liability caused by releases from USTs? Y N Unknown NA Is amount of FR coverage adequate based on number of facilities? Y N Unknown NA $1,000,000 for less than 200 facilities $2,000,000 for more than 200 facilities Is amount of FR coverage adequate based on monthly throughput? $1,000,000 if through put greater than 100,000 gallons $50,000 if throughput less than 100,000 gallons Y N Unknown NA Does the FR mechanism list the covered facilities as registered by EPA on the Declaration Page? Y N Unknown NA Does the FR mechanism provide first dollar coverage without self-insured retention? Y N Unknown NA Specific Financial Mechanism used - check below: State Fund _____ Private Insurance: Insurer/Policy #__FEI-LST-25063-04 Expires 6/7/23 Guarantee Surety Bond Letter of Credit Self Insured Local Government Not Required (Federal & State government, hazardous substance USTs) UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 3 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Agency Fac. ID: EPA-TrUSTd-2320 V. Operator Training (280.240) [List names, certificate numbers, expiration dates, trainer, and state] A Operator(s): Carla Nissen, Cert. No A/B 00006243 TMS-Kansas 12/6/2018 __________________________________________________________________________________________ B Operators(s): Carla Nissen, Cert. NO A/B 00006243, TMS-Kansas 12/6/18 __________________________________________________________________________________________ C Operators(s): Debbie Nissen 12/6/2018____________________________________________ Does the owner have a list of designated operators currently trained at each facility? Y N Unknown NA Does the owner have evidence of operator training or retraining? Y N Unknown NA Were any of the designated UST Operators on duty during the inspection? Y N Unknown NA VI. Proximity of Groundwater Wells and Release History Drinking water wells within 1,500 feet of the tank basin; is so note how many and list what types: Two domestic or wells required water rights were within 1,500 feet of the tank basin Evidence of release or spills at facility Greater than 25 gallons (estimate) Releases reported to implementing agency; if so, date(s) [280.53] Release confirmed; when and how Initial abatement measures and site characterization Free product removal Soil or ground water contamination Corrective action plan submitted Remediation ongoing Remediation completed, no further action;date(s) Unknown VII. Tank Information (give numbers) Tank 6 Tank presently in use Yes If not, date last used If empty, verify 1" or less left (see Section IX.) (see Section IX.) Most recent M/Y tank installed/upgraded (mm/dd/yr) 1/1/2007 Material of Construction: steel, impressed current, sacrificial anodes, composite, FRP,, internal lining, excavation liner single-walled (SW), double-walled (DW) Capacity of Tank (gal) Substance Stored E-15, E85 labeling correct? Are Compatibility Records available? [280.34(b)(3)] Is compatibility demonstrated? [280.32(b)(1) and (2)] Yes No NA UNK Yes No NA UNK Yes No NA UNK Contained Submersible Turbine Pump (STP) Sumps Yes No NA UNK If yes, give installation date___________________ Is STP used for release detection? Yes No NA UNK FRP, SW 6000 Dyed Diesel NA NA NA NA Is STP double-walled? Yes No NA UNK If Double-Walled (DW), Date of Last Monthly Integrity Check of Annular Space? [280.35(a)(1)(i)] Note: only NA applies to interstitial spaces under pressure or vacuum or filled with brine. UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 4 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart VII. Tank Information (give numbers) Contained Submersible Turbine Pump (STP) Sumps If DW, are the last 12 months of records available? Yes No NA UNK Tank 6 NA Agency Fac. ID: EPA-TrUSTd-2320 If non-DW, Date of Last 3-year Containment Integrity Test? [280.35(a)(1)(ii)] Note: Triennial Sump Testing is NA required if sumps installed on or after April, 11, 2016. Special Configuration Manifolded/Compartmentalized - Describe using tank NA numbers Field-Constructed/Airport Hydrant System FC or AHS NA VIII. Piping Information Piping type Pressurized X Suction Piping Material: steel, copper, impressed current, sacrificial anodes, FRP, flexible nonmetallic single-walled (SW), double-walled (DW) Under Dispenser Containment (UDC) Yes No NA UNK If yes, give installation date___________________ Is UDC used for release detection? Yes No NA UNK Flexible DW Nonmetal NA NA Is UDC double-walled? Yes No NA UNK If DW, Date of Last Monthly Integrity Check of Annular NA Space?[280.35(a)(1)(i)] Note: only applies to interstitial spaces under pressure or vacuum or filled with brine. If DW, are the last 12 months of records available? NA Yes No NA UNK If non-DW, Date of Last 3-Year Containment Integrity Test? [280.35(a)(1)(ii)] Note: Triennial Sump Testing is NA required if sumps installed on or after April, 11, 2016. Tank or piping properly designed and constructed according to a code of practice developed by a nationally recognized association or independent testing laboratory [280.20(a), 280.20(b)] Y N Unknown NA IX. Repairs NA Repairs are conducted according to a code of practice [280.33(a)] Y N Unknown NA Metal piping sections/fittings that are damaged and have released product are replaced manufacturer's specifications. Non-corrodible pipes and fittings may be repaired in accordance with the manufacturer's specifications. [280.33(c)] Y N Unknown NA Repairs to secondary containment areas of tanks, piping, and containment sumps are tightness tested within 30 days of repair completion. All other repairs to tanks and piping are tightness tested within 30 days of repair completion (except when internal inspection conducted or monthly monitoring is conducted) [280.33(d)] Y N Unknown NA CP systems are tested/inspected within 6 months of repair of any cathodically protected UST system [280.33(e)] Y N Unknown NA Internal linings repaired following standard code or practice [Citation needed] Y N Unknown NA Repaired spill or overfill prevention equipment are tested or inspected within 30 days, as appropriate, in accordance with 280.35 to ensure it is operating properly. [280.33(f)] Y N Unknown NA Records of repairs are maintained [280.33(g)] Y N Unknown NA UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 5 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart X. Temporary Closure NA CP is continued to be maintained [280.70(a)] Y N Unknown NA Agency Fac. ID: EPA-TrUSTd-2320 Release detection is being performed and UST system contains > 1 inch of product [280.70(a)] Y N Unknown NA Vent lines left open and functioning [280.70(b)] Y N Unknown NA Lines, pumps, manways, and ancillary equipment capped and secured [280.70(b)] Y N Unknown NA XI. Corrosion Protection (CP) Tank and piping components are constructed of or jacketed with non-corrodible materials, e.g., FRP, dielectric coatings, plastic, etc. [280.20(a)(1), 280.20(a)(3), [280.20(b)(1)] Circle one or both: Tanks Pipes Y N Unknown NA Implementing agency has determined that tank and piping construction and corrosion protection are designed to prevent releases in a manner that is no less protective of human health and environment [280.20(a)(5), 280.20(b)(4)] Y N Unknown NA Owners and operators have maintained records by corrosion expert to document that CP is not necessary [280.20(a)(4)(ii), 280.20(b)(3)(ii)] Y N Unknown NA Steel tank or piping coated with suitable dielectric material and cathodically protected [280.20(a)(2)(i), 280.20(b)(2)(i)] Y N Unknown NA Field-installed CP system designed by a corrosion expert [280.20(a)(2)(ii), 280.20(b)(2)(ii) Y N Unknown NA CP system tested and documentation maintained every three years or a time frame established by implementing agency [280.31(b)(1), 280.31(d)(2)] Y N Unknown NA Criteria used to determine that CP is adequate was in accordance with a standard code of practice developed by a nationally recognized association [280.31(b)(2)] Y N Unknown NA CP system did not meet acceptable criteria at last test and action was taken by owner/operator to correct problem [280.31(b)(2)] Y N Unknown NA Metal components in sumps NA Tank numbers: Tank 6 Are the metal components at the tank and dispenser isolated (e.g. booted), Yes cathodically protected or isolated? [280.20(b)(4)] Yes No NA UNK Notes: Metal components are booted and isolated. UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 6 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart XI. Corrosion Protection (CP) Tank numTank 6 Lining: [280.21(b)(1)] NA Periodic lining inspection requirements for tank met [280.21(b)(1)(ii)] Yes No NA UNK [10 years after installation, every five years thereafter] Documentation that lining was installed [280.21 (b) (1) (i)] Yes No NA UNK Shell integrity tested and passed? NA UNK Yes No Internal inspection test result - Pass or Fail If Fail, is tank still in service? [280.21(b)(1)(ii)] Yes No NA UNK Agency Fac. ID: EPA-TrUSTd-2320 Sacrificial Anode: NA CP system operated and maintained continuously. [28 Yes No NA UNK Tested Six Months after repair Last 3 yr test results show a voltage of at least -850mV [280.31(b)(2)] Yes No Dates of last two 3 yr test results available? [280.31(d)(2)] Yes No Every Three Years after installation [280.31(b)(1)] List Dates: Impressed Current: NA Is the Rectifier on a dedicated power circuit? Yes No NA UNK CP system operated and maintained continuously. [28 Yes No NA UNK Tested Six Months after repair Last 3 yr test results show a voltage of at least -850mV 100 mv shift [280.31(b)(2)] Yes No NA UNK CP inspected and rectifier log maintained every 60 days to ensure equipment is running properly. Last three test results available? [280.31(d)(1)] Yes No NA UNK Dates of last two 3 yr test results available? [280.31(d)(2)] Yes No Every Three Years after installation [280.31(b)(1)] List Dates: Notes: UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 7 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian County Mini Mart Agency Fac. ID: EPA-TrUSTd-2320 XII. Spill and Overfill Protection [280.21(d)] Indicate any USTs filled by transfers < 25 gallons For transfers greater than 25 gallons Spill Prevention Tank numbers: Tank 6 Device is present and functional? [280.20(c)(1)(i)] Yes No NA UNK Spill bucket free of water, debris, etc. Yes No NA UNK Double walled? Yes No NA UNK Note: only applies to interstitial spaces under pressure or vacuum or filled with brine. YES NO NA If Yes, Last Monthly Check? [280.35(a)(1)(i)] List date: If No, Date of Last Triennial Containment Integrity Test [280.35(a)(1)(ii)] List date: NA 4/8/2021 Overfill Prevention Device is present and operational? [280.20(c)(1)(ii)] Yes No NA UNK Date of Last Triennial Inspection? [280.35(a)(2)] YES 4/8/21 Ball float valve riser present: [280.20(c)(1)(ii)(B) Yes No NA UNK Ball float valves are not suitable on suction systems, YES with coaxial drop tubes, or pressurized deliveries. Ball float valve installed or replaced after October 13, 2015? [280.20(c)(3)] Yes No NA UNK NA Flapper valve Operational: [280.20(c)(1)(ii)(B)] NA Yes No NA UNK Automatic shutoff: Operational: [280.20(c)(1)(ii)(A)] NA Yes No NA UNK Automatic shutoff: Operational: [280.20(c)(1)(ii)(A)] NA Yes No NA UNK Alarms Operational: [ 280.20(c)(1)(ii)(B)] NA Yes No NA UNK Visible and/or audible to jobber/driver? NA Yes No NA UNK Location(s) of overfill alarm(s): South of Tank, North side of Building Failure to take necessary precautions to prevent a spill or overfill during product delivery [280.30(a)] Y N Unknown NA XIII. Tank and Pipe Release Detection Release detection present [280.40(a)] Y N Unknown NA Note: Emergency Generator Tanks installed on or before 10/13/2015 must have release detection by 10/13/2018. Emergency Generator Tanks installed after 10/13/2015 but before 4/11/2016 must have release detection installed during installation. Emergency Generator Tanks installed after 4/11/2016 must have secondary containment and use interstitial monitoring. Release detection system operating properly (i.e., system must be able to detect a release from any portion of the tank and piping that routinely contains product) [(280.40(a)(1)] Y N Unknown NA Release detection system meets the performance requirements at 280.43 or 280.44 [(280.40(a)(3)] Y N Unknown NA Implementing agency has been notified of a suspected release as required, or when a release detection method or device alarms or fails a test [(280.40(b)] Y N Unknown NA Tanks and piping are monitored monthly for releases and records available (must have records for the two most recent consecutive months and for 10 months of the last 12 months). [280.41(a), and 280.45(b)] Y N Unknown NA Meets performance requirements for tank and line tightness test and maintains records.[280.43(c), 280.44(b), and 280.45(b)] Y N Unknown NA UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 8 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Agency Fac. ID: EPA-TrUSTd-2320 XIII. Tank and Pipe Release Detection Hazardous Substance UST Systems: NA Release detection requirements are complied with for UST systems containing product. [(280.42)(b)] Tanks and all piping systems equipped with secondary containment Pressurized piping w/ ALLD Monitored for a release every 30 days Y N Unknown NA Y N Unknown NA Y N Unknown NA Pressurized Piping Set 1 TWO METHODS MUST BE SELECTED; ONE FROM EACH SET. Tank numbers: Tank 6 Automatic Line Leak Detector (ALLD) installed (give date last tested/checked) Yes No NA UNK 4/12/2022 Annual function test of the operation of the leak detector within last 12 months [280.44(a)] Yes No NA UNK * In accordance with the manufacturer's requirements YES YES Does the owner/operator have ALLD function tests available for the last 3 years? Yes No NA UNK Operating so as to alert the operator to the presence of a leak (see 280.44(a) for description of ALLD) [280.44(a)] Yes No NA UNK Is the ALLD appropriate for the fuel stored in the UST? Yes No NA UNK Automatic Shut-off Device (Electronic line leak detector (ELLD)) NA Continuous Alarm System (sump sensor/double-walled piping) Must meet leak threshold for large and small releases. NA Set 2 Tank numbers: NO YES YES Tank 6 Annual Line Tightness Testing -- give date 4/12/2022 Is the last Line Tightness Test within the last 12 months? Yes No NA UNK Does the owner/operator have line tightness test reports available for the last 3 years? Yes No NA UNK Secondary Containment with Interstitial Monitoring Yes No NA UNK Other (SIR, etc.) Yes No NA UNK Suction Piping Line Tightness Testing (required every 3 yr) Yes No NA UNK YES NO NA NA NA Indicate date of most recent test Secondary Containment with Interstitial Monitoring Yes No NA UNK NA Other (SIR, etc.) Yes No NA UNK NA No Leak Detection Required (must answer yes to all of the following questions): Operates at less than atmospheric pressure Yes No NA UNK NA Has only one check valve which is located directly under pump NA (dispenser) Yes No NA UNK Slope of piping allows product to drain back into tank when NA suction released Yes No NA UNK UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 9 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Agency Fac. ID: EPA-TrUSTd-2320 XIII. Tank and Pipe Release Detection Tank Numbers: Tank 6 Under Dispenser Containment (UDC) List dates installed NA Note: Triennial Sump Testing required if sump installed on or after April 11, 2016. Are UDC Monitored? NA Yes No NA UNK How are UDC Monitored? Visual or Electronic Are records of inspections available? Yes No NA UNK NA UDC Monitoring Notes: (Records of release: State the past 12 months monitoring records) Tank Release Detection Summary Mark Tank numbers with an "X" Automatic Tank Gauging (ATG) Automatic Line Monitoring (ALM) (refer to appropriate detailed RD form) Pages 13-18 x Interstitial Monitoring (IM) Statistical Inventory Reconciliation (SIR) Manual Tank Gauging (MTG) XIV. Walkthrough Inspections [ 280.36 - Subpart C] Owner and operators must conduct walkthrough inspections of the following: Must have records for inspections performed every 30 days Y N Unknown NA Date of last 30-day Walkthrough Inspection_______12/2022_____________________ Spill Prevention Equipment - must be checked for damage, remove liquid or debris, and check Y N Unknown NA fill cap. [If deliveries occur at intervals greater than every 30 days, spill prevention equipment can be checked at the time of delivery] DW spill prevention equipment with interstitial monitoring - must check for leak in interstitial area. [Only applies to DW spill prevention equipment with vacuum, pressurized or brine-filled interstitial spaces] Y N Unknown NA Release detection equipment - must check to ensure operating with no alarms and review records of of release detection testing. Y N Unknown NA Do the 30-day walkthrough inspections follow a nationally recognized standard code or practice? Y N Unknown NA Are records of 30-day walkthrough inspections available for the two most recent consecutive months and for 10 of the last 12 months? Y N Unknown NA Must have records for inspections performed each year Date of last Annual Walkthrough Inspection____4/12/2022________ Containment sumps - must check for damage, leaks, remove liquid or debris. DW sumps with interstitial monitoring - must be checked for leak in interstitial area. Hand-held release detection equipment - must check tank gauge sticks or groundwater bailer. Does the annual walkthrough inspection follow a nationally recognizes standard code or practice? Y N Unknown NA Y N Unknown NA Y N Unknown NA Y N Unknown NA Y N Unknown NA UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 10 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart SITE DRAWING DATE: 3-1-23 WEATHER: TIME ON SITE: 09:30 ENVIRONMENTALLY SENSITIVE AREA : Y N If "Yes", please describe: Agency Fac. ID: EPA-TrUSTd-2320 TIME OFF SITE: 11:00 ATG Probe STP Sump and ball float Spill Bucket Dyed Diesel Dispenser Diesel and Gasoline Dispensers Tank 6 (Dyed Diesel) 6K UST All other diesel (north) and all gasoline (south) served by ASTs to the east. ASTs Pictures UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 11 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart NOTES: No additional notes Agency Fac. ID: EPA-TrUSTd-2320 UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 12 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Automatic Tank Gauging (ATG) NA Agency Fac. ID: EPA-TrUSTed-2320 Manufacturer, name and model number of system: Veeder-Root TLS-350 Third-party evaluators: Midwest Research Institute, Ken Wilcox Associates Unknown NOTE: Most ATGs are not certified for use with used/waste oil tanks ATG checking portion of tank that routinely contains product [280.40(a)(1)] Yes No Device documentation is available at site (e.g., manufacturer's brochures, owners' manual, third-party certification) Yes No Checked for presence of monitoring box and evidence that device is working. Yes No Checked documentation that system installed, calibrated, & maintained according to manufacturer's instructions [280.40(a)(2)] ATG must be set for 0.2 gal/hr minimum Yes No Monitoring (includes inventory) and testing records are available for the past 12 months Year Month Tank #1 Tank #2 Tank #3 2023 January No Test Tank #4 Tank #5 Yes No Tank #6 2023 February 28 Pass 2022 March 25 Pass 2022 April 29 Pass 2022 May 27 Pass 2022 June 1 Pass 2022 July 3 Pass 2022 August 21 Pass 2022 September 9 Pass 2022 October 29 Pass 2022 November 1 Pass 2022 December 23 Pass Non-passing results reported and resolved in accordance with implementing agency's directions. [280.40(b)] NA Yes No Annual Release Detection Operability Test Date: ____4/8/21____ 1. Automatic tank gauge and other controllers: test alarm; verify system configuration; test battery backup. 2. Probes and sensors: inspect for residual buildup; ensure floats move freely; ensure shaft is not damaged; ensure accessible cables are free of kinks and breaks; test alarm operability and communication with controller. 3. Does the owner/operator have operability test records for the last three years? Y N Unknown NA Y N Unknown NA Y N Unknown NA x Test was performed on April 12, 2022 (Received after the completion of the inspection) UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 13 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Automatic Line Monitoring (ALM) NA Manufacturer, name and model number of system: Third-party evaluators: Agency Fac. ID: EPA-TrUSTd-2320 Unknown ALM checking portion of piping that routinely contains product [280.40(a)(1)] Device documentation is available at site (e.g., manufacturer's brochures, owners' manual, third-party certification) Checked for presence of monitoring box and evidence that device is working. Checked documentation that system installed, calibrated, & maintained according to manufacturer's instructions [280.40(a)(2)] ALM must be set for 0.2 gal/hr minimum Monitoring (includes inventory) and testing records are available for the past 12 months Year Month Tank #2 January February Yes No Yes No Yes No Yes No Yes No March April May June July August September October November December Non-passing results reported and resolved in accordance with implementing agency's directions. [280.40(b)] NA Annual Function Test Test Date: ____________ Yes No 1. Automatic tank gauge and other controllers: test alarm; verify system configuration; Y N Unknown NA test battery backup. 2. ALM units: ensure accessible cables are free of kinks and breaks; test alarm operability and communication with controller. Y N Unknown NA 3. Does the owner/operator have function test records for the last three years? Y N Unknown NA UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 14 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Interstitial Monitoring for: Piping / Tank(s) NA Agency Fac. ID:EPA-TrUSTd-2320 Manufacturer and name of system: Date system installed: Materials used for secondary containment: Materials used for internal lining: Interstitial space is monitored (Circle one): automatically, continuously, or on a monthly basis. If tank is of double-walled construction, what is material of construction? FRP If piping is of double-walled construction, what is material of construction? FRP Documentation of monthly readings is available for last 12 months. Year Month Tank Pipe #1 #1 January February March April May June July August September October November December Yes No NA Monitoring method is documented as capable of detecting a leak as small as .1 gal/hr with at least a 95% probability of detection and a probability of false alarm of no more than 5%. Yes No NA System is designed to detect release from any portion of UST system that routinely contains product. Yes No NA Secondary containment tight as to direct a release to the monitoring point and permit its detection [280.43(g)(2)] Yes No NA Sensor is positioned correctly and operating in accordance with manufacturer's instructions [280.40(a)(2)] Yes No NA Non-passing results reported and resolved in accordance with implementing agency's directions. [280.40(b)] Yes No NA Annual Release Detection Operability Test Date: ___ _________ 1. Vacuum pumps and pressure gauges to ensure proper communication with sensors Y N Unknown NA and controller. 2. Sensors: ensure floats move freely; ensure accessible cables are free of kinks and breaks; test alarm operability and communication with controller. Y N Unknown NA 3. Does the owner/operator have operability test records for the last three years? x Y N Unknown NA UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 15 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Agency Fac. ID: EPA-TrUSTd-2320 Inventory Control [for Compliance Assistance Purposes only] NA Inventory Control data input: ATG Manual tank gauging (stick) Leak Check Calculation is performed each month to detect a release of 1.0 percent of flow-through plus 130 gallons. [280.43(a)] Inventory volume measurements for regulated substance inputs, withdrawals, and the amount still remaining in the tank are recorded each operating day. [280.43(a)(1)] The equipment used is capable of measuring the level of product over the full range of the tank's height to the nearest oneeighth of an inch. [280.43(a)(2)] The regulated substance inputs are reconciled with delivery receipts by measurement of the tank inventory volume before and after delivery. [280.43(a)(3)] Deliveries are made through a drop tube that extends to within one foot of the tank bottom. [280.43(a)(4)] Product dispensing is metered and recorded within the local standards for meter calibration or an accuracy of 6 cubic inches for every 5 gallons of product withdrawn. [280.43(a)(5)] The measurement of any water level in the bottom of the tank is made to the nearest one-eighth of an inch at least once a month. [280.43(a)(6)] Inventory Control Records are available for the past 12 months Operator or owner has access to correct tank charts to convert inches to gallons. Leak Check Calculation Results: P = PASS Year Month F = FAIL N=None Tank #1 Tank #2 Tank #3 Tank #4 Tank #5 January February March April May June July August September October November December Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Tank #6 Non-passing results reported and resolved in accordance with implementing agency's directions. [280.40(b)] Notes: NA Yes No UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 16 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Statistical Inventory Reconciliation (SIR) NA Agency Fac. ID: EPA-TrUSTd-2320 Designer/Manufacturer and name of program: SIR Service Provider: Third-party evaluators: SIR data input: ATG * Manual tank gauging (stick) (Must follow the requirements for inventory control) * Monthly water level readings recorded, drop tubes present, meters calibrated, and the dipstick is marked legibly and product levels can be measured to the nearest 1/8 inch Yes No SIR documentation is available at site (e.g., designer's brochures, owners' manual) Yes No Owner/Operator has documentation on file verifying method meets minimum performance standards of 0.20 gph with Pd 95% and Pfa of 5% for statistical inventory reconciliation (e.g., results sheets under EPA's "Standard Test Procedures for Evaluating Leak Yes No Detection Methods"). SIR results are available for the past 12 months Yes No SIR Test Results: P = PASS Year F = FAIL Month INC = Inconclusive N=None Tank #1 Tank #2 Tank #3 Tank #4 Tank #5 Tank #6 January February March April May June July August September October November December Non-passing results reported and resolved in accordance with implementing agency's directions. [280.40(b)] Receiving results within a time frame established by implementing agency [280.41(a) & 280.43(h)] NA Yes No Yes No Annual Release Detection Operability Test Date: _____________ 1. If ATG used for data input, refer to page 12 for annual testing requirements. 2. If tank measuring stick used for data input: Hand-held sampling equipment (gauging Y N Unknown NA sticks, etc.) to ensure proper operation. 3. Does the owner/operator have operability test records for the last three years? Y N Unknown NA UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 17 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Manual Tank Gauging (MTG) NA Agency Fac. ID: EPA-TrUSTd-2320 Manual tank gauging may be used as the sole method of leak detection only for tanks of 1,000 gal or less, or in combination with tank tightness testing for tanks 2,000 gal. or less. * Manual tank gauging must be used in combination with tank tightness testing for tanks over 1,000 gal. Records show liquid level measurements are taken at beginning and ending of period of at least 36 hours during which no liquid is added to or removed from the tank. [280.43(b)(1)] Yes No Level measurements based on aver. of two consecutive stick readings at both beginning and end of period. Yes No Monthly average of variation between beginning and end measurements is less than standard shown below for corresponding size and dimensions of tank and waiting time. Yes No Gauge stick is long enough to reach bottom of the tank. Ends of gauge stick are flat and not worn down. [280.43(b)(3)] Yes No Gauge stick is marked legibly and product level can be determined to the nearest 1/8 inch [280.43(b)(3)] Yes No MTG is used as sole method of leak detection for tank. Yes No MTG is used in conjunction with tank tightness testing. Yes No Are all tanks for which MTG is used 2,000 gal or less in capacity? [280.43(b)(5)] Yes No Operator or owner has access to correct tank charts to convert inches to gallons. Yes No Check One: Nominal Tank Capacity (gal) Tank Dimensions Monthly Standard (gal) Minimum Test Duration ( ) ( ) ( ) ( ) ( ) Year Month JAN FEB MAR APR MAY JUN Tank #1 550 551 - 1,000 1,000 1,000 1,001 - 2,000* Tank #2 Tank #3 Tank #4 Tank #5 NA NA 64" diam. X 73" length 48" diam. X 128" length NA Tank #6 Year Month JUL AUG SEP OCT NOV DEC Tank #1 5 7 4 6 13 Tank #2 Tank #3 36 hr 36 hr 44 hr 58 hr Tank #4 Tank #5 Tank #6 Are monitoring records available for the last 12 month period? Performing proper recording and reconciliation activities [280.43(b)(4)] Non-passing results reported and resolved in accordance with implementing agency's directions. [280.40(b)] NA Yes No Yes No Yes No Annual Release Detection Operability 1. Hand-held sampling equipment (gauging sticks, etc.) to ensure proper operation. Date: _____________ Y N Unknown NA 2. Does the owner/operator have operability test records for the last three years? Y N Unknown NA UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 18 of 24 Pages Initial/Date:JAH 3/1/23__ 2 Underground Storage Tank (UST) Inspector's Observation Report THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 7 Tanks, Toxics, and Pesticides Branch LCRD/TTPB 11201 Renner BLVD Lenexa, Kansas 66219 913-551-7216 Facility Name: Indian Country Mini Mart Agency Fac. ID _EPA-TrUSTd-2320__ No areas of concern or deficiencies were observed at the conclusion of this inspection. The above named facility was inspected by a duly authorized representative of EPA Region 7, and the following are the inspector's observations and/or recommended corrective action(s): Deficiencies or Areas of Concern Identified: Regulatory Citation Description 280.44a No function test for the ALDD in past 12 months (test performed on 4/12/22) 280.36 No annual walk-through for 2022 (Received after inspection 4/12/22) 280.40 (a)(3) No annual operability test for past 12 months (test performed on 4/12/22) 280.44 No line tightness test in past 12 months (test performed on 4/12/22) 280.45(b)(1) Failure to maintain 3 years of line leak detector function test documentation Actions Taken: Field Citation; # ___ Additional information required Inspection Deficiency Summary/Due date _ Notes: After end of inspection, I received the annual 2022 annual walk through, 2022 operability test, 2022 line tightness test, and the 2022 ALDD function test. Did not provide last 3 years of line tightness test results Name of Owner/Operator Representative: Name of EPA Representative: _____________See Original________________________________ (Please print) ____________________________________________________________ (Signature) Other Participants: ___________________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ____________See Original__________________________ (Please print) _______________________________________________________ (Signature) ______________________________________________________ (Credential Number) ______________________________________________________ (Title) Date of Inspection _________ Time __________ AM/PM UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 19 of 24 Pages Initial/Date:JAH 3/1/23__ Facility Name: Indian Country Mini Mart Additional Inspector's Observation Report Notes Agency Fac. ID: EPA-TrUSTd-2320 No Additional Notes UST Inspection Report USTREPORT-001-R07 v3.3/April 2021 Page 20 of 24 Pages Initial/Date:JAH 3/1/23__