DOW CHEMICAL U. 8. AREA CONSOLIDATED AUDIT PROGRAM
POWER II PLANT LOUISIANA DIVISION FINAL UPDATE OF THE ACTION PLAN
ACTION ITEM
OCCUPATIONAL HEALTH AUDIT
DUE DATE/STATUS
GENERAL INDUSTRIAL HYGIENE
1. Move the coffee pot in the warehouse.
COMP. Daigle 8/93
2. Complete 1992 I. H. Report GENERAL MEDICAL
COMP. Morrison 9/93
1. Procedure - Contact medical when an employee transfers into the block. COMP. Smith 6/94 RESPIRATOR PROTECTION
1. Update written respirator plan.
COMP. Morrison 12/93
2. Conduct monitoring for ceramic fibers. Include monitoring results in written report.
3. Add monthly SCBA inspection to C-9.
VENTILATION
COMP. Morrison 8/93 COMP. Morrison 10/94
COMP. Smith 12/93
1. Document weekly/quarterly checks of lab fume hood.
COMP. Morrison 1/94
2. Evaluate sandblast cabinet for cyclonc/dust collector.
COMP. Daigle 12/93
3. Post signs in warehouse associated with welding rods used. ASBESTOS
COMP. Morrison 8/93
1. Move the packing material to the designated storage area and dispose of any unnecessary
packing.
COMP. Daigle 10/93
2. Put a line on the floor disignating the boundry of the storage area and move the "Do Not
Sweep" sign to the floor.
COMP. Daigle 10/93
DO A 117536 CONFIDENTIAL
ACTION FLAN(COnt.)
REACTIVE CHEMICALS AUDIT
ACTION ITEM
DUE DATE/STATUS
1. Establish a procedure to purge the generators to 2% oxygen before reintroducing
hydrogen,
COMP Daigle 8/93
2. Review/amend disposal of fuel gas filters.
COMP. Morrison 11/93
3. Determine if syngas/fuel gas condensate are compatible with each other during
upsets.
COMP. Geoffroy 11/93
CHEMICAL EXPOSURE INDEX(CEI)
ACTION ITEM
DUE DATE/STATUS
1. Conduct 1 emergency drill simulating an in-block chlorine release at least once pre
year.
COMP. Smith 12/93
HAZARDOUS MATERIAL TRANSPORTATION REVIEW(HMTR)
ACTION ITEM
DUE DATE/STATUS
1. Give Hazcom training concerning chlorine.
COMP. Morrison 12/93
2. Give "First Alert" Training concerning chlorine cylinders.
COMP. Morrison 12/94
SAFETY AUDIT
ACTION ITEM EMPLOYEE TRAINING
DUE DATE/STATUS
1. Set goals for taking IPT modules.
COMP. Rozas 12/93
2. Schedule the writing and answers for IPT's.
COMP. Rozas 12/93
ACCIDENT/INCIDENT INVESTIGATION AND REPORTING
1. Become familiar with the "root cause" process.
COMP. Smith 10/93
2. Track accident/incident daa to determine needs for special emphasis.
COMP. Smith 10/93
DO A 117537 CONFIDFNTTA1
ACTION PLAN(cont.)
SAFETY AUDIT(cont.)
ACTION ITEM
DUE DATE/STATUS
SAFETY SUGGESTION SYSTEM
1. Consider implementing a safety suggestion program separate from the use of unsafe condition
report form.
COMP. Smith 8/93
AWARD/RECOGNITION SYSTEM
1. Re-evaluate the award program to encourage participation by more people. COMP. Smith 8/93 CONTRACTOR SAFETY
1. Develop checklist that documents the pre-job safety conferences including small
jobs.
COMP. Daigle 12/93
OFF THE JOB SAFETY
1. Develop a form that will track off-the-job safety. COMMUNICATIONS
COMP. Smith 12/93
1. Audit all forms of operational communications to insure their effectiveness. COMP. Rozas 12/93
AUDITS 1. Promote the cross-audit practice.
COMP. Smith 8/93
SAFE WORK PRACTICES
1. Establish guidelines and timetables for training operators on the 401 job procedures. COMP. Rozas 4/94
2. Consider documentation process to insure that all affected people stay up to date on changes in
procedures.
COMP. Rozas 4/94
ACTION PLAN(cont.)
ELECTRICAL RELIABILITY AUDIT
ACTION ITEM
DUE DATE/STATUS
1. Evaluate the need to rehabilitate the terminal enclosures, sandblast and paint
MP-1000(A&B).
COMP. Cooper 12/93
2. Evaluate the need to rehabilitate the tcnninal enclosures, sandblast and paint
P2-1 Syn Bus PT enclosure.
COMP. Cooper 12/93
3. Update grounding grid drawings to "as built". Show missing grounding wells as
grounding rods.
COMP. Cooper 12/93
4. Replace the broken well cover. 5. Reseal terminal connections.
COMP. Cooper 11/93
6. Repair/rehabilitate grounding wells having covers partially covered with concrete
and/or difficult to remove.
COMP. Cooper 11/93
LOSS PREVENTION AUDIT
ACTION ITEM
DUE DATE/STATUS
ELECTRICAL SYSTEM OPPORTUNITIES
1. The replacement of the Fuji bushing has begun. Bus 300 was completed in August 1993. All the synbus tie breakers should be complete by the end of the year. Two buses are scheduled during 1994. The final bushing replacement will take place in 1995. Syn Bus Tie Bkrs. Completed 1993, Bus 4, Bus 200 Completed 1996, Bus 400 Completed 1995, Bus 100 Scheduled 1996 - Craft
2. Cable bus overheating is being monitored. Plans are in progress to modify the existing cable bus system to allow more heat to escape. H-610 w ill require a new transposition section which has been ordered and is due to arrie in December. Additionaly, all the hot cable buses will have their cable bus covers raised. There are presently three cable buses that are overheating; H-402, H-610, and H-304. All three buses should be modified by the end of the first quarter of 1994. Completed 12/94. Glcichman
3. Modification to the relay protection system is in progress. The.required changes will be coordinated with plant outages to allow access to different buses. These changes will be on-going in conjunction w ith the Fuji bushing changes. 12/97. Craft
4. The station service transformers for 100/200 are on hold until better economic conditions exist due to high cost; Approximately $700,000. Scheduled completion date 8/97 Craft.
LOSS PREVENTION AUDIT
ACTION ITEM
DUE DATE/STATUS
FIRE PROTECTION OPPORTUNITIES
1. GT-300 louvers will be repaired at the next overhaul.
COMP. Cooper 7/94
2. The Power Tech Center will be contacted concerning hand held HALON fire extinguishers. COMP. Cooper 10/93
3. A champs work order was put into the system concerning "Update of the Power 2 Fire Protection Plot
Plan
COMP. Daigle 12/93
4. Power 2 will contact Fire Protection Department to schedule a meeting discussing a credible fire
scenario for Power 2.
COMP. Daiglcl2/93
FIRED EQUIPMENT OPPORTUNITIES
1. The thermocouple runback and trip requirements have been completed on GT-200. These changes will
be made on GT-100 during the next available outage.
COMP. Cooper 1/94
2. Vibration trip logic changes are in progress. The changes will require software programming upgrades to the tri-sen systems. GT-200 changes will occur during the first available outage of 1994. The vibration system for GT-100 will have to be upgraded before the changes can be implemented. The GT-100 vibration upgrade project has been approved and is scheduled for completion by the end of 1994. The vibration logic changes will be implemented with the upgrade. Complete 12/95. Glcichman/Craft
3. The compressor efficiency calculation program is due to be reviewed by the end of 1993. COMP. Geoffroy 12/93
4. Methods for monitoring generator shaft voltage are being investigated. Plans are to have a method in
place by the end of the first quarter 1994.
COMP. Cooper 2/94
5. Procedures for the checkout of relay trip circuits are being written by the distribution department as the
jobs come up. The procedures are provided to the plant for review prior to the start of the job. MOC also
require that procedures be written.
COMP. Taylor 3/94
A copy of the Tech Center audit questionnaire was included in the audit document file. COMP. Rozas 10/93
DO A 117540 CONFIDENTIAL
ACTION ITEM
DUE DATE/STATUS
CRITICAL INSTRUMENT OPPORTUNITIES
1. The critical instrument test procedures are in the process of being updated and is expected to be completed by the end of the first quarter 1994. GT-300/400 PROCEDURES COMPLETED. 100/200 PROCEDURES -COMPLETED 10/94. Glcichman
2. The failure of the tri-sen modules is currently being addressed with tri-sen. Tri-sen repair reports will now identify the component(s) which failed and whether it appears to have been caused by an external event which we can address and correct COMPLETED 12/1994. Gleichman
ACTION ITEM
DUE DATE/STATUS
CRITICAL INSTRUMENT RECOMMENDATIONS
1. Procedures are being updated to include testing from the sensing element through the operating device where possible. COMPLETED 10/94 Glcichman.
2. The procedures are being updated to include the proper settings for each instrument, as well as, the equipment l.D. COMPLETED 10/94 Glcichman.
EMBRCSNCY BLOC?. HALVES OPPORTUNITIES
Emergency block valves are manually operated during each extended outage to ensure that they ate working properly. In the future, these functional tests will be documented and any corrective actions
required will be noted. PROCEDURES FOR 300/400 BLOCK/ISOLATION VALVES ARE COMPLETE AND BEING USED. 100/200 PROCEDURES COMPLETED 10/94. Glcichman
WAREHOUSE STORAGE OPPORTUNITIES
Building 3703 warehouse will be repaired/demolished as soon as the economic picture gets brighter. BOARDS WERE ENCAPSULATED 10/94 - MORRISON.
PRESSURE VESSELS/RELIEF DEVICES
The recommendations outlined in the audit done earlier. A time schedule is being developed. COMP. Daigle, Johnson 10/93
FLAMMABLE MIXTURES
The procedure for purging and checking for oxygen depletion prior to putting the fuel gas lines back in
service on GT-100/200 is being developed.
COMP. Rozas 8/94
MANAGEMENT OF CHANGE
The MOC program has been reviewed to make it a more active program.
COMP. Rozas 10/93
Do A 117541 COhiF^OFNTl(^i
LOSS PREVENTION AUDIT ACTION ITEM INSURANCE PACKAGE
DUE DATE/STATUS
1, A "B" size scaled plot plan drawing will be obtained and included the F&EI calculation circles on it. COMP. Rozas 3/95
2. The insurance information form will be completed and reviewed with loss prevention, COMP. Rozas 3/95