Document d2RjqeEz7VE7Y8Y15N4EEjwe
TENNECOinter- off.ce memo CHEMICALS, INC.
To
From Subject
G.I. Rozand (2)
at Piscataway
W.C. Champion
at Burlington
VCM Personal Monitoring Charcoal Tube Measurements September, 1975
date October 7, 1975
COPY TO P.A. hobo F.X. Ritter
P.R. Scarito
* yj.T. Sweeney
F. Toca
File
- Burl. - Flem.
Dal Dat
Attached are the VCM personal monitoring results for the Flemington and Burlington Resin Plants and the Burlington Compound Plant, by job class ification, for the month of September, 1975.
Attachments WCC/jst
* \
/Is
f^ ry
013127
REMINGTON RESIN PLANT PERSONNEL MONITORING SUMMARY
PPM VCM BY CHARCOAL TUBE METHOD (15-Minute Sampling Period)
PER I OP: September, 1975
Job Cl ass i fIcation:
RESIN PLANT Shift Foreman Polymerization Foreman Reactor Operator Utility Operator Dryer Operator
0.7, 1.4 9.7, 0.8 1.2, 0.4, 1.5 0.2 0.4, 0.3
WAREHOUSE Warehouse Foreman
ND
Wa rehouseman
Bagqe r_______________________
MAINTENANCE Maintenance Foreman Maintenance Clerk Mechanic
ND ND 0.3, ND, 0.5
Q . C. LAB Q, C. Lab Supervisor
0.5
Q. C. Technician/Days Q. C. Technician/Shift Monitoring Analyst
26.7, 0.3 ND, 0.1
BOILER HOUSE
Boiler Lead Operator Boiler Operator
ND, 0.7, 0.4
*
Distribution: W. C. Champion G.I. Rozand J.T. Sweeney Q.C; File
*
013128
2
LOT PLANT
Pilot Plant Groi'p Leader
Pilot Plant Enqineer
PlTot Plant Technician
Pilot Plant Maintenance
0.6
ND, ND, 1.5 0.2
-------
---' "*
QUARTERLY R. & D. Personnel
QUARTERLY Office Personnel
4
38 ND, 0.1 ND, ND, ND, ND, ND, ND, ND, ND, 0.5, 0.8
013129
Name Leap, G. Snyder, K.
VCM PERSONAL^piTORING EXPOSURES 5 PPM AND OVER
PLANT_______ Flemington WEEK OF____ September '75
i
' Job Classification Poly foreman C)ual. .Gon. Technician
Date 9/19/75 9/13/75
Job Area
pulling Coppus hose out of reactor #9
Qual. Con. Lab Gow-Mac GC/rec. monomer sample in hood
Exposure prm, VCM
9.7
26.7
Breathing Air
-----O--------------------
---- ------------------------------
--ee--------------------
Distribution:
Rozand P.R. Scarito (Burlington)/J.T. W.C. Champion -- l_u--in------ - ~ *-
Sweeney (Flemington) ______________________________________
.
*
F.W. Kanzler RpvirpH 12/10/74
FLEMINGTON EIGHT-HOUR CHARCOAL TUBE TWA BY JOB CLASSIFICATION SEPTEMBER, 1975
Job Classification
Resin Plant
Polyforeman Shift Foreman Reactor Operator - charging Reactor Operator - dumping Reactor Operator - relief Utility Operator Diyer Operator Warehouse Supervisor Warehouseman Bagger
TWA
Ppm
1.1 2.6 0.9 1.0 1.3 1.0 0.2 0.2 ND 0.4
General Area
Maintenance Foreman Mechanic - shift Mechanic - day Lead Boiler Operator Boiler Operator Maintenance Clerk Effluent Man Quality Control Technician - day Quality Control Technician - shift Quality Control Supervisor
0.7 1.3 0.3 0.1 0.1 0.1 0.4 ND 0.1 ND
Group Leader Engineer Technologist Technician Maintenance Technician
Pilot Plant
0.3 0.3 0.3 0.6 0.2
Time in Air Mask
--
-- --
1.5 hours --
_
4 hours
_
_
M _
--
-
_
_
45 minutes
_
R. A. Lojewski 10/2/75
013131