Document byzxDgKV34jyK8qOv2Gq4yg8o
k J#4 i
i
inter-officc memo TENNEC0 CHEMICALS, INC
^ To P.R. Scarito from h.B. Carr
TCESubject Hess
At Burlington At Burlington
Oatc February 23, 1971
copy ro R.S.
E. I-I.P.. E.J. F.W. D.H. M.W. yFlle
Cole
Farber Horton Ilourihan Kanzler Weintraub Williams
On 2/23/71 Purchasing requested authorization to ship Hess TCE to the Burlington Plant. Hess is not an approved supplier but has previously been found to be acceptable by Analytical and Quality Control specification properties and by Polymeri zation Research's bottle polymerization studies of kinetics and resulting resin properties.
Purchasing's request was based on unavailability of an elec tronic grade (non-inhibited) TCE supplier to meet a 2/24/71 plant need. As E.J, Hourihan discussed with Production, Pur chasing was authorized to bring in the Hess TCE which would be evaluated for plant performance by P.E. and by P.E./Q.C. for resin properties.
Purchasing subsequently arranged for an approved supplier, how ever, the authorization to ship Hess TCE at a future date re mains open (D.H. Weintraub will advise on the timing).
\
HBC/jt
H.B. Carr
COLOR!TE 013715