last Chicago, Indiana September 16th, 1944
Ur. Frederick Laiat, Vice President International Smeltg. and Refg. Co. Room 1720 - 25 Broadway New York, New York
Dear Sir:
SUBJECT: Shite.lead Plant Operations September lat to 9th. Incl.
The following is a summary of operations at the White Lead Plant for the above period:
CELL ELECTROLYZING DATA;
Average Dally Operations
Amperage Total volts
D. C. current interruptions. Pit. Hrs. Average number cells in operation Lbs. White Lead per D.C.K.W. Hr.
3,574 130.4
47.35 3.7445
DEPARTMENTAL OPERATIONS
Days Operated per week
Call Room:
9
Filter:
9
Dryer:
8
Barrelling:
7
Average Production Tons per Dev 20.95 18.94.
18.94 15.29
Base white lead sales prise per pound, carload lots in barrels 8 l/4d
UBS:fs
t
Yours very truly.
S. W. StoSkdale Assistant General Superintendent