Document byveo2nMdqDk7jDLEJ1GBZMwD

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 1/21/2020 Water Brine - CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: Calgary Energy, LLC Mac No. 1 36.875702, -96.453638 (SW Sect. 28, T 28N, R 8E) Pawhuska, Oklahoma 74056 20565 East Clear Brook Rd. Owasso, Oklahoma 74055 Osage County 918-798-4511 Gary Lewis II GWLEWIS@LAMAMCO.COM FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A N/A N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn EPA 6 ECDWE Environmental Engineer EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2020.02.19 08:07:03 -06'00' Kent W. Sanborn GUY TIDMORE Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2020.02.28 10:18:17 -06'00' Guy Tidmore Date 28 FEB 2020 Date 6ENFORM-019-8 (10/31/2019) 1 Section I - INTRODUCTION Calgary Energy, LLC / Mac No. 1 Inspection Date: 01/21/2020 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Calgary Energy, LLC oil and gas facility located near Pawhuska, Oklahoma on 01/21/2020 for an unannounced inspection. There were no representatives of Calgary Energy, LLC present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION This facility is known as the Mac No. 1 tank battery. Section II - OBSERVATIONS I observed fluids, including oil, oil sludge, and produced water in the secondary containment pit during the inspection. I observed fluids seeping out the base of the berm on the southeast corner at the tank battery. There was minor surface damage outside the containment area from the releases. Section III - AREAS OF CONCERN The secondary containment berms were seeping and releasing fluids in the secondary containment area. Section IV - FOLLOW UP EPA water enforcement will conduct a follow up inspection in approximately 3 months and will refer this facility to EPA R6 SPCC program. Section V - LIST OF APPENDICES N/A 2 6ENFORM-019-8 (10/31/2019)