Kaiser Engineers* Weekly Field Activity Report
October 24, 1967 0. A. Finsand
iliddietown Construction 7100
Transmitted herewith is the .subject report for the week ending October 24, 1967.
OAF/sec
Distribution
Armco D. C. Osborne C. G. Kramer F. VI. Barnes T. R. Foley P. R. Smith D. Cox J. S. Lobs R. L. Brannamaa
Kaiser R. J. Wolf (Oakland) 17. F. Bort (Oakland) D, A. Daly F. X. Kast
J. 17. Irvin V, L. Frankson A. L. Gordon II. C. Boucher
cc: Central File Kaiser Reading Fils Armco Reading File
KEN 003876
KAISER ENGINEERS WEEKLY FIELD ACTIVITY REPORT Week Ending October 24, 1967
WEATHER:
Good weather prevailed during the period, temperatures slightly above normal with & cooling trend anticipated.
Client:
Anaeo_Ste>el Corporation
Locations Middletown. Ohio
Job Number: 6471
TEMPERATURE: Maartaun 73 degrees Minimum 33 degrees
JOB VISITORS
ft. J. Wolf, W. E. Burger, C. B. HLuemenfchal, J. F. Chajnowski N. ft. Gardner
SUMMARY FORCE REPORT
Hsnagsnut General Superviaien Field Ehgineering Wareha. & Mbl. Control Survey Office Srv. & Bepro. Clerical Craft *
TOTAL
Kaiser Engineers S&S3S/ESSttS&ODSScm Non-Bgcsot
53 16 3 47 25 43
2 19 16
_ l*52k
7$ 1,63S
Subcontractors
23 11
6 17 i*m 1,237
Foothill. gk&festo. Total
1 6 16 1
19 m
9 48
99 13 25
7 36
3^
746 3,696
* Average for week of zosa on payroll.
Average for week of crafts is as follows:
Kaiser Engineers
Subcontractors Foothill Electric
1,464
1,133 67D
Total Crafts Working 3,267
KEN 003877
/?v
WEEKLY FIELD ACTIVITY REPORT Week Ending October 24, 1967
CCMMBNTS
On Wednesday, October 18, a decision was made to send the stator halves (23 in all) for the 7 finishing mill motors back to the Westinghouse plant to correct the fault in the components. The responsibility for removal,, shipment, repair, return, and re assembly all rests with the Westinghouse Company. The necessary craft assistance by Kaiser Engineers and Foothill will be utilized as Westinghouse requires. A decision was also made that the crane operation would be handled by Armeo operators with the Kaiser Engineers or Foothill operator standing by for work other than the motor problem. The trucks by the way have been engaged by Westinghouse. The Equipment Trouble Report procedure ahan be used for this work with the time sheets being signed daily and material costs on a weekly basis. Westinghouse had promised a 28-day period of time for the repair of all 7 motors* The sequence of repair shall be Numbers 2, 4, 1, 6, 3, 5, and 7* There is a possibility that a single half may ship out Saturday, October 28, and three more are scheduled to ship out on Sunday, October 29* According to Westinghouse schedule, the two bottom halves of motor No. 2 should be repaired by 12 o'clock Midnight on Tuesday and returned to the jobsite on Wednesday. To continue the sequence, the repair of the two top halves of motor No. 2 would be accomplished Wednesday and Thursday, November 1 and November 2, etc., etc.
KEN 003878
3-
WESSLT FIETD ACTIVITY HEPOST Week Ending October 24, 1967
PBOJBCT FBOCBBSS
1. mLA - HCT STRTP HHL
1.1 Excavation and Backfill: 2,411 cubic yards of backfill was acccrcpli&ed during the period for a total to date of 892,976 cubic yards.
1.2 Concrete: 41 cubic yards of concrete was placed during the period for a total to date of 209,801 cubic yards. The period concrete consisted of the cap section for dewatering well #2 and grouting of tracks at Scale Fits 1 and 2 and grouting for the slab reject transfer car rails.
1.3 Structural and mg*y^ananpa Steel: A work force of 75 men continued through the period cn installation of miscellaneous steal in the Hot Strip mil- At colunn line 1, the rails for the slab reject car were installed, leveled and partially grouted during the period. Grouting will complete next period* The three slab transfer cars in the slab storage area are complete except for final electrical work an transfer car 1. Cars 2 and 3 are operable except for modifications on the cable reel. Delivery of these items is expected the week of November 6 which will allow these ears to be made fully operable and tested at that time. Installation of cover {dates over the steam trench near column line 1 continued during the period. All 8" bumper rail throughout the Hob ` Strip Hill is now collate. Installation of grating continued in the downeoiler area and in the conveyor area throughout tbs period. This grating work is 90$ complete. At the conveyor trenches between the Hot Strip Hill and the Green Coil Storage Building, the handrail installa tion is 955* conpiste and will finish next period. Progress was also ccntiaosd during the period on pipe and conduit protection shields in the flume, with two tons remaining. At Scale Pit 3, installation of handrail and grating continued in the pit area and erection of the drag conveyor structure continued through the period. This structure is now 955* complete. In the Boll Shop Area, installation of miscellaneous steel framing end some floor plate work at the roll stands was in pro gress during the period. An estimated 140 toss of miscellaneous iron remains to be installed in the Hot Strip Mill. This quantity axcGLudea eactans wurk carders. A study was completed this period on authorized work orders and new chows 62 tens of work in this category* work order items are anticipated, however.
At the Hot Strip Hill bag houses, electrical at bag houses 2, 6, 7 and 13 during the period. Bag homes 1 Is complete electrically and requires steam piping to the heating oolle. Big house 2 is 9(8* complete electrically bub requires abeam piping to the heater coils. Bag house 3 is complete and reedy for operation. Bag house 4 and 15 requires steam piping to the heater coils to complete these systems. Bag house 5 is piped up but requires minor electrical work before placing in operation. Bag houses 6, 11
KEN 003879
*0
.. . -IT-
HEMf FIELD ACTIVITY 2EB0BT Week Ending Qctobar 24, 1967
and 13 are not equipped with heater coils and will not require piping. Piping progress was not reported during the period an hag houses 7* 10, 12 and 14. At the finishing mill, the air conditioning system is complete except for a source of steam. In the douicoiler area, progress continued during the period on finishing the installation of the air conditioning units for the downcoiler director room and the coil con veyor director room. Duct insulation was coexisted at the coil con- *` veyor unit. Installation of grilles is remaining. At the boiler house control roan, the heating and ventilating fan is scheduled to arrive at the job site on October 31. Same instrumentation and water and steam connections to the unit are also required to finish this unit. At the scheduling office in the slab storage area, progress continued during the week on piping and instrumentation for ih* heating and venti lating unit and at the dose of the period the unit was made operational but lacks three damper* and ceiling grilles. This unit is scheduled to complete next pearled. The x-ray house heating and ventilating unit was completed during the pariod. At the clarification building, progress continued on the installation of instrumentation and electrical work far the heating and ventilating unit during the period. At the clarifier pump house, grilles were installed for the beating and ventilating system and instrumentation was started. 220 power is required for the dispatcher's office, recording room and the grease house beating and 1 ventilating units. This permanent source of power win be furnished by Foothill Electric.
1.6 Mechanical* Installation of mechanical equipment In the Hot Strip Hill continued in most areas during tbs period. Xh the fbrnace area, mechan ical cheek out waa initiated on the furnace charging table 12. This completes check out work on all furnace approach and charging tables. Mechanical work on the pushers is now complete except for test operations of tbs rams and tbs associated limit switch adjustments. The ftonace entry Aid installations will be aecagdiahed for furnace #1 next period as soon as the temporal? bride loading platform is removed. In the rougher area, rmwHIal work continued on tbs rougher 4 edgsrs far Halted Sbgineering. Tbs remedial work on rougher 2 and 3 are complete. In the fisUfcer area, progress was continued throughout tbs period on rework of tbs finishing sill main drive motors under the direction of Westinghouse. latest dsciatcns at the dose of this period required that the states, ooapmsnta for all main drive motors is the finishing area be rshiwkd to tbs Pittsburgh factory for eoasinsbion and check-out and than rstxanaid to the job Ate. The re-babbitted bearing for finishing mote*' $ was returned to the job site during the period and la presently be InAllied. Work continued during the period on nachlnlng of the quick rdl change rams for the finishers at the Axmco Machine Shop. 2h the dovncoiler and runout area, rework continued throughout the period on the runout table actor bases and actor installation was also continued. The signode coll bander installation was assembled and
KEN 003880
5--
1-nraKLT FIELD ACTiym HEF02T Week Ending October 24, 1967
leveled in place. At the ccdl conveyor system, drive and chain installa tion continued on all ccaveyors during the period. A revision entailing a reiabrlcation of seme items is being experienced at coil conveyor 6 because of chain interference at the radial turn for this unit. At Scale Pit 3, the vet scale removal system is in progress. Installation of roll components continued throughout the period. This work is being installed under the supervision of a vendor's representative. In the Boll Shop, installation of roll grinder 3 continued throughout the period. Grouting
of this unit is scheduled for next week.
Coupled tests were performed on the following equipment: charging tables 8, 9, 10, 11 and 12, inching drives 1 through 5, pusher 1 to the gear box only.' Uncoupled tests ware accomplished for the crop shea; system, the clarifier cooling toner pumps and the mill lev pressure water pumps. Check out continued by Westinghouso cn the. P50 and P550 computers in the B2 and. B6 areas throughout the period.
Piping: During the period, 10,369 feet of piping was installed for a total to date of 304,556 linear feet. 2,615 feet of this installed quantity was instrumentation . tubing. To date, 24,863 linear feet of instrumentation tubing has been installed and 2,737 feet of tubing renin* to be installed. 34,116 linear feet of piping remains to be i installed by Kaiser fareeo in the Hot Strip. Mill. Major piping systems worked on during the period were: greet#, high pressure descaling, mill water, fhel oil piping, plant air, natural gas, steam, heating and ventilating, boiler tool water, dovncoilsr airi and instrumentation. Pickling weaccnpleted during the period on lube oil 10. Jfcdro testing of hydreulie aystea 15 was also consisted during the period and hydro testing of hydraulic systen 16 is now in progress* Expansion joints for tbs suction aids of four of the five sump pta^s in sump pit 4 arrived during the period and are presently being installed. The fifth expansion joint is scheduled to arrive next week. At the hig: pressure descaling poops, tbs Union people are supervising clean-vp of tfao lubri cation system Including the gear boons for these units. This cleaa-qp work is expected to complete next period. Progress continued during the pviod on installation of the A air compressor at the puap house. Coolers for tibia unit have been set in place and related piping is also
1.8 Foothill SIsctrie Corporation installed 26,000 lbs. of exposed cnubrtt during tbs period for a total to date of 1,362,000 lbs. equal to IDOf ooeqplete of the current estimate at completion. 2,000 lbs. of ntaddsd conduit was installed for a total to date of 1,540,000 lbs. 51.000 fSet of lew voltage cable was installed for a total to date of 1.477.000 fset or 65$ complete. 600 low voltage cable terminations were
- coapletsd tor a total to date of 24,000. 57,000 feet of control cable was installed for a total to date of 1,579,000 feet or 65 complete.
KEN 003881
U2SET FXEED ACTIVITT HEFOSf tfeek Ending October 24, 1967
. 700 control cable terminations were completed during the period for a
total to date of 45,000 or 78$ ccsspLete. 10,000 feet of ccnprater cable was installed for a total to date of 715,000 feet or 76$ confute*
1,900 computer cable terminations were accomplished for a total to date of 25,200 or 84$ complete* 3,200 lbs, of conduit and 8,000 feet of wiring was installed during the period* 700 lbs. of structural ground ing was installed for a total to date of 131,700 lbs* or 98$ casplete.
1*9 Miscellaneous. Subcontracts* Bilbrqjr llasonxy have completed all major work items in their contract for the Hot Strip Mill facility. During the period, they accomplished punch list work items as required*
Moeschl-Edwards has completed installation of 67 rcGLI-up doors. Delivery of the last six doors is scheduled for October 27 and installa tion of those units will proceed immediately. All doors are scheduled
to complete by November 10.
Ifyron Cornish installed ceilings in the scheduling office Caspian and
the finishing office complex during tbs period. His progress remains-
intermittent pending requirements*
.?
Owens Coming FibergLaa continued throughout ths period with SwanTa*.^ of 165 lb* steam piping and insulation of lube oil systems in ths oil cellar* During ths period, 600 fast of steam piping was insulated for a total to date of 13,600 linear ffeet* 665 feet of condmsate piping was insulated in the oil cellar for a total to date of 2,382 feet. 1,150 feet or Morgoil system #1 was insulated during the period*
Delta Pipeline Contractors installed 2,215 fact of service piping during the pmried including 300 feet of drop piping for a total to date of 23,250 feet of header piping and 4,188 feet of drop piping to date and an overall total of 27,438 linear feet*
Salen-Broafiss completed the repairs to the damaged lintels on furnace 1 at the close of this period. This completion includes the rsbrlddng as well* Progpcaa was continued during the period on ths setting of the & ccahnsticB sir blower and #3 damper Installation* Befrsctory weak was oentinaad or the north wall of furnace #3 and the uptake area of furueoe #2 daring the period. Furnace piping was confined mainly to unfit 2 and 3 combustion air and gas piping to the burners*
Newso Electric contlnped with wire pulling and termination work to the diaper control panels cm ftaroaes 1 and 2* Painting of itarnaee #1 is now 35$ eoaplete. Insulation continued throughout the period cm steam, oil and air lines at furnace #1. This work is now 65$ complete. Fur nace #1 is 96$ complete, furnace #2 is 84$ complete and furnace #3 is 70$ couplets*
KEN 003882
WZSX2Z FIELD ACTITTH HEPOHT Week Siding October 24, 1967
Baboock and Wilcox continued with ihstallaticn of IJ>. and F.D. fans and valeted duet work throughout the period* The #3 IJ), fan rotor was this period. Insulation and tagging for the if1 ccatbustion air and gas duct system is in progress. The #1 IJ>. and FJ), fan system is in the final stages of construction and test operations for these units are scheduled to begin early in November. This fan and duct system contract is 86$ complete.
The Mo Piping (Contractor for the Waste Heat Boiler 2&n and over piping) completed the hydro testing of the 265 lb. steam pipelines in the Waste Heat Boiler Area, Hydro testing is in progress for tbs 425 lb. steam between the steam drum and the air heater. Hydro testing is also in progress on the compressed air and natural gas piping in this area. Pipe installation during the period consisted mainly of additions or changes resulting from Dravo Design modifications. This contract is now 96$ complete.
Norm Woolley (Contractor for the Waste Heat Boiler 2" and under piping) is 80$ complete. Essentially all remaining work required by this contractor involves extra work due to recent desigi changes. Woxk remaining consists of condensate piping, drains, sons treated water -? tie-ins and repairs to sens of the steam piping*
MimeapoUs-Bcnaymil (Instrumentation Contractor for the Waste Heat Boiler Area) continued throughout the period with instrumentation calibration and Installation in the Waste Heat Boiler Area* Tubing terminations oentinaed throughout the period* This contractor Is now 65$ cceqdete.
2. mi f\ - flfAB uttj.
2.1 Brcavat&en and Backfill* 5,877 cubic yards of backfill was completed during tbs period far a total to date of 206,150 outdo yards.
2.2 Concrete! 414 cable yards of concrete was placed diring the period for a total to date of 44,867 cubic yards. During the period, tbs concrete pours eansisted mainly oft scarfer flume fill ccnersbe Including walkway# crop oonrayur drive foundation slab at the east eod^pfystcnnsl tees at tbs north side of tbs crop conveyor, scarfer fliaes. earth wall to 8-line and mill aisle dLab 14.5a to 15.5a*
2,6 BUM aay Corporation continued during the pariod with nsohmical installation in the Slab Mill. Practically all major mechanical Items in the Slab Mill main aisle were worked on during the period* Progress continued on the two-high reversing mill facility.
KEN 003883
WE3SLT nm ACTIVEX REPOHT Week Siding October 24, 1967
ipiim--ti table motors for tables 4, 10, 11 and 13, the crop pusher, the
slab seals and the crop conveyor facility. Installation was also evi
dent cn other related equipment in this area. 396 tens of Mesta equip ment was received at the job site during the period for a total to date of 7,132 tons or 932> complete. Some iteras received during the period were the manipulator components, the spindle carriers and structural items far the skip hoist. The ingot receiving table 1 and the piler table 17 was grouted during the period.
2.7 Piningx Hunter (Piping Contractor for the Slab Hill) continued with an average work force of $6 men during the period. In the Slab Hill cdl cellar, progress ccastinued on the four lubricating oil systems along Idle west wall. Installation of water, steam and air piping was also Continued in this oil cellar during the period. Progress was maintained in the sain will aisle along column D ca the plant air, grease, caygai and natural gus headers including drops for plant air and natural ^us. This header system is now 93% complete. Along column B, the natural gas and coygen headers between column 1 and IS is near completion. Progress is also continuing on the undergrotmd piping in the Scale Pit Area. 230 feet of grease supply header piping and 55 grease joints for tables 2, 3 and 4 were installed during the period. Hunter has installed 11*495 linear feet of pipe to date. Total pipe to be installed remains at 36,000 feet.
2.3 eal: 4,000 lbs. of exposed conduit was installed for a total to data of 20,000 lbs. 5,000 lbs. of embedded conduit was installed for a total to date of 592,000 lbs. 300 feet of cable trey was installed for a total to date of 16,500 feet. 1,000 lbs. of conduit and 7,000 feet of conductor was installed during the period. 1,300 lbs. of structural grounding was installed for a total to date of 13,600 lbs. or 29$ com plete. An average work force of 90 electricians waa maintained in this area during the period.
3. MXsJNmkm
3*2 OgQgrjSgf 220 cubic yards of concrete was placed for a total to date of 27,99a Mdo yards. During the period, the concrete work consisted aalufe,eC:tbe T-line trench slab column 2.5 to 3*5, tbe east ingot buggy drdMMHpa ftnmdeticn end trade slab, and tbe Z-line loading dock and
3.3 3traHBaf aid HiaceHanecns Steal! 14 tons of structural steel was ereSeTar Ohio ralley during the period far a total to date of 4,195 tone. The ingot buggy track rails have not arrived at the job site but
are expected soon. Installation of track bed plates was initiated
during the period. Progress continued an tbe bolt-up of structural
--ibers far tbe expediter pulpit.
KEN 003884
tnssKLX pieu) Acnrar sepobc
Week Siding October 24? 196?
3*6 MSS&SttBll* Lcftus Engineering continued during the period with their full work ftrce in all phases of construction at the Soaking Pit facility. Brickwork ms continued at battery 4 on the archways sod collecting flue floors and walls. The recuperator pads were poured during the period at batteries 1 and 2. These batteries axe now ready for archway and collect ing fine refractory installation. Structural installation at batteries 3 through 6 is well advanced and involves mainly bolt-up and same bracing. Mezzanine deck plate installation is 9& complete. Conduit Installation
continued in the 4* 5 and 6 battery areas between actor oontrei centers and react# equipment. Limiting conduit in this area was also continued during the period. The insulated floor for the wasaanine motor room was
installed between ealnan 8.5 and 10.5 during tbs period. The coke oven gas and natural gas manifolds to the #5 and 6 battery burners is essen tially couplets and progress an manifold piping is continuing at batteries 3 and 4. Progress was also continued in the 5 and 6 battery areas on cooling water piping? damper installation? bosh drains? caabustlon air ard dilution air. Air piping to the cinder bell doors was initiated on battery 6.
3.7 rasing* No progress was evident in this area during the period because
Delta Pipeline Contractors were requested to remove their men for priority
in other areas. Progress by this contractor in the soaking pit buildag.
is scheduled to yawns on November 9.
3.8 Klectricalt Foothill Elsctria Installod 10?000 lbs. of exposed conduit for a total to data of 43,000 lbs. 100 lbs. of ewhodriod conduit was installed for a total to date of 65*500 lbs. or 85$ complete*
4. - basic grass sbqp
4.1 Sooevatico aadBackflllr 8,318 coble yards of excavation was cooplstsd during tha period for a total to Ate of 193*099 Abie yards. 8,310 cubic yards of backfill was acccaplinhed far a total to date of 229,004 cubio yards* Backfill week during tha period consisted mainly of subgrade preparation at tha S-Una dock and fmwiatinn backfill west of ealnen line 17. Thmarvatinn daring tha period was aoeoapUshad for tha trade hopper pit and tha tadameb stack sad fan foundation. .
4*2 2t odd* yards of oonereta was plaead for a total to date of
yards* Tha period concrete involved rcanlrvlng structure! la the 0 and 2-21ne area. AH structural steal piers are aid awaiting structural erection.
4.3 atrmtenal aad^KlaoalUneoas gteeli 26 tons of structural steal was ereetsd for a total to date of 2,090 tone for this project* Tha atructurel steel far this period aoneistad of one coTaan for the main Baade Oaygas Building indicating Initial structural steal erection for this major facility. 2,927 tana of structural steal has bean delivered to the Job site for the min Basie Oaqrgen Building to date.
KEN 003885
' - 20
~
ivpmr yisip actzvue hspqht Week aiding October 24, 1967
qiUUWBW
4A 13,240 sqaaro feet of aiding vas installed in the FloldProparation Iding for a total to data of 37*420 sqaaro feet.
3,000 square feet of roofing vas installed at this building for a
total to data of 66,040 sqaaro foot.
5. 71A5 ST5TPPEB BDHOIHQ
5*3 Structural and jsascellflneous Steal: 6 tons of structural stool vas erected Ibr a total to data of 829 tens. Bolt-up continued throughout the period on roof purlins and roof bracing.
5.6 Htwhanioal t Installation of ths overhead crane ty Ohio Valley Biggers vas initistsd during the period. At ths doss of ths period, tho trucks and aria girters vers erected in place.
6. ^iJ^..ilAl,71g?,,^Mrac^iiAH^i
6.1 Brcavatlcn and Backfill: Sons backfill, work vas evident in the Green
Coil Storage Building during the period. Bsckfm in this area is now
95% couplet#. Pile driving continued during ths period at ths #2 .
catenary pit on #4 piddLe lias. Bxcavaticu is bring acccnpliahed as#
required fur foundation work on pdLakls lines 4 end 5.
{
6.2 Ccacretfi 88 cabin juris of concrete vas placed in ths Pickls Idns facility for a total to dots of 6^32? cubio yards. 155 cubic yards of ccnarsb* vas placed along J-lins of ths Pickle Coil Storage Bonding for a total to dot# of 4,322 cubic yards. Grouting of all odnin on ths north laan-to piers vas ccspleted this period. Ths J-line vails das completed this period.
6.3 toss. At ths
Stesfo At ths Gram Cbil Storage Building,
eraotsd far a total to dots of 2,849 Call Stonge BbiTdtng, 38 tons of structural steel a total to date of 5CB tens. Fire roof trusses have sad all points along 8-Une are nos vested. Good
la this area oa structural steal erection* Groutoontlmed daring ths period at ths Grom Coil
ThtM colwnwe era 90$ grouted.
6,720 square feat of aiding vas installed at tbs Bonding fhr a total to data of 26,186 square feet, hat of roofing vas installed for a total to data of 103,800 At ths Pickle line Building, 860 sqtsve feat of riding vas installed far a total to data of 106,445 square foefc. 2,660 square feat of roofing vas installed for a total to data of 97,652 square fast. Pro gress vas rise eaqxrisnced on ths installation of roof vmtilatoxs at ths Gram Coil Storage Building during the period.
KEN 003886
UEBEXT PXSXD ACZZ7XTI HBPOST Ueek Briing October 24, 1967
6.6 Mwchanjealt Seme erection tea evident cn the fourth overhead exane
at the Green Coil Storage fttilding during the period} however, delivery of the oab fer the fourth crane is delegring final erection of this unit. This cab Is scheduled for delivery next period.
6.7 PiTdngt KcQrcw Construction Cfcrapaay continued their installation of soof
conductors for the Green Coil Storage Btailding. These roof conductors are 75% bcmplete.
6.3 Slectricelt Jh the Green Coil Storage Standing, installation of cable
tray ccntinued daring the period. This tray installation is now $dt
complete. & the Pickle line Building, electrical progress ccntinued
on cream 40$ and is 60d cooplete. DdLivory of the 13*8 switchgear
and the rectifier for the-Fickle Hue facility is scheduled on October
31, 1967. Progress was also continued at the Pickle Cell Storage
on Mgi bay n ghhjwg conduit, n gKf.fag miring
collector
rail support brackets. This electrical aerie is advancing with the
structural steel. The motor control center enclosure in the Green Coil
Storage Staining was erected and roofed-in. The motor control witmk
are dee set in place.
7. pmaisa
7Tfl " P^taiar Drita Pipeline Contractors reported no progress on this system during the period. Pinal cheek sot of the hydrogen, nitro gen and cote oven gas lines is still pending,
7110 - Ffltyjftrtrtlalifltf During the period. Dads and Siehl convicted all subsist1m enclosure fencing and personal gatee included in their contract. At the Halt Area switchstation, embedded conduit installation continued during the period. This work Is 90% complete. Setting of the 13.8 Kf nsitcbgnir sb this station is scheduled for nest period. Pro gress continued at the Stasis Oxygen Shop on underground oendnii work ocwiscting the switchgear station to tha 3 manhole inside the main building. At the cold flidd substation, ulra terminations are 95% oosplsts sad hi# pot testing use Initiated during the period. The undergomri eSsataiael dust mm from Its main sditetfan to tbs tsnaiinl towers ef^thsdeit Area power Una uaa cosplsfcsd this period. Trench basfcfpftjSllbe asscmplljfamt nest period.
711^^ifeidiiym end Site Deveaonmnte 15,206 cutis yards of excavation
was emgflMsd for * total to date of 663,735 outdo yards. 15,447 cubic yards of tsckfUl was accomplished for a total to date of 901,232 cubic yards. 13 satis yards of concrete was placed fbr a total concrete <jxantity of 993 cubis yards. Delta Pipeline Cenferaotera installed 120 feet of 12* oorrguted metal pipe in the Steelwaking Area during tha period. John B. Jurgeneen Company of Cincinnati has mat with our aubecatsaet engineers to dervelop a pro cirri aftnwtlnn schedule fbr the read paring requiremeite in the Bed Strip Hill Area, which is scheduled to proceed in the near future.
KEN 003887
WH FEB ACTIVITY SEFORt lfock Bodls* October 24, 1967
7113 - TgeckMMfkg During the period, DHS Corporation laid 1,464 feet of track cn the north side of the Pickle Zone Boil ding including three turnouts in this area. Ballast was installed at the Stripper
and on track north of the Pickle Line Building. 36,399 feet of trade has been Installed to date and the estimated trade to be installed Sae the entire project is 171,700 feet.
711A - Locker Boomer At the south area locker noon, interior masonry
work was essentially completed during the period. Progress continued cn building lifting and interior plumbing installations. Glaring vas in progrese during the period and is scheduled to complete nest week. Good progress was uainbained on overhead heating aid ventilating duct work as sell. In the Steeloaking Area, masonry wall installation continued throughout the period. The north and south exterior vails were coupleted and progress was trail along on block work at the anchanl ml equipment rocs bar the close of this period. The roofing and sculptured paneling are 75% complete.
7136 -Jfaafca Disposerfog tfaeJ'id&gJ^mtrt 1,14 cable yards of
excavation was ccoplsted for a total to date of 82,396 cubic yards, f
36 cable yards cf concrete was placed for a total to data of 346 cuhbf
yards. Progress continued during the period on foundation construction
fer the snin dlspoeal building*
?
OiF/eee
G. L. Boberts Construction Hunger