Document byRddYJNQjODyrDEQvV24RNnk

, Hi - ; iii .i ; i l; ill' ! \ ; ,i; Ite : iii !-U , : If .> it CHAPTER 19 UiaTaj sm..e.t.t ex tending /S' beyond cosing. 7bps of oil cpentngs at same mval Insulated with -ST space ar ccver*d y'tb mogtter sia. asbestos, or sand Inner liner-frorn top casing ring to 1 grate level base rmg ceX merited.-Atf ttyd \ Joint 1 .ayol Metal casing furnace foundation- or yI &xrfrt-eo--n-n-&--t-s---s--e---'-*->-------ti-rn--ic-c-o-k--m,---bc--ue--sm--t-i-be--ln-e--t-m-o--r-o--ot-e-t-h-r-t-e-a-r-l-h--u--e--------------- Fia. 3. Details op Furnace Bonnet, Casino, and Foundation (From NWAH & ACA Manual 5, Fourth Edition) Table S. Resistances of Warm Air Boot Combinations Expressed in Elbow Equivalents Warm Are Boot A B C D E F G H I 45-Deg Angle Boot and 45-Deg Elbow 90-Deg Angle Boot Universal Boot and 90-Deg Elbow End Boot Offset Boot 45-Deg Angle Floor Register--Second Story Offset Offset Support fojo/St or ^A\ cefhng- ^ z` or /ess. ad*r Sowet^f/- Damper fair space oft around pip* Fig* 4. Pitch upwards * jyr/nare perfoot/ Insulated withs _ ofa,rceHosbes1osP*f Alljoints taped with K asbestos paper 'right collar whenpipe posses thru unheated space. :, Gravity Warm-Air Furna Details of Bonnet and Leader of (From NWAH & ACA Manual 5, Fourth Edition) Gravity Warm Air Systems 457 Table 6. Warm Air Carrying Capacity, Btuh Delivered, First Story Registers Actual Length (Bonnet to Boot) Feet Combi nation No. No. ov Elbows 8 6H 7 4 6 8 1 4 6 8 10 12 14 4 6 8 10 12 14 16 18 m ' 4 6 8 10 12 14 16 18 20 22 1 2 :T 6,020 5,850 5,680 5,510 5,340 5,170 5,000 4,830 4,660 4,490 7,620 7,400 7,180 6,970 6.760 6,540 6,320 6,110 6,890 5,680 3 .1 9,400 9,140 8,870 8,600 8,340 8,070 7,810 7,540 7,270 7,010 4 13,350 12,970 12,590 12,210 11,830 11,450 11,080 10,700 10,320 9,950 5 1 17,520 17,020 16,530 16,040 15,550 15,050 14,550 14,050 13,560 13,060 ! .9 5,850 .5,660 5,490 5,330 5,160 5,000 4,840 4,670 4,510 4,340 2 7,360 7,150 6,940 6,730 6,520 6,320 6,110 5,910 5,700 5;500 3 2 *o 9,090 8,840 8,580 '8,320 8,060 7,800 7,550 7,290 7,040 6,780 4 'a 12,910 12,540 12,170 11,800 11,430 11,060 10,690 10,320 9,950 9,680 5 o 16,940 16,450 15,990 15,500 15,040 14,550 14,080 13,600 13,120 12,650 1 1 ' 5.620 5,460 '5,310 5,150 4,990 4,830 4,670 4,510 4,350 4,190 2 '<? 7,120 6,910 6,710 6,510 6,310 6,110 5,900 5,700 5,500 5,300 33 8,780 8,530 8,280 8,030 7,780 7,530 7,290 7,040 6,800 6,550 4 12,450 12,100 11,750 11,400 11,050 10,700 10,350 10,000 9,650 9,300 5 16,360 15,900 15;440 14,970 14,510 14,050 13,600 13,130 12,660 12,200 1 ----------g 5,420 5,260 5,110 4,960 4,800 4,650 4,500 4,350 4,190 4,040 2 a 6,860 6,660 6.460 6,270 M8C 5,890 5,690 5,500 5,300 5,110 4 8,460 8,220 7,980 7,740 7,500 7,260 7,020 6,780 6,550 6,310 . 12,010 11,670 11,330 10,990 10,650 10,310 9,970 9,630 9,290 8,950 5 a 15,770 15,320 14,880 14,420 13,990 13,540 13,100 12,650 12,200 11,750 5,240 5,090 4,940 4,790 L640 4,500 4,350 4,200 4,050 3,910 2 6.630 6,440 6,250 6,060 5,880 6,690 5,50C 5,320 5,130 4,940 3 5 bC 8,180 7,950 7,720 7,490 7,260 7,030 6.80C 6,560 6,330 6,100 & 11,610 11,290 10,950 10,620 10,300 9,970 9,640 9,320 8,990 8,660 5 15,250 14,800 14,380 13,950 13,520 13,090 12,650 12,230 11,800 11,370 Notes: Carrying capacity and length of run increased with basement depth. , Length 0f trunk and carrying capacity of gravity extended plenum installations should be based on the 8 ft basement depth capacities. Design Procedure The steps to be taken in designing a gravity warm-air duct system are: 1- Calculate the heat loss from each room as explained in Chapters 9, 11 and 12. 2- Prepare a layout showing (a) furnace, (6) chimney connection, (c) warm air registers (whether floor, baseboard or wall), (d) return air grilles. 3. Indicate on each warm-air leader (using symbols shown in Fig. 6): (a) whether fte room to be heated is on first or second story ; (6) the approximate length of leader P]pe in the basement; (c) the number of right angle elbows and equivalent elbows (Table 5) required, including the elbow at the boot connection (see Fig. 2); (d)' whether the register is to be located in the floor, in the baseboard, or in the wall. 4. Show the number and proposed locations of return-air grilles and the type of return-air system (see Fig. 5). 5. From Table .6, for first story, or from Table 7 for second story, select the comnation number for the warm air system which will supply the heat required to each room, with the number of elbows and length of leader pipe previously deter mined. Then, using the combination number as found, read directly in Tables 1, ' or 3 the leader, stack, and register sizes required. - From Table 8 select the combination number for the return-air system to cor respond with the Btu per hour serviced and the type of return-air system. Then m Table 4 select the duct and grille sizes, etc., corresponding this number. Select a furnace having a register delivery, in Btu per hour, equal to the total ' (ss from the structure.