Document byQrMBvLBrNOydKwVqXBwVVB1
VISTA CHEMICAL COMPANY ABERDEEN, MISSISSIPPI
A
HAZARD AND OPERABILITY STUDY
FOR
TC COMPLIANCE PROJECT
Jufy 1990
VAB.0001089207
VISTA CHEMICAL COMPANY ABERDEEN, MISSISSIPPI
HAZARD AND OPERABILITY STUDY FOR
TC COMPLIANCE PROJECT
A
DEPARTMENTAL APPROVAL:
PROJECT APPROVAL:
July 1990
VAB.0001089208
TABLE OF CONTENTS
A
HAZOF REPORT VOLUME
Legal Notice....................................................................................................... List of Abbreviations.................................................................................
1.0 Purpose.......................................................................................................................
i ii
1-1
2.0 Scope............................................................................................................................ 2--1
3.0 Methodology............................................................................................................
3.1
Introduction............................................................................................
3.2
Team Members............................................................................................
3.3
Documents made available............................................................
3.4
Forms used.................................................................................................
3.5
Preliminary hazard identification....................................
3.6
Criticality evaluation ............................................................
3-1 3-2 3-4 3-5 3-6 3-6 3-7
4.0 Mitigation Summary....................................................................................... 4-1
5.0 P&IDs........................................................................................................................... 5-1
APPENDIX A. Study Data Report............................................................................................
A-l
VAB.0001089209
LEGAL NOTICE
A
This report was prepared by VISTA Chemical Company ("VISTA") for internal use only. Neither Vista nor any affiliated organizations, nor any person acting in their behalf, (a) makes any warranty, express or implied, with respect to the use of any information or methods disclosed in this report; or (b) assumes any liability with respect to the use of any information or methods disclosed in this report
VAB.0001089210
UfiiE.Q
VISTA COMPANY CONFIDENTIAL Aberdeen
AHM ATMOS
BETWN
CHG CK CS CT
CW
CWR CWS
DHP
ELEC EQ ESD ETOH
FA FD FL FR FV
GA
H20 HAZAN HAZOP HC HDR HP
ID IMP INJ INSUL
LG LIQ LP LT
MAINT MATLS MAX MOC MOV MSDS
azardous Materials
Between
Charge Check Carbon Steel Cooling Tower Cooling Water Cooling water return Cooling water supply
Drum Handling Procedure
Electrical Equipment Emergency Shut Down Ethanol
Drum Feed Filter From Flow valve
Pump
Water Hazard Analysis Hazard & Operability Study Hydrocarbon Header High Pressure
Identification Implausible Injection Insulation
Liquid Low Pressure Level transmitter
Maintenance Materials Maximum Material of Construction Motor Operated Valve Material Safety Data Sheet
ii
VAB.0001089211
VISTA COMPANY CONFIDENTIAL Aberdeen
NAP NO
OPS OTP OVHD
P P&ID PG PIC PP
PRES PSH
PSV
REGS REV RO RV
s
S/D
SPEC
STD STM SW SYST
TA' S TCV TEMP THERM THRU
VCM VOC
Not a problem Normally Open
Operations Operator Training & Procedures Overhead
Pressure Piping & Instrumentation Diagram Pressure Gage Pressure Indicating Controller Diaphragm Pump Personnel Protective Gear Pressure Pressure Switch High Pounds per square inch gage Pressure Safety Valve
Regulations Revision Restriction orifice Relief Valve
Shut Down
Cracking
Standard Steam Service water System
Turn Arounds Temperature Control Temperature Thermal Through
Valve
Vinyl Chloride Monomer Volatile Organic Carbon
A
iii
VAB.0001089212
VISTA COMPANY CONFIDENTIAL Aberdeen
A
SECTION 1.0 PURPOSE
The VISTA Chemical Company (Aberdeen, Mississippi) TC Compliance Project Hazard and Operability (HAZOP) study was conducted to serve many purposes. It will be used to:
Provide management with the knowledge of where potential hazards exist in the TC Compliance modifications.
Provide safety and operations related documentation for lines and pieces of equipment included in these modifications.
Provide a prioritized basis for subsequent risk analysis/assessment work, if necessary.
Provide documentation for a Risk Management and Prevention Program.
Provide training on HAZOP methodology and techniques for Vista personnel.
Performing a HAZOP study is generally an assurance that if procedural and/or engineering modifications are implemented to mitigate risk, the plant will then be operating under some lower risk. It is not, however, a guarantee that no risk exists, nor does it guarantee that hazardous events or operating problems will not be encountered.
1-1
VAB.0001089213
BgCTIOM 2.0 SCOPE
VISTA COMPANY CONFIDENTIAL Aberdeen
Vista Chemical Company operates a nominal capacity 445 million pound per year FVC plant located in Aberdeen, Mississippi. The plant polymerizes VGM in batch reactors to produce FVC.
The TC^B^friance project for the Aberdeen plant is the subject of thiA HAPOLjstudy. The project includes:
- The Cleanwall Injection System - The Batch Hater Stripper Dump Modifications -- The Low Mole Reactor Jacket Cooling Modifications
The hazard identification study focused on the following potential hazards:
Personnel injury/death resulting from Feie ^ire Explosion Toxic exposure Chemical Contact Thermal Burns Asphyxiation Impact injury Etc.
Equipment/property damage resulting from Fire Explosion Corrosion Misoperation Overpressure Vacuum Overheating Etc.
Production loss resulting from Equipment damage Maintenance Off specification Turn arounds Raw Material Considerations Etc.
Environmental Spills Fugitive Emissions Haste Hater Excursions Etc.
The HAZOP methodology used during the study is contained in Section 3, the mitigation for the critical identified hazards is contained in Section 4, and the criticality sort/data base is contained in an Appendix.
2--1
A
VAB.0001089214
3.1 Introduction 3.2 Toast Members 3*3 Documents Made Available 3*4 Forms Used 3*5 Preliminary Hasard identification 3.6 Criticality Evaluation
3-1
VAB.0001089215
SECTION 3.1
A
A Hazard and Operability (HAZOP) study is a simple, yet structured methodology for hazard identification. It is an investigation technique which utilizes imaginative thinking in the identification of hazards and operational problems.
A HAZOP study involves a systematic, methodical examination of design documents that describe the facility. The study is performed by a multidisciplinary team to identify potential hazards or operability problems that could result in an accident. Deviations from the design value of key parameters are studied using guide words to control the examination evaluation. This presumes that the design values of flows, temperatures, and other process variables are inherently safe and operable. The study team consists of trained personnel knowledgeable in the technology and operations, and the team will have the necessary technical expertise to answer most questions raised during the review without outside assistance.
As a starting point, we will define the following terms:
Hazard: Anything (chemical reaction, equipment malfunction or operator error) that can lead to an unwanted event.
Operability: Anything that causes the operator to improvise in his actions.
These definitions are an important part of the basic HAZOP premise that the process does not have inherent hazards or operating problems when the unit is operating within design parameters as defined by the basic documents such as the Process Flow Diagrams, equipment specifications, operating procedures, etc. In other words, if there are no deviations from the expected norm, by definition there are no hazard or operability problems.
When performing a HAZOP, a proper mix of meeting participants is very important. The mix of participants should normally include most if not all of the following:
Team leader Process engineer Mechanical engineer Plant operator Maintenance
Electrical Safety Team recorder Instrumentation
3-2
VAB.0001089216
A
Of these personnel, many are often only part time participants but remain on call for assistance. It can be seen that the electrical, maintenance and other subjects may only be required on a consulting basis. Also, it is important to keep the size of the review team to a manageable number such as between five to seven so that all members of the team can participate while keeping the effort moving.
The agenda followed during the HAZOP team meetings is as follows:
' Introduce team members: A short biographical sketch by each team member.
3 HAZOP methodology: A presentation is made by the team facilitator of the methodology to be used in the study. This also establishes the team member "mind set" necessary to conduct an effective HAZOP.
4 AHM properties: An identification and discussion by an industrial hygienist or other knowledgeable person is presented to establish a team recognition of the AHM toxic and hazardous properties.
Identify hazards: A preliminary identification by team members of hazards present within the process. This serves to focus the HAZOP study.
Z. Purpose or goal of HAZOP: A general presentation of the purpose or goal of the HAZOP is made. This serves to direct the HAZOP study.
Scope the HAZOP: Once the AHM properties are established and discernible HAZOP hazards are identified, the HAZOP scope is set.
Establish criticality and frequency ratings: Hazard classification matrix parameters are set by the team for subsequent screening of HAZOP identified hazards.
Define dispersion models: The team identifies AHM release scenarios which will be different cases for dispersion modeling outside of the HAZOP team meeting.
Process description: A detailed process discussion is presented by the Process Engineer to familiarize the HAZOP team with process scenarios which may lead to a hazardous condition as well as to ensure that all team members have a clear understanding of the basic process.
PCHAZOP* on-line: Load the PCHAZOP* computer program for recording HAZOP team proceedings.
HAZOP team meetings: A systematic segment by segment team review of the facilities contained within the job scope is executed.
HAZOP report: A formal report is prepared by the team facilitator, reviewed and commented by the other members, and then becomes a permanent record of the team meetings. Guidelines are presented later in the chapter for report
3.3
VAB.0001089217
A
The HAZOP identified thirteen (13) critical ranked potential hazards:
One (1) with a criticality rank of 1, i.e., those which must be improved
Thirteen (13) with a criticality rank of 2, i.e., those which should be improved.
Suggested mitigation for the critical ranked hazards is covered in Section 4.0.
The HAZOP identified five (5) non-critical ranked hazards which require verification that the appropriate engineering and/or administrative controls are in place.
The team identified no hazards of the most critical ranking, that is a hazard rated I-A, i.e., a hazard which could potentially cause A LOST TIME ACCIDENT more often than once per year. In the event the HAZOP team did identify a hazard that it considered to represent an imminent danger to life or property, the team would have given a verbal presentation to plant management in order to expedite any required mitigation.
SECTION 3.2 TEAM MEMBERS
The HAZOP study team assembled to identify potential hazard or operability problems should be composed of a multiple disciplined team with the sufficient technical expertise to answer most guide word deviation questions without resorting to further expertise.
The HAZOP study team meetings were held at the VISTA plant site in Aberdeen, Mississippi. The team members conducting the HAZOP study on the VISTA Chemical Company TC Compliance Project are as follows:
ATTgyPBg
COMPANY
EXPERTISE/RESPONSIBILITY
Nathaniel Wilson* Craig English* John Wright* Doug Knittig* Sherry Ingwerson* Dale Nawrocki* Pete Schirber* Dave Moore^^r Dale Andrews* Steve Hillman# William Early*
VISTA VISTA VISTA VISTA VISTA VISTA VISTA VISTA VISTA VISTA Stone & Webster
* = full time # part time
Operations Electrical Process Engineer - Houston Process Engineer Project Engineer Process Engineer * OKC Process Engineer - Houston Process Engineer Instrument Technician Process Engineer
Trainer/Facilitator
3-4
VAB.0001089218
Prior to the start of the HAZOP, the necessary reference documentation needs to be assembled and made available for use and reference during the HAZOP team study. A meaningful HAZOP study cannot be conducted without the required documentation to review. Assembly of the documentation optimizes the chance for a successful HAZOP. The documents used in this study were:
Cleanwall Injection Project - Class "A" Design, April 11, 1990.
Batch Water Stripper Modifications project - P&ID.
Reactor Jacket Cooling Modifications Project - P&ID.
3-5
VAB.0001089219
SECTION 3,4 FORKS USED
A
The HAZOP team data was recorded on standardized forms containing the key questions and answer elements of the HAZOP; one form for each line segment investigated, one form for each equipment item investigated
The results of the HAZOP studies were recorded on the SWEC proprietary computerized program "PCHAZOP", which is a PC based program designed to provide a simple method for recording and documenting the HAZOP process. The program is designed to run in a database environment to facilitate data storage and retrieval.
The results of the HAZOP studies are included in the Appendix sorted according to equipment number or line segment.
SECTION 3.5 PRELIMINARY HAZARD IDENTIFICATION
During the initial stage of the HAZOPs, the team should prepare a preliminary list of potential hazards likely to be encountered during the study. This serves to establish the team's mind-set in hazard identification and focus attention during the study.
The preliminary hazard identification yielded the following five hazards:
Impact - from a fall or from contacting rotating heavy machinery potentially causing physiological injury and or death. Fire - resulting from the ignition of a flammable material potentially causing physiological injury and or equipment damage. Explosion contained - resulting from the ignition of an explosive mixture within a vessel potentially causing physiological injury due to the overpressure wave, thermal radiation, or missile fragment projectiles uncontained - resulting from the ignition of an explosive mixture such as a vapor or dust cloud potentially causing physiological injury due to the overpressure wave, or thermal radiation. Thermal burn - resulting from the contact with a hot or cold material potentially causing physiological injury due to thermal stress. Toxic exposure - resulting from personnel exposure to an acutely hazardous material potentially causing physiological injury and or death.
3-6
VAB.0001089220
During the initial stage of the HAZOPs, the team should develop a criticality rating and a probability rating for preparation of a hazard ranking matrix. This is to allow screening of identified hazards by prioritization and sorting to focus subsequent corrective action on the significant identified hazards; eliminating the insignificant or trivial hazards from any further consideration.
To this end, a hazard rating index and a risk ranking matrix was developed in the HAZOP team review as follows:
HAZARD RATING INDEX
Criticality Rating
I Major
An incident which may result in a possible lost time injury, or a reportable VCM release, or major damage or production loss greater than $1,000,000
II Severe
An incident which may result in a restricted work case, or a VCM release, or severe damage or production loss between $50,000 and $1,000,000
III Moderate
An incident which may result in a recordable injury, or moderate damage or production loss between $10,000 and $50,000
IV Slight
An incident which may result in slight damage or production loss less than $10,000
Frequency Rating
A Frequent
Expected to occur frequently in the life of a single plant, i.e., may occur more frequently than once per year
B Probable
Expected to occur in the life of a single plant, i.e., may occur between 1 and 100 years
C Occasional
Could occur in the life of a single plant but expected to occur once in the life of multiple plants, i.e., may occur between 100 and 10,000 years
D Remote
Unlikely to occur in the life of multiple plants, i.e., may occur less frequently than once per 10,000 years
3-7
VAB.
RISK RANKING MATRIX
Frequency
ABC
D
A
The risk ranking codes assigned to each grid of the risk ranking matrix are as follows:
Risk Ranking
1 Unacceptable
Mitigation planning should be completed within six months using engineering and/or administrative controls to reduce the risk ranking to a 3 or less.
2 Undesirable
Mitigation planning should be completed within twelve months using engineering and/or administrative controls to reduce the risk ranking to a 3 or less.
3 Acceptable With Controls
Should be verified that procedures or controls are in place
4 Acceptable as is
No mitigation action required
VAB.0001089222
II
SECTION 4.0 SECTION 4.1
MITIGATION MITIGATION SUMMARY
A
Risk Code l-A No references siftod.
Risk Code l-B
One reference sifted*
Item 1
Static charge due to inadequate grounding of Bus drum fire and possible explosion resulting in personnel injury.
- see page 1
Risk Code ll-A
No references wnrL
ITEMS WITH CRITICAL RANK OF 2 Risk Code l-C
No references
Risk Code ll-B
Two references
Item 1
Wrong material fed to BUS tank due to mix up by supplier or warehouse resulting in contaminated BUS and possible off-spec and/or lost production.
- see page 1
4-1
VAB.0001089223
V
Risk
Item 1 Item 2 Item 3 Item 4 Item 5 Item 6
Catastrophic failure of BUS reactor inlet lines due to vibration or impact resulting in VCM release and personnel exposure.
- see page 2
A
Increased BUS drum pressure and/or temperature due to an external heat source resulting in rupture and possible personnel exposure.
- see pages 1,2
Low or no flow and possible high pressure in feed line to BUSS tank due to blocked line, closed valve, plugged filter, failed pump, or empty drum resulting in possible loss of production.
- see pages 3,4,5,6
Low or no flow in BUSS supply lines to the reactor areas due to blocked line, failed instruments, plugged filter, failed pump, or failed meter resulting in possible loss of production.
- see pages 7,8
Modicon failure for BUSS supply line interlocks due to power failure or hardware problems resulting in possible loss of production.
- see page 9
Improper maintenance of pump and filter in BUSS supply line to the reactors resulting in possible personnel exposure.
- see page 10
Improper maintenance of BUSS injection nozzles resulting in loss of production, contamination, or personnel exposure.
- see page 11
4-2
VAB.0001089224
SUMMARY 07
PAGE 18 I--A
4-3
VAB.0001089225
SUMMARY OF
PAGE 1: I-B
VISTA TC COMPLIANCE PROJECT
CRITICAL RANXX
1, CRITICAL MUST BE IMPROVED MAJOR CONSEQUENCE PROBABLE OCCURRENCE
DEVIATION:
STATIC CHARGE
EQUIPMENT NUMBER: HM-101/102-E-A13
EQUIPMENT DESCRIPTION: BUS FROM DRUM TO TK-021
CAUSE:
FAILURE TO GROUND DRUM/LINE
CONSEQUENCE: FIRE EXPLOSION, PERSONNEL INJURY
SUGGESTED MITIGATION: SUGGEST REVIEW OF GROUNDING PROCEDURE AND OTP
RESOLUTION:
COMMENTS:
4--4
VAB.0001089226
4
A
SUMMARY OF
PAGE 1: IZ-A
4-5
VAB.0001089227
fi'
SUMMARY 07
PAGE 1: I-C
CRITICAL RANK: I C
DEVIATION l
2, UNDESIRABLE - SHOULD BE IMPROVED = MAJOR CONSEQUENCE s OCCASIONAL OCCURRENCE
N-O-N-B F-O-U-N-D
A
4-6
VAB.0001089228
SUMMARY OR
PAGE 1: II-B
VISTA TC COMPLZAMCX PROJECT
CRITICAL RANK:
2, UNDESIRABLE - SHOULD SEVERE CONSEQUENCE PROBABLE OCCURRENCE
DEVIATIONS
WRONG DRUM OR MATERIALS
EQUIPMENT NUMBERS BUS DRUM
EQUIPMENT DESCRIPTIONS
55 GAL DRUM
IMPROVED
CAUSE S
MIX UP IN WAREHOUSE WRONG MATERIAL DELIVERED TO PLANT
CONSEQUENCE S CONTAMINATED BUS TANK, LOST PRODUCTION
SUGGESTED MITIGATIONS
SUGGEST REVIEW 07 DRUM HANDLING PROCEDURES AND MATERIAL ID/CONFIRMATION
RESOLUTIONS
COMMENTSS
VAB.0001089229
SUMMARY OR
PAGE 2: II-B
4-8
VAB.0001089230
SUMMARY 07
PAGE 1: III-A
CRITICAL RANK: III A
2, UNDESIRABLE - SHOULD BE IMPROVED = MODERATE CONSEQUENCE = FREQUENT OCCURRENCE
DEVIATZON:
INCREASED PRESSURE
EQUIPMENT NUMBERS BUS DRUM
EQUIPMENT DESCRIPTION:
55 GAL DRUM
CAUSE:
EXTERNAL HEAT SOURCE
1
I
j I
I
CONSEQUENCE:
POSSIBLE PERSONNEL EXPOSURE
j
SUGGESTED MITIGATION:
8UGGEST REVIEW OF DRUM HANDLING PROCEDURE, OTP, AND PPG
| RESOLUTION:
-------------------------------------------------
t
. .. - .
j comments:
4-9
VAB.0001089231
SUMMARY OF
PAGE 2: IIX-A
4-10
VAB.0001089232
V
SUMMARY OF
PAGE 3: III-A
CRITICAL RANK DEVIATION S
VISTA TC COMPLIANCE PROJECT
2, UNDESIRABLE - SHOULD BE IMPROVED III = MODERATE CONSEQUENCE
A = FREQUENT OCCURRENCE
NO FLOW
EQUIPMENT NUMBER: HM-101/102-E-A13-1
EQUIPMENT DESCRIPTION: BUS FROM DRUM TO TK-021
CAUSE:
VALVE CLOSED FILTER PLUG PUMP FAILURE DRUM EMPTY LINE PLUG
CONSEQUENCE:
LOSS OF FLOW POSSIBLE LEAKAGE AND PERSONNEL EXPOSURE
SUGGESTED MITIGATION:
8UGGEST REVIEW OF OTP, SUGGEST PRESSURE GAGES EITHER 8IDE OF FL--045
NOTE: PG1S ADDED TO PI&D
RESOLUTION:
COMMENTS:
4-11
VAB.0001089233
SUMMARY OF
PAGE 48 IXI-A
4
4-12
VAB.0001089234
SUMMARY 07
PAGB 51 III-A
4-13
VAB.0001089235
SUMMARY OF
PAGE 68 III-A
4-14
VAB.0001089236
SUMMARY OF
PAQB 7
XII-A
CRZTZCAL RANK DEVIATION 8
ZSTA
COMPLIANCE PROJECT
UNDESIRABLE
SHOULD BE IMPROVED
MODERATE CONSEQUENCE
FREQUENT OCCURRENCE
NO FLOW
EQUIPMENT NUMBER:
HM--104/105/106/107
EQUIPMENT DESCRIPTION! PP-143/44 TO REACTOR AREA
CAUSE 8
BLOCKED LINE PUMP FAILURE METER FAILURE INSTRUMENT FAILURE PLUGGED FILTER
CONSEQUENCE 8
LOSS OF PRODUCTION
SUGGESTED MITIGATION SUGGEST REVIEW OF OTP
RESOLUTION:
COMMENTS:
4-15
VAB.0001089237
SUMMARY OF
PAGE 8: III-A
VISTA TC COMPLIANCE PROJECT
CRITICAL RANKS
Z, UNDESIRABLE - SHOULD BE IMPROVED
3C H MODERATE CONSEQUENCE
| A s ntEQOHR OCCOKREMd
DEVIATIONS
REDUCED FLOW
EQUIPMENT NUMBERS
HM--104/105/106/107--8
EQUIPMENT DESCRIPTION: PP--143/44 TO REACTOR AREA
RESOLUTION 8 COMMENTS:
4-16
VAB.0001089238
SUMMARY OF CRITICAL IDENTIFIED HAZARDS
PAGE 9: III-A
VISTA TC COMPLIANCE PROJECT
CRITICAL RANK:
2 , UNDESIRABLE - SHOULD BE IMPROVED
III = MODERATE CONSEQUENCE
A = FREQUENT OCCURRENCE
DEVIATION :
KODICON FAILURE
EQUIPMENT NUMBER:
HM--X04/105/106/107--8
EQUIPMENT DESCRIPTION: PP--143/44 TO REACTOR AREA
CAUSE:
LOSS OF POWER HARDWARE PROBLEMS (I/O, CPU, ETC.)
CONSEQUENCE:
LOST PRODUCTION
SUGGESTED MITIGATION: SUGGEST REVIEW OF RE8PONSE PROCEDURES AMD VERIFY PERIODIC UPS CHECKS
I RESOLUTION:
COMMENTS:
4-17
VAB.0001089239
SUMMARY OF CRITICAL IDENTIFIED HAZARDS
PAGE 10:
III-A
CRITICAL RANK DEVIATION:
VISTA TC COMPLIANCE PROJECT
UNDESIRABLE
SHOULD BE IMPROVED
MODERATE CONSEQUENCE
FREQUENT OCCURRENCE
MAINTENANCE
EQUIPMENT NUMBER:
HM-*104/105/10 6/107
EQUIPMENT DESCRIPTION: PP-143/44 TO REACTOR AREA
CAUSE:
PUMP FILTER
CONSEQUENCE:
POSSIBLE PERSONNEL EXPOSURE
SUGGESTED MITIGATION:
SUGGEST REVIEW OF MAINTENANCE
PARTS STOCKING .PPG
//
RESOLUTION:
COMMENTS:
4-18
VAB.0001089240
9
SUMMARY OF
PAGE ll: III-A
VISTA TO COMPLIANCE PROJECT
CRITICAL RANK: III
UNDB8IRABLS
SHOULD BE IMPROVED
MODERATE CONSEQUENCE
FREQUENT OCCURRENCE
DEVIATION:
MAINTENANCE
EQUIPMENT NUMBER:
HM-111-120
EQUIPMENT DESCRIPTION: BU8 REACTOR INLET LINES
CAUSE:
PLUGGED NOZZLE
CONSEQUENCE:
PRODUCTION LOSS CONTAMINATION PERSONNEL EXPOSURE
A
SUGGESTED MITIGATION: SUGGEST REVIEW 07 OTP. MAINTENANCE PROCEDURES
RESOLUTION:
COMMENTS:
4-19
VAB.0001089241
SUMMARY OF HAZARDS
PAGE l:
II-C
4--20
VAB.0001089242
SUMMARY OY
PAGB 1: III--B
CRITICAL RANKS
in
B
DEVIATION:
3, ACCEPTABLE - WITH CONTROLS
= MODERATE CONSEQUENCE = PROBABLE OCCURRENCE
REDUCED TEMPERATURE
EQUIPMENT NUMBERS
HM-111--120
4-21
VAB.0001089243
SUMMARY 07
PAGE 2: III-B
CRITICAL RANK: DEVIATION:
VISTA TC COMPLIANCE PROJECT
ACCEPTABLE WITH CONTROLS MODERATE CONSEQUENCE PROBABLE OCCURRENCE
FILTERS (300, 400) OMITTED
EQUIPMENT NUMBER
WX-130/139-E-A13
EQUIPMENT DESCRIPTION: WATER FLUSH LINE
CAUSE:
CARBON STEEL LINE
CONSEQUENCE:
CONTAMINATED RESIN, PLUGGED NOZZLE
A
SUGGESTED MITIGATION: REVIEW THAT ALL CS LINES HAVE FILTERS
RESOLUTION:
COMMENTS:
4--22
VAB.0001089244
SUMMARY OF
PAGE 3: III-B
__________________________B a PROBABLE OCCURRENCE_______________________________
DEVIATION S
NO FLOW
1
EQUIPMENT NUMBER:
SK--139/148-H-A13
1
EQUIPMENT DESCRIPTION:
STEAM LIMES
1
4-23
VAB.0001089245
SUMMARY 07
PAGE 4: III-B
CRITICAL RANK: DEVIATION:
VISTA TC COMPLIANCE PROJECT
ACCEPTABLE
WITH CONTROLS
MODERATE CONSEQUENCE
PROBABLE OCCURRENCE
NO PLOW
EQUIPMENT NUMBER:
WC-100/109
EQUIPMENT DESCRIPTION: CWS TO MIDDLE OF JACKET
CAUSE :
CLOSED VALVE COOLING WATER OFF PLUGGED LINE
CONSEQUENCE: POSSIBLE BUILD-UP AND CONTAMINATION
LOSS
SUGGESTED MITIGATION: SUGGEST REVIEW OF VALVE LOCKING PROCEDURE
RESOLUTION:
COMMENTS:
4-24
VAB.0001089246
SUMMARY Or
PAGE 5
CRITICAL RANXX DEVIATIONS
VISTA TC COMPLIANCE PROJECT
ACCEPTABLE
WITH CONTROLS
MODERATE CONSEQUENCE
PROBABLE OCCURRENCE
INCREASE FLOW
EQUIPMENT NUMBER:
WC-100/100
EQUIPMENT DESCRIPTION: CWS TO MIDDLE OF JACKET
CAUSE:
OPEN GLOBE VALVE
CONSEQUENCE:
LONG HEAT-UP TIME TEMPERATURE CONTROL PROBLEMS CW CAP. PROBLEMS
SUGGESTED MITIGATION:
RESOLUTION COMMENTS:
VAB.0001089247
VAB.0001089248
VAB.0001089249
VAB.0001089250
From __________________________________
Calculation $htt
COOLING^
water
RETURN
COOL tNG__ jij
WATER
SUPPLY
Mu *
- />
" O'bo^.
ffT r
(i*C
~ bj*Ur<x Uh^
" V*I
\4
01 Lo
Lt C-Cfciv o<W
ryv
* 2- >/<(*. "ic 4*~ (^IwWfctJl
Vtfh'tii b*<i'Uir+>
STEAM
CO TJ
O 7) 8*
SO
VAB.0001089251
Page NO. 07/24/89
1
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Risk Code
1131
Criticality Equip ID & Frequency Equipment Description
B13S1XSESSC1 IXllBXlEXllSlllIlllBEZl
P&ID
Deviation Description
Caused By; Consequences:
BUS DRUM 55 GAL DRUM
BUS DRUM 55 GAL DRUM
BUS DRUM 55 GAL DRUM
2
III - A
BUS DRUM
55 GAL DRUM
2
III - A
BUS DRUM
55 GAL DRUM
BUS DRUM 55 GAL DRUM
BUS DRUM 55 GAL DRUM
4
IV - B
BUS DRUM
55 GAL DRUM
2
II - B
BUS DRUM
55 GAL DRUM
BUS DRUM 55 GAL ORUM
4
IV - A
BUS DRUM
55 GAL DRUM
P&ID: MS033668 P&ID: MS033668 P&ID: MS033668 P&ID: MS033668 P&ID: MS033668 P&ID: MS033668 P&ID: MS033668 P&ID: MS033668 P&ID: MS033668
P&ID: MS033668
NO FLOW
CAUSE: NAP
CONSEQ:
REVERSE FLOW
CAUSE: NAP
CONSEQ:
INCREASED FLOW
CAUSE: NAP
CONSEQ:
INCREASED PRESSURE
CAUSE: EXTERNAL HEAT SOURCE
CONSEQ: POSSIBLE PERSONNEL EXPOSURE
INCREASED TEMPERATURE
CAUSE: SEE INCREASED PRESSURE
CONSEQ:
REDUCED FLOW
CAUSE: NAP
CONSEQ:
REDUCED PRESSURE
CAUSE: NAP
CONSEQ:
REDUCED TEMPERATURE
CAUSE: WINTER EXPOSURE
CONSEQ: FREEZE/CONGEAL
WRONG DRUM OR MATERIALS
CAUSE: MIX UP IN WAREHOUSE WRONG MATERIAL DELIVERED TO PLANT
DRUM DAMAGE IN TRANSIT
CONSEQ: CONTAMINATE BUS TANK, LOSSED PRODUCTION
CAUSE: FORK LIFT ERROR
CONSEQ: SPILLAGE, EXPOSURE
P&ID: MS033668
EXPOSURE TO AIR
CAUSE: CAP LEFT OFF FOR LONG PERIOD OF TIME
CONSEQ: CONGEALS, ETOH RELEASE
Action Item Request Action Item Response
SSlSSSIBSIBaSS3SS:S3SSSSSSSSXBISS:
ACT:
ACT:
ACT:
ACT: SRO ORUM HANDLING PROCEDURE, OPERATOR TRAINING, AND PPG ACT:
ACT:
ACT:
ACT: SRO DRUM HANDLING PROCEDURES AND OTP ACT: SRO DRUM HANDLING PROCEDURES AND MATERIAL ID/CONFIRMATION
ACT: SRO DRUM HANDLING PROCEDURE, PPG, AND ENVIROMENTAL IMPACT JAW=> ACT: SRO DRUM HANDLING PROCEDURE AND OTP
VAB.0001089252
Page No. 07/24/89
2
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Risk Code
Criticality Equip ID & Frequency Equipment Description
P&ID
ESBSSSSKSSS BHIKHMtannSSISSSSSSSSXSISXSSS
Caused By: Deviation Description Consequences
Action Item Request Action Item Response
sssttiissrissssssssssssssssssssssxrstssss
2
III - A HM-101/102-E-A13-1
P&ID: MS003668
NO FLOW
BUS FROM DRUM TO TK-021
CAUSE: VALVE CLOSED FILTER PLUG PUMP FAILURE DRUM EMPTY LINE PLUG
ACT: SRO OTP SUGG. PRESSURE GAUGES EITHER SIDE OF
FL-045
NOTE: PC'S ADDED TO PI&D
CONSEQ: LOSS OF FLOW POSSIBLE LEAKAGE AND PERSONNEL EXPOSURE
HM-101/102-E-A13-1
P&ID: MS003668
BUS FROM DRUM TO TK-021
REVERSE FLOW
CAUSE: NAP CONSEQ:
ACT:
HM-101/102-E-A13-1
P&IO: MS003668
BUS FROM DRUM TO TK-021
INCREASED FLOW
CAUSE: NAP CONSEQ:
ACT:
2
III - A HM-101/102-E-A13-1
P&ID: MS003668
INCREASED PRESSURE
BUS FROM DRUM TO TK-021
CAUSE: SEE NO FLOW CONSEQ:
HM-101/102-E-A13-1
P&ID: MS003668
BUS FROM DRUM TO TK-021
INCREASED TEMPERATURE
CAUSE: NAP CONSEQ:
ACT:
2
III - A HM-101/102-E-A13-1
P&ID: MS003668
REDUCED FLOW
BUS FROM DRUM TO TK-021
CAUSE: SEE NO FLOW FILTER ORAIN OPEN
CONSEQ: SEE NO FLOW
2
III - A HM-101/102-E-A13-1
P&ID: MS003668
REDUCED PRESSURE
BUS FROM DRUM TO TK-021
CAUSE: SEE NO FLOW CONSEQ:
HM-101/102-E-A13-1
P&ID: MS003668
BUS FROM DRUM TO TK-021
REDUCED TEMPERATURE
CAUSE: NAP CONSEQ:
HM-101/102-E-A13-1
P&ID: MS003668
BUS FROM DRUM TO TK-021
DIAPHRAGM FAILURE
CAUSE: INCOMPATABILITY
CONSEQ: PUMP FAILURE POSSIBLE PERSONNEL EXPOSURE
ACT: CONFIRM C0MPATA8ILITY JAW=>
1
B
HM-101/102-E-A13-1
P&ID: MS003668
STATIC CHARGE
BUS FROM DRUM TO TK-021
CAUSE: FAILURE TO GROUND DRUM/LINE
CONSEQ: FIRE EXPLOSION
ACT: SRO GROUNDING PROCEDURE AND OTP
VABR.j0001089253
Page NO. 07/24/89
3
Risk Criticality Equip ID Code & Frequency Equipment Description
P&ID
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Caused By: Deviation Description Consequences
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: MS003668 NO FLOW
CAUSE: NAP CONSEQ:
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: MS003668 REVERSE FLOW
CAUSE: NAP CONSEQ:
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: MS003668 INCREASED FLOW
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: MS003668
INCREASED PRESSURE
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: MS003668
INCREASED TEMPERATURE
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: HS003668
REDUCED FLOW
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: MS003668
REDUCED PRESSURE
CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ:
AI-149/150-N-M2-1 UTILITY AIR LINES
P&ID: MS003668
REDUCED TEMPERATURE
IV - B
IN-219-N-A2-2<M2-2) P&ID: MS003668 NITROGEN SUPPLY TO TANK
NO FLOW
CAUSE: NAP
CONSEQ:
CAUSE: BOTTLE EMPTY VALVE CLOSED
IN-219-N*A2"2(M2-2) P&ID: MS003668 NITROGEN SUPPLY TO TANK
REVERSE FLOW
4
IV - B
IN-219-N-A2-2CM2-2) P&ID: MS003668
INCREASED FLOW
NITROGEN SUPPLY TO TANK
CONSEQ: NO BLANKET - LONG TERM DEGRADATION TO BUS CAUSE: IMP
CONSEQ:
CAUSE: REGULATOR FAILURE CONSEQ: RELIEF
Action Item Request Action Item Response ACT: THIS LINE REPRESENTS MINOR OPERABILITY PROBLEMS ONLY
ACT:
ACT: NONE REQUIRED
ACT: ACT: NONE REQUIRED
VAB.0001089254
Page No. 07/24/89
4
Risk Criticality Equip ID Code & Frequency Equipment Description
P&ID
VISTA CHEMICAL COMPANY (TC COMPLIANCE HA20P) HAZOP Study Data Report (Without Grouping)
Deviation Description
Caused By: Consequences
- IN-219-N-A2-2(M2-2) P&ID: MS003668 NITROGEN SUPPLY TO TANK
- IN-219`N`AZ-2(M2'2) P&ID: MS003668 NITROGEN SUPPLY TO TANK
- IN-219-N-A2-2(M2-2) P&ID: MS003668 NITROGEN SUPPLY TO TANK
- IN-219-N-A2-2CM2-2) P&ID: MS003668 NITROGEN SUPPLY TO TANK
- IN-219*N-A2-2(M2-2) P&ID: MS003668 NITROGEN SUPPLY TO TANK
IV - B
HM-101-E-A13-1 RECIRCULATION LINE
P&ID: MS003668
- HM-101-E-A13-1 P&ID: MS003668 RECIRCULATION LINE
- HM-101-E-A13-1 P&ID: MS003668 RECIRCULATION LINE
- HM-101-E-A13-1 P&ID: MS003668 RECIRCULATION LINE
- HM-101-E-A13-1 P&ID: MS003668 RECIRCULATION LINE
- HM-101-E-A13-1 P&ID: MS003668 RECIRCULATION LINE
- HM-101-E-A13-1 P&ID: MS003668 RECIRCULATION LINE
INCREASED PRESSURE INCREASED TEMPERATURE REDUCED FLOW REDUCED PRESSURE REDUCED TEMPERATURE NO FLOW
REVERSE FLOW INCREASED FLOW INCREASED PRESSURE INCREASED TEMPERATURE REDUCED FLOW REDUCED PRESSURE
CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: PLUGGED LINE
CLOSED VALVE CONSEQ: OPERATIONS PROBLEM CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP
Action Item Request Action Item Response ACT: ACT: ACT: ACT: ACT: ACT: NONE REQUIRED
ACT: ACT: ACT: ACT: ACT: ACT:
VAB.0001089255
Page No. 07/24/89
5
Risk Criticality Equip ID Code & Frequency Equipment Description
P&IO
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Caused By: Deviation Description Consequences
HN-101-E-A13-1 RECIRCULATION LINE
P&ID: MS003668
REDUCED TEMPERATURE
CAUSE: NAP CONSEQ:
4
IV - A
HM-103-E-A13-KM2-1) P&ID: MS003668
NO FLOW
PUMPS PP-143/144 SUCTION
CAUSE: VALVE CLOSED
LINE PLUGGED PUMP FAILURE EMPTY TANK
CONSEQ: LOSS OF FLOW REACTOR SEQ. SHUTS DOWN
HM-103-E"A13*1(M2-1) P&ID: MS003668 PUMPS PP>143/144 SUCTION
REVERSE FLOW
CAUSE: NAP CONSEQ:
4
IV - D
HM-103-E-A13-KM2-1) P&ID: MS003668
INCREASED FLOW
PUMPS PP-143/144 SUCTION
CAUSE: LINE BREAKAGE
CONSEQ: LOSS OF TK-021 CONTENTS PRODUCTION LOSS
HM-103-E-A13-KM2-1) P&ID: MS003668 PUMPS PP-143/144 SUCTION
INCREASED PRESSURE
CAUSE: NAP CONSEQ:
HM'103'E'A13*1(M2`1) P&ID: MS003668 PUMPS PP-143/144 SUCTION
INCREASED TEMPERATURE
CAUSE: NAP CONSEQ:
4
IV - A
HN-103-E'A13'1(M2-1) P&ID: MS003668
REDUCED FLOW
PUMPS PP-143/144 SUCTION
CAUSE: SEE LOSS OF FLOW CONSEQ:
HM-103-E-A13-KM2-1) P&ID: MS003668 PUMPS PP-143/144 SUCTION
REDUCED PRESSURE
CAUSE: NAP CONSEQ:
HM-103-E-A13-1(M2-1) P&ID: MS003668 PUMPS PP-143/144 SUCTION
REDUCED TEMPERATURE
CAUSE: NAP CONSEQ:
2
III - A HM-104/105/106/107-8 P&IO: MS003668
NO FLOW
PP-143/44 TO REACTOR AREA
CAUSE: BLOCKED LINE
PUMP
METER
INSTRUMENT FAILURE
PLUGGED FILTER
t-0**?** i
fgjbtovtruo*)
Action Item Request Action Item Response ACT: ACT: NONE REQUIRED
ACT: ACT: NONE REQUIRED ACT: ACT:
ACT: ACT: ACT: SRO OTP
VAB.0001089256
Page NO. 07/24/89
6
Risk Criticality Equip 10 Code & Frequency Equipment Description
P&ID
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Uithout Grouping)
Deviation Description
Caused By: Consequences
Action Item Request Action Item Response
-
HM-104/105/106/107-8 P&10: MS003668
REVERSE FLOW
PP-143/44 TO REACTOR AREA
CAUSE: NAP CONSEO:
ACT:
HM-104/105/106/107-8 P&ID: MS003668
INCREASED FLOW
PP-143/44 TO REACTOR AREA
CAUSE: NAP CONSEQ:
ACT:
*
*
HM-104/105/106/107-8 P&ID: MS003668
INCREASED PRESSURE
CAUSE: NAP
PP-143/44 TO REACTOR AREA
CONSEQ:
HM-104/105/106/107-8 P&ID: MS003668
INCREASED TEMPERATURE
CAUSE: NAP
PP-143/44 TO REACTOR AREA
CONSEQ:
ACT: ACT:
2
III - A HM-104/105/106/107-8 P&ID: MS003668
REDUCED FLOW
PP-143/44 TO REACTOR AREA
-
HM-104/105/106/107-8 P&ID: MS003668
REDUCED PRESSURE
PP-143/44 TO REACTOR AREA
-
HM-104/105/106/107-8 P&ID: MS003668
REDUCED TEMPERATURE
PP-143/44 TO REACTOR AREA
CAUSE: SEE NO-FLOW, OPEN BLEEDERS CONSEQ: SEE NO-FLOW CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ:
ACT: ACT: ACT:
2
Ill - A HM-104/105/106/107-8 P&ID: MS003668
MODICON FAILURE
PP-143/44 TO REACTOR AREA
CAUSE: LOSS OF POWER HARDWARE PROBLEMS (I/O, CPU, ETC.)
ACT: SRO RESPONSE PROCEDURES AND VERIFY PERIODIC UPS CHECKS
CONSEQ: LOST PRODUCTION
WCE=>
2
III - A HM-104/105/106/107-8 P&ID: MS003668
MAINTENANCE
PP-143/44 TO REACTOR AREA
4
IV - A
HM-104/105/106/107-8 P&ID: MS003668
PUMP SEAL FAILURE
PP-143/44 TO REACTOR AREA
CAUSE: PUMP FILTER
CONSEQ: POSSIBLE PERSONNEL EXPOSURE
CAUSE: OVERHEATING, BEARING FAILURE, IMPROPER FLUSH, COUPLING FAILURE
ACT: SRO MAINTENANCE PREP. PARTS STOCKING PPG
ACT: SRO MAI NT, SCHEDULING PROCEDURES
4
IV - B
HM109
P&ID: MS003668
NO FLOW
PUMP RELIEF LINE
CONSEQ: SEAL LEAK, PUMP FAILURE
CAUSE: VALVE BLOCKED, LINE PLUGGED, PSV FAILS
CONSEQ: PUMP FAILURE, POSSIBLE EXPOSURE
ACT:
VAB.0001089257
Page No. 07/24/89
7
Risk Criticality Equip ID Code & Frequency Equipment Description
P&ID
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Caused By: Deviation Description Consequences
Action Item Request Action Item Response
HM109 PUMP RELIEF LINE
P&ID: MS003668
REVERSE FLOW
CAUSE: PSV FAIL OPEN CONSEQ: NAP
ACT:
4
IV - B
HM109
P&ID: MS003668
INCREASED FLOW
PUMP RELIEF LINE
CAUSE: PSV FAIL, FLOW WHEN NOT DESIRED
CONSEQ: LOSS OF BUS FORWARD FLOW, SYSTEM SEQUENCE SHUTDOWN, EXPOSURE
ACT:
HM109 PUMP RELIEF LINE
P&ID: MS003668
INCREASED PRESSURE
CAUSE: NAP CONSEQ:
ACT:
HM109 PUMP RELIEF LINE
P&ID: MS003668
INCREASED TEMPERATURE
CAUSE: NAP CONSEQ:
ACT:
HM109 PUMP RELIEF LINE
P&ID: MS003668
REDUCED FLOW
CAUSE: NAP CONSEQ:
ACT:
HH109 PUMP RELIEF LINE
P&ID: MS003668
REDUCED PRESSURE
CAUSE: NAP CONSEQ:
ACT:
HM109 PUMP RELIEF LINE
P&ID: MS003668
REDUCED TEMPERATURE
CAUSE: NAP CONSEQ:
ACT:
TK-021 BUS TANK
P&ID: MS003668
NO FLOW
CAUSE: NAP CONSEQ:
ACT:
TK-021 BUS TANK
P&ID: MS003668
REVERSE FLOW
CAUSE: NAP CONSEQ:
ACT:
TK-021 BUS TANK
P&ID: MS003668
INCREASED FLOW
CAUSE: NAP CONSEQ:
ACT:
III - C
TK-021 BUS TANK
P&ID: MS003668
INCREASED PRESSURE
CAUSE: CONSERVATION VENT FAIL CONSEQ: TANK FAIL, SPILL. EXPOSURE
ACT: REVIEW FILL PROCEDURE, VERIFY NEED FOR CHECK VALVE IN N2 LINE
DEK=>
VAB.0001089258
Page No. 07/24/89
8
Risk Criticality Equip ID Code 8 Frequency Equipment Description
P&ID
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Deviation Description
Caused By: Consequences:
Action Item Request Action Item Response
TK-021 BUS TANK
P&ID: MS003668
INCREASED TEMPERATURE
CAUSE: EXTERNAL FIRE CONSEQ: TANK OVERPRESUURE
ACT: CONFIRM VENT SIZED FOR FIRE CASE JAW=>
TK-021 BUS TANK
P&ID: MS003666
REDUCED FLOW
CAUSE: NAP CONSEQ:
ACT:
TK-021 BUS TANK
P&ID: MS003668
REDUCED PRESSURE
CAUSE: LOSS OF N2, CONSERVATION VENT FAIL
CONSEQ: IMPROBABLE
ACT:
4
IV - B
TK-021
BUS TANK
P&ID: MS003668
REDUCED TEMPERATURE
CAUSE: LOSS OF HEAT TRACE CONSEQ: BUS FREEZE/CONGEAL
ACT:
4
IV - A
TK-021
BUS TANK
P&ID: MS003668
LEVEL SENSING
CAUSE: SIGHT GLASS DISCOLORED OR PLUGGED, PROBE FAILURE
ACT:
CONSEQ: LOSS OF LEVEL INDICATION OR ALARM
IV - A
TK-021 BUS TANK
P&ID; MS003668
OVERFILLING
CAUSE: 4 DRUMS DON'T FIT IN TANK CONSEQ: SPILL
ACT: SRO FILLING PROCEDURE JAW=>
HM-111-120
P&ID: MS003669
BUS REACTOR INLET LINES
NO FLOW
CAUSE: PLUGGED NOZZLE, BLOCKED VALVE, PLUGGED LINE
CONSEQ: SEQUENCE SHUTDOWN, LOSS OF BUS FLOW, LOST PRODUCTION
ACT: PETE REVIEW PCS>
HM-111-120
P&ID: MS003669
BUS REACTOR INLET LINES
REVERSE FLOW
CAUSE: IMPROBABLE, THROUGH NOZZLE CONSEQ:
ACT:
HM-111-120
P&ID: MS003669
BUS REACTOR INLET LINES
INCREASED FLOW
CAUSE: NAP CONSEQ:
ACT:
HM-111-120
P&ID: MS003669
BUS REACTOR INLET LINES
INCREASED PRESSURE
HM-111-120
P&ID: MS003669
BUS REACTOR INLET LINES
INCREASED TEMPERATURE
CAUSE: SEE OTHER LINES CONSEQ: CAUSE: NAP
ACT: act:
VAB.0001089259
Page NO. 07/24/89
9
Risk Criticality Equip ID Code & Frequency Equipment Description
P&ID
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Caused By: Deviation Description Consequences:
Action Item Request Action Item Response
HM-111-120
P&ID: MS003669
BUS REACTOR INLET LINES
REDUCED FLOW
CAUSE: SEE OTHER LINES CONSEQ:
HM-111-120
P&ID: MS003669
BUS REACTOR INLET LINES
REDUCED PRESSURE
CAUSE: NAP CONSEQ:
3 III - B HM-111-120
P&ID: MS003669
REDUCED TEMPERATURE
BUS REACTOR INLET LINES
CAUSE: HEAT TRACE FAILURE CONSEQ: NOZZLE PLUG, POOR BUS COATING
2
II - B
HM-111-120
P&ID: MS003669
CATASTROPHIC LINE FAILURE CAUSE: VIBRATION, IMPACT
BUS REACTOR INLET LINES
CONSEQ: EXPOSURE , VCM RELEASE
2 III - A HM-111-120
P&ID: MS003669
MAINTENANCE
BUS REACTOR INLET LINES
CAUSE: PLUGGED NOZZLE
CONSEQ: PRODUCTION LOSS CONTAMINATION PERSONNEL EXPOSURE
IV - B
UX-130/139-E-A13-1 WATER FLUSH LINE
P&IO: MS003669
NO FLOW
CAUSE: CHECK VALVE PLUGGED VALVE PLUGGED
WX-130/139-E-A13-1 WATER FLUSH LINE
P&ID: MS003669
WX-130/139-E-A13-1 WATER FLUSH LINE
P&ID: MS003669
UX-130/139-E-A13-1 WATER FLUSH LINE
P&ID: MS003669
WX-130/139-E-A13-1 WATER FLUSH LINE
P&ID: MS003669
IV - A
WX-130/139-E-A13-1 WATER FLUSH LINE
P&ID: MS003669
REVERSE FLOW INCREASED FLOW INCREASED PRESSURE INCREASED TEMPERATURE REDUCED FLOW
CONSEQ: PLUGGED NOZZLE CAUSE: NAP
CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: FILTER PLUGGED
LOW HEADER PRESSURE f Visr .3 . pLvu,)7 fc
ACT:
ACT:
ACT: SRO WINTERIZATION, OTP
ACT: SRO OTP, SUPPORT DESIGN, MAINT. PROC ACT: SRO OTP, MAINTENANCE PROCEDURES
ACT:
ACT: ACT: ACT: ACT: ACT:
VAB.0001089260
Page No. 07/24/89
10
Risk Criticality Equip ID Code & Frequency Equipment
P&ID
VISTA CHEMICAL COMPANY <TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Caused By: Deviation Description Consequences
WX-130/139-E-A13-1 WATER FLUSH LINE
P&ID: MS003669
REDUCED PRESSURE
CAUSE: NAP CONSEQ:
-
WX-130/139-E-A13-1
P&ID: MS003669
REDUCED TEMPERATURE
CAUSE: NAP
WATER FLUSH LINE
CONSEQ:
3
MI - B WX-130/139-E-A13-1
P&ID: MS003669
FILTERS (300,400)
WATER FLUSH LINE
CAUSE: CARBON STEEL LINE
CONSEQ: CONTAMINATED RESIN PLUGGED NOZZLE
3
III * B SM-139/148-H-A13
P&ID: MS0036669
NO FLOW
STEAM LINES
CAUSE: CLOSED GLOBE VALVE PLUGGED LINE UTILLITY FAILURE
CONSEQ: IMPROPER BUS INJECTION
4
III - C SM-139/148-H-A13
P&ID: MS0036669
REVERSE FLOW
STEAM LINES
CAUSE: KILL VALVES LEAK IMPROPER SEQUENCE OF VALVES
CONSEQ: 1SONOX COATING IN STEAM LINE, ISONOX IN NEXT BATCH, BAD BATCH
4
IV - A
SM-139/148-H-A13
P&ID: MS0036669
INCREASED FLOW
STEAM LINES
CAUSE: GLOBE VALVE OPEN TOO WIDE CAT. PIPE FAILURE
CONSEQ: OVERHEAT REACTOR PRODUCTION LOSS THERMAL BURN NOZZLE DAMAGE
*
SM-139/148-H-A13
P&ID: MS0036669
INCREASED PRESSURE
CAUSE: NAP
STEAM LINES
CONSEQ:
SM-139/148-H-A13
P&ID: MS0036669
INCREASED TEMPERATURE
CAUSE: NAP
STEAM LINES
CONSEQ:
SM-139/148-H-A13 STEAM LINES
P&ID: MS0036669
REDUCED FLOW
*
SM-139/148-H-A13
P&ID: MS0036669
REDUCED PRESSURE
STEAM LINES
CAUSE: SEE NO FLOW CONSEQ: CAUSE: NAP
Action Item Request Action Item Response
ACT:
ACT:
ACT: REVIEW THAT ALL CS LINE HAVE FILTERS SAI => ACT:
ACT: CONFIRM TSO VALVES
ACT:
ACT:
ACT:
ACT:
+
ACT:
VAB.0001089261
Page NO. 07/24/89
11
Risk Criticality Equip ID Code & Frequency Equipment Description
P&IO
VISTA CHEMICAL COMPANY <TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Caused By: Deviation Description Consequences
Action Item Request Action Item Response
SM-139/148-H-A13 STEAM LINES
P&IO: MS0036669
REDUCED TEMPERATURE
CAUSE: NAP CONSEQ:
ACT:
4
IV - B
HM-122/128
KILL LINES
P&ID: MS003669
NO FLOW
CAUSE: PLUGGED LIN LOSS OF TRACING
CONSEQ: BAD 600 BATCH
ACT:
HM-122/128 KILL LINES
P&ID: MS003669
REVERSE FLOW
CAUSE: NAP CONSEQ:
ACT:
HM-122/128 KILL LINES
P&ID: MS003669
INCREASED FLOW
CAUSE: NAP CONSEQ:
ACT:
HM-122/128 KILL LINES
P&ID: MS003669
INCREASED PRESSURE
CAUSE: NAP CONSEQ:
ACT:
HM-122/128 KILL LINES
P&ID: MS003669
INCREASED TEMPERATURE
CAUSE: NAP CONSEQ:
ACT:
HM-122/128 KILL LINES
P&ID: MS003669
REDUCED FLOW
HM-122/128 KILL LINES
P&ID: MS003669
REDUCED PRESSURE
HM-122/128 KILL LINES
P&ID: MS003669
REDUCED TEMPERATURE
4
IV - A
2.5-WP-105
P&ID: P+ID #3
NO FLOW
LINE TO SMALL BLEND TANKS
CAUSE: NAP CONSEQ: CAUSE: NAP CONSEQ: CAUSE: LOSS OF TRACING CONSEQ: PLUGGED LINE CAUSE: BLOCKED VALVE,PLUGGEO LINE, PUMP FAILURE, PLUGGED STRAINER
ACT: ACT: ACT: ACT:
IV - B
2.5-WP-105
P&IO: P+IO #3
LINE TO SMALL BLEND TANKS
REVERSE FLOW
CONSEQ: LOSS OF PRODUCTION
CAUSE: VALVE ALIGNMENT ON STRIPPERS
CONSEQ: OVERFILL BATCH STRIPPERS AND ERS SYSTEM
ACT:
VAB.0001089262
Page No. 07/24/89
12
Risk Code
isas
Criticality ft Frequency
Equip ID Equipment Description
ssssssssszssseniru
PftIO
2.5-WP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
2.5-WP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
2.5-WP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
2.5-WP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
2.5-WP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
4
IV - B
2.5-WP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
4
IV - A
2.5-UP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
4
IV - B
2.5-WP-105
P&ID: P+ID #3
LINE TO SMALL BLEND TANKS
3-WP-104
P&ID: P+ID #3
STRIPPER TO CENTRATE
3-UP-104
P&ID: P+ID #3
STRIPPER TO CENTRATE
3-WP-104
P&ID: P+ID #3
STRIPPER TO CENTRATE
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Caused By: Deviation Description Consequences
INCREASED FLOW
CAUSE: NAP
CONSEQ:
INCREASED PRESSURE
CAUSE: NAP CONSEQ:
INCREASED TEMPERATURE
CAUSE: NAP
CONSEQ:
REDUCED FLOW
CAUSE: SEE NO FLOW
CONSEQ:
REDUCED PRESSURE
CAUSE: NAP
CONSEQ:
REDUCED TEMPERATURE
CAUSE: WINTER CONDITIONS CONSEQ: FREEZE LINE
PUMP CONSIDERATIONS
CAUSE: OVERHEATING, SEAL FAILURE, BEARING FAILURE, CAVITATION, NO FLUSH
CONSEQ: PUMP FAILURE
PROCESS WATER - NO FLOW
CAUSE: CONTROLLER FAILURE, VALVE/LINE PLUGGAGE, FREEZE
CONSEQ: PUMP FAILURE
NO FLOW
CAUSE: CLOSED VALVES, PLUGGED LINE
CONSEQ: NAP
REVERSE FLOW
CAUSE: SEE WP-105
CONSEQ:
INCREASED FLOW
CAUSE: NAP
CONSEQ:
Action Item Request Action Item Response
SSSSXSSSSSS3SX1S3XS8SSSSSSSSSSSSSS
ACT:
ACT:
ACT:
ACT:
ACT:
ACT: SRO OTP AND MAINTENANCE
ACT:
ACT:
ACT: ACT: ACT:
VAB.0001089263
Page NO. 07/24/89
13
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP) HAZOP Study Data Report (Without Grouping)
Risk Code
sass
Criticality Equip ID & Frequency Equipment Description
asassssssaas ssasitstssasasaetsass:
P&ID
Deviation Description Consequences
3-WP-104
P&ID: P+ID #3
STRIPPER TO CENTRATE
INCREASED PRESSURE
CAUSE: NAP CONSEQ:
3-UP-104
P&ID: P+ID #3
STRIPPER TO CENTRATE
INCREASED TEMPERATURE
CAUSE: NAP CONSEQ:
3-WP-104
P&ID: P+ID #3
STRIPPER TO CENTRATE
REDUCED FLOW
CAUSE: SEE NO FLOW CONSEQ:
3-UP-104
P&ID: P+ID #3
STRIPPER TO CENTRATE
REDUCED PRESSURE
CAUSE: NAP CONSEQ:
4 IV - A 3-UP-104
P&ID: P+ID #3
REDUCED TEMPERATURE
STRIPPER TO CENTRATE
CAUSE: WINTER CONDITIONS CONSEQ: FREEZE LINE
3
UC-100/109
P&IO: JRU SKETCH NO FLOW
CUS TO MIDDLE OF JACKET
CAUSE: CLOSED VALVE COOLING WATER OFF PLUGGED LINE
CONSEQ: POSSIBLE BUILD-UP AND CONTAMINATION, PRODUCTION LOSS
WC-100/109
P&ID: JRU SKETCH
CUS TO MIDDLE OF JACKET
REVERSE FLOW
CAUSE: NAP CONSEQ:
III - B WC-100/109
P&ID: JRU SKETCH
CWS TO MIDDLE OF JACKET
INCREASED FLOW
CAUSE: OPEN GLOBE VALVE
CONSEQ: LONG HEAT-UP TIME TEMPERATURE CONTROL PROBLEMS, CU CAP.
PROBLEMS
IV - B
WC-100/109
P&ID: JRW SKETCH
CUS TO MIDDLE OF JACKET
INCREASED PRESSURE
CAUSE: GLOBE VALVE FAILURE CONSEQ: LIFT RELIEF VALVE
WC-100/109
P&ID: JRU SKETCH
CWS TO MIDDLE OF JACKET
INCREASED TEMPERATURE
CAUSE: NAP CONSEQ:
Action Item Request Action Item Response
lasaaa&ssssaecassaaassassassssssssssass
ACT: ACT: ACT: ACT: ACT: SRO WINTERIZATION TEST AND SEWER STRIPPER WATER IF ACCEPTABLE ACT: SRO VALVE LOCKING PROCEDURE JAW*>
ACT:
ACT:
VAB.0001089264
Page No. 07/24/89
14
Risk Criticality Equip 10 Code & Frequency Equipment Description
p&ID
VISTA CHEMICAL COMPANY (TC COMPLIANCE HAZOP> HAZOP Study Data Report (Without Grouping)
Deviation Description
Caused By: Consequences
- WC-100/109
P&ID: JRW SKETCH REDUCED FLOW
CWS TO MIDDLE OF JACKET
CAUSE: SEE NO FLOW CONSEQ:
WC-100/109
P&ID: JRW SKETCH REDUCED PRESSURE
CWS TO MIDDLE OF JACKET
CAUSE: NAP CONSEQ:
WC-100/109
P&ID: JRW SKETCH
CWS TO MIDDLE OF JACKET
REDUCED TEMPERATURE
CAUSE: NAP CONSEQ:
Action Item Request Action Item Response
ACT:
ACT:
ACT:
VAR0001089265