Document byQ8w0v14gGRzR19bZpLrjOE6
BOX 2222-PITTSBURGH, PENNSYLVANIA 15230-TEL 412/922-2200
November 25, 1954
Armco Stool Corporation Middletown, Ohio Attention: Mr. 8u A. Word
Porehaslog Agent Gentlemen:
Slob Hootlag Furnaces Project 400 Oar Propoeol No. 5105-A Enclosed & our Proposal No. 4105-A oal Propoool Drawings FP-610SA-1 and FP-61Q5A-Z covering Three (3) Five (3) Zoao. Noturol Goo or Booker "C" Oil ood #2 Fool Oil Fired Continuous Poohor Typo Slob Hehsaiing Furoocee with Aust-Etcher Recuperation. Ii any additional iaformotioo ie required, ploooo contact at.
Very Truly Tours. SALEM-B&OSIU3, INC.
KEN 005857
Nortiabtr 25, 1964 No. 6105-A Page 3
3.0 PRODUCTION
3.1 Mill rated production -- MO tou per hoar. Furnace capacity 300 tone per hear.
4.0 FUANACE DESIGN
4.1 The farecce will be recuperative type arranged lor end charge aad end diecharge. Slabe to be discharged into the mill delivery rail table by a mechanical slab extractor which le to be famished and installed by the Purchaser.
4.2 The furnace has Are (5) Firing Zcmee as follow*: Top Charge Heating Zone, Bottom Charge Heating Zone, Top Center Heating Zone, Bottom Center Heating Zone aad Soak Zone. Soak Zone la arranged for roof firing aad will be fired with natural gas or #2 fuel oil utilising cold air.
4. 3 The waste gases are drafted at the charge end through oftak*s that lead to a recuperator and stack.
5. 0 tiEFFACTORIES AND INSULATION
5.1 Suspended arch aad
Nose Construction:
9" Special Super Aamtite #25,
or approved equal, with necessary
refractory anchors aad anchor
attachments.
5.2 Side 'W alls:
12" of Special Super Ramtite #25 plastic, or approved equal, aad 1-1/2" Superex block insulation. The plastic side walls extend from the top of the arch to a point 4-1/2" below the hearth paving brick in the Bottom Heating Zenos.
5.3 Soak Hearth:
Top Course: 4-1/2 of 70% Alumina fire brick (Fraace-Coriadon. or approved equal).
KEN 005858
SB 140-2 10-84
M3UEM
t BROS XUS, Inc. )
CARNEGIE, PA.
1
Proposal No.
November 25. 1964 6105-A Page 4
AEF5ACTOai3SS AND INSULATION ------coutd.
5. 3 Soak Hearth:
12" of high hast doty fir* brick. 7*1/2" JM C-22, or approved foal, insulatiag fir* brick.
5.4 Fme Bottna: (Flat Section)
12" of high boat duty fire brick. 5" of JM C-22. or approved equal. iasulating fir* brick.
5.5 Furnace Bottom: (Sloped Sactioa)
12" of taper duty fir* brick. 5" of JM C-22, or approved wpal, Insulating fire brick.
5.6 Burner Walls:
Soak. Top Ceater. Bottom Carter, Top Charge aad Bottom Charge * It" of special Soper JUmtite #25 plastic, or approved equal, and
1-1/2" of block insulation.
5.7 Downtake:
liast-Escher recuperator
5.7.1
Side V ails: (Walls encased in steel)
13-1/2" high heat duty fire brick, 4-1/2" 2000 F. insulating fire brick (B it W K-20, or approved equal). 2-1/4" red brick for ventilation aad drainage.
5.7.2 Bottom:
7-1/2" of high heat duty fire brick. 5" 2000 F. insulating fire brick (SiW K-20. or approved equal). 2-1/4" of red brick for ventila tion and drainage.
KEN 005859
November 25, 1964 6105-A Page 5
5.0 REFRACTORIES AND INSULATION -------coaid.
5.3 slue: Downtake to Recuperator (Flue encased la concrete) Rust-Eschsr Recuperator Arrangement
5.8. 1 V alls:
9" high heat duty are brick. 4-1/2" 2000 F. insulating Are brick (B It V K-20, or approved equal),
2*1/4" of red brick for ventilation and drainage.
5,8. 2 BcCtom:
7-1/2" of high heat duty fire brick, 5" of 2000 F, insulating fire brick (B k W K-20, or approved equal) 2-1/4" red brick for ventilation and drainage.
5.8.3 Arch: (Sprung)
9" high heat duty fire brick. 4-1/2" 2000 op. insulating firs brick (BltV K-20, or approved equal), 1" plastic insulating csmsnt (Jki-500, or approved equal)
5.9 Stack lining: ust-scher Recuperator Arrangement
5, 9. 1
The entire stub stack is lined with 4-1/2" of 2000 F. insulating fire brick (Bif K-20, or approved equal),
9.10
Hot Air Pipe Lining:
4-1/2" B it v; K-1620 (or approved equal) insulating fire brick
5. 11
Door Lining: (Side Doors)
7" of high temperature castable (JM high temperature flrecrete, or approved equal)
S. 12 Discharge Door*.
9" 2800 T, Insulating fire brick. 1" block insulation.
KEN 005860
4
SALEM-BROSIUS, INC.
CARNEGIE, PA.
Proposal No.
Navtmkcr 25, 1544 4105-A Page 34
PURCHASER SUPPLIES AT HIS EXPENSE
TESTS
All tests as desired by the Purchaser will be conducted at his expense under Company supervision if conducted at the time of installation. Supervision will be supplied at no expense to Purchaser.
ALTERATIONS OF PURCHASER'S FACILITIES
Purchaser shall make such changes in and alterations of its existing facilities as shall be necessary to permit the erection and installation of equipment covered by this proposal including without limitation, all necessary openings in walls, roofs and floors plus necessary reinforcement of same. The restoration of any of these items to their original or final condition shall be for the account of the Purchaser.
SURPLUS MATERIALS
Refractories, insulating materials and plastics are subject to breakage and loss in shipping, unloading and handling. Company provides for this by supplying these items in quantities in excess of actual requirements. Purchaser agrees to purchase from the Company at current published prices all normal surplus of these items remaining at completion of work under this proposal.
DELAYS EY PURCHASER
Should the Company incur additional costs because of the inability of the Purchaser to ( I) accept delivery of materials or (II) to permit normal and unrestricted installation of the equipment covered by this proposal, such additional costs shall be for the account of the Purchaser.
INSURANCE
The Purchaser shall protect the property of the Company from all losses by fire or otherwise until the Purchase Price is paid in full. The responsibility of the Company as to material damaged in transit ceases upon delivery of the material
in good condition to the common carrier at point of shipment.
' SALES TAXES
Prices quoted herein do not include present or future sales, income, nor use taxes, duties, nor excise levies on imports or exports. Such items are all for the account of the Purchaser.
KEN 005861
SALEM-BROSIUS, INC.
CARNEGIE, PA.
NmaWr 25, 1954 Proposal No. 4105-A Page 40
- GENERAL TERMS AND CONDITIONS
INSTALLATION
The Company shall furnish all labor, both skilled and common, and engineer ing and erection supervision for the installation of the equipment specified herein except.as enumerated on the pages titled, "Purchaser Supplies at His Expense."
Unless otherwise agreed upon, all installation work by the Company will be carried on during straight working hours at the published wage rates in effect in the area involved at the date of this proposal.
If, for any reason, overtime work is mutually agreed upon and performed, or if it is mutually agreed that It is necessary to pay wages above scale, traveling or living costs, the actual increases in cost of these items over the standard time cost, plus Welfare, Old Age Benefit, Insurance, and any premium pay ments applicable to these additional costs are for the account of the Purchaser.
If, during the time period the Company is installing, starting up, or testing the equipment covered by this proposal, this work is delayed by the Purchaser and the Company's personnel is removed from the plant, the Purchaser shall pay all expenses involved in returning Company's personnel to Carnegie, Pennsylvania, and back to Purchaser's Plant, plus travel time at the rate of
$85.09 Per day.
PRICE
r08 APPROPRIATION PURPOSES ONLY
Three (3)
FWe -Zone Natural Gm or Banker "C" Oil and #2 Fuel Oil fired Continuous Puakar Type Slab Reheating Furnaces with Rnst-Escher Recuperators complete ae described herein including all mateA ale, engineering, erection labor and supervision of erection on Purchaser's foundation# --
FOUR MILLION, FOUR HUNDRED THOUSAND DOLLARS ($4,400,000,00)
KEN 005862
'bD KEN 005855