Document byOJ5vdK2YVvp23rBnE975vJk

Monsanto fftOM tNAMC ft LOCATION) R. S. Yates - General offices '{ OATC OBJECT HEFERKNCl TO February 26, 1969 " Scope Review Meeting Held with Plant Personnel at Anniston on February 4 and 5, 1969 CEA 2080 - increase Solid Aroclor Capacity E. E. Bowles (part-time) V. R. Haupt R. A. Haydel (part-time) E. E. Smith (part-time) W. E. Voss R. S. Yates J. L. Arnold R. C. Herman K. J. Johnston M. Kaye R. M. Kountz H. E. Waldrep Therminol System - Reviewed the various plans for adding the new Aroclor plant heating load to the present Therminol fur nace. Recommendations: a) Install surge tank in vicinity of Building 27. b) Add external pump to new tank to distribute Therminol to new system. Add 4 x 6" ips nozzles to be used for pumps for present system. c) Install level alarm in tank to prevent overflow and tem perature indicator. d) Check transfer system from present surge tank. Increase transfer line from 4" to 8". e) Check heat loading on present furnace. This was done by Mr. Bowles on February 10 with the following resultss ; Coil In - 256C Coil Out - 281C Flow - 320 GPM Amb Temp - 55C Heat Load - 2.8M Btu/hr f) Mr. Bowles estimates the following flows are required: Existing Pump New System Item 810 No. 2 Still No. 3 Still TOTAL 350 GPM 200 " 45 " 150 " 150 11 895 " \ 0235785 in.(it .ti.flft . TOWOLDMONOQ48217 2 Process Design Sheets a) Department is 826.17 not 826.22. b) Gould pumps are satisfactory. This was the type used on the last project. - c) Use Counterpoise seals on the chlorinator and mix tank pumps. d) There is a 6" scrubber at the HCl plant which was installed on Project 1663 (EA 4-488) and not being used at present. Mr. Voss will check to see if he can relocate this unit on this project. , e) Add IV ips transfer line from day tanks to charge Therminol tank. f) Consolidate Therminol tank at chlorinators--provide single tank. g) Want only 10% holdup in still and coil. May have up to 1,000 lbs of lime in bottoms. This should be noted in pump specification sheet. h) The draw-off stack on the Montar draw-off stack should be extended. i) Jet sizing should be based on actual operating conditions. Present still vacuum begins at 10 mm and drops to 20 mm. If NC load is 20 lbs, then this increases to 40 lbs at 20 mm. j) item 101 - (1) prefer plate coils to internal coil (2) want quick opening nozzle for Ferric chloride k) Item 102 - prefer Fairbanks-Morse scale 1) Item 104 - (1) check 1/8" diameter holes for sparger (2) total area of holes should not be greater than cross-sectional area of inlet pipe (3) blockages occur in sparger pipes due to over-chlorination (4) Get 20c At between control point temper ature in circ. line and temperature in center of chlorinator. The latter is the more important. What happens to At if pump efficiency decreases? (5) Do not trace shell of chlorinator. 0235786 TOWOLDMONOQ48218 3 m) Item 106 check loading at 3,000 lb/hr of chlorine n) Item 107 need 6" ips nozzle in top manhole for cleanout o) Item 116 had mechanical failures in similar units where tube sheet was welded to the shell P) Item 114 q) Item 125 r) Item 128 combine Items 114 and 121 check on lime addition nozzle (1) design for 400C (2) openings large enough to remove coil (3) check center line of Still No. 4 and No. 5 heaters--use same outer line if possible t) Item 132 (1) check size if yield is 90% (2) What type level instrument? u) Item 135 (1) specify plate coils (2) check construction materials Piping a) Jacketed pipe with swedged jacket is satisfactory. b) Hr. Kuhn requests connection to present still from new chlorinator system. This should be a temporary arrange ment because it may affect FDA clearance. c) Tracers can go to 200 psig. d) Steam system should use (1) bronze seat valves (2) malleable iron unions (3) ball valves in on-off service (4) globe valves with Stellite seats in throttling service TOWOLDMONOQ48219 -4 e) Therminol system should use (1) S.S. jumpers , (2) FA 37 valves get tar in the seats and are difficult to close for this reason. f) All rupture discs at vac tu' ips_stitillll should have a test funnel. a--C ng A "Ptfe g) A cleanout device should be installed for cleaning ejector nozzles. The following device is effective on the high 1 However, the above device is not too effective in the low vacuum stages. Consider tieing stages into the 1*5" lps 1242 circulating line. Instrumentation a) Trend Recording is satisfactory for panel mounted instru ments. b) Still Pot needs a high level alam to protect quality by not overfilling still and a low level alarm to protect the pump. A bubbler does not work because of gravity changes. c) Temperature drop across the coil is never large enough to tell when the batch is nearly finished. Electrical a) Pressurization of motor control room should be reviewed and made to work. ... 0235788 TOWOLDMONOQ48220 Layout a) Stacking of heat exchangers would be acceptable. b) Want Montar from Still No. 5 to drain into present draw off system. - insulation ' a) Use 1/2" braided tubing cover over steam and Therminol jumpers. Miscellaneous a) Do not need spare pump for chlorinator at this time. js TOWOLDMONOQ48221