Table of Contents
HAZOP REPORT VOLUME
Legal Notice.....................................................................................................i List of Abbreviations................................................................................ii
1.0 Purpose.........................................................................................................................
2.0 Scope.............................................................................................................................2-1
3.0 Methodology..........................
3-1
3.1 Introduction..................................................................................................3-2
3.2 Team Members...............................................................................................3-4
3.3 Documents made available ................................................................3-6
3.4 Forms used....................................................................................................3-7
3.5 Preliminary hazard identification.............................................3-7
3.6 Criticality evaluation.......................................................................3-8
3.7 Documents used............................................................................................3-10
4.0 Mitigation.............................................................................................................. 4.1 Mitigation Summary ...................................................................................... 4.2 Critical Identified Hazards................................................................
5.0 P&IDs..............................................................................................................................
APPENDIX A. Study Data Report by Criticality Rank......................................A-l B. Study Data Report by EquipmentNumber...........................................B-l
i
VAB.0001089150
LEGAL NOTICE This report was prepared by VISTA Chemical Company ("VISTA") for internal use only. Neither Vista nor any affiliated organizations, nor any person acting in their behalf, (a) makes any warranty, express or implied, with respect to the use of any information or methods disclosed in this report; or (b) assumes any liability with respect to the use of any information or methods disclosed in this report.
VAB.0001089151
ACT
Aim
ALT ATMOS A2-1 A13-1
BLDR BPCV
CHK CV
DM
EX
FL FCV F/O
H20 HAZAN HAZOP
ID INSUL
KOH
LG LK LS
MAINT MALF MATL MAX MIN
VISTA CHEMICAL COMPANY CONFIDENTIAL
Aberdeen Chemical Plant
List of Abbreviations
Actuated
Accurately Hazardous Materials Alternate Atmosphere
Piping spec Piping spec
Bleeder Back Pressure Control Valve
Check Control valve
Drum
%
Exchange
Filter Flow control valve Fail open
Water Hazard Analysis Hazard & Operability Study
Identification Insulation
Potassium hydroxide
Level gage Leak Level switch
Maintenance Malfunction Material Maximum Minimum
iii
VAB.0001089152
VISTA COMPANY CONFIDENTIAL Aberdeen Chemical Plant
List of Abbreviations
MOC MOD MSDS MV
NAP NORM NC NO
OTP
PAR P&ID PG PIC PM PREP PRESS PROD PRV PSIG
REC REG REV RO RV
SPEC SRO STD
TEMP TG TRANS
VAC VCM
Material of Construction Module
Material Safety Data Sheet Manually operated valve
a Normal
closed open
Operator Training & Procedures
Partially
Piping & Instrumentation Diagram Pressure Gage Pressure Indicating Controller Preventive maintenance
Pressure Production Pressure Relief Valve Pounds per square inch gage
Recommend Regulator Revision Restriction orifice Relief Valve
Specification Suggested review of Standard
Temperature Temperature gauge Transmitter
Vacuum Vinyl Chloride Monomer
iv
m
VAB.0001089153
v
VISTA COMPANY CONFIDENTIAL Aberdeen Chemical Plant
Section 1.0 Purpose
The VISTA Chemical Company Aberdeen Plant (Aberdeen, Mississippi) 5305 Decalcified Water System Hazard and operability (HAZOP) study was conducted to serve many purposes. It will bs used to:
Provide management with the knowledge of where potential hazards exist in the HF Safety Improvements modifications.
Provide safety and operations related documentation for lines and pieces of equipment included in these modifications.
Provide a prioritized basis for subsequent risk analysis/assessment work, if necessary.
Provide documentation for a Risk Management and Prevention Program.
Provide training on HAZOP methodology and techniques for Vista personnel.
Performing a HAZOP study is generally an assurance that if procedural and/or engineering modifications are implemented to mitigate risk, the plant will then be operating under some lower risk. It is not, however, a guarantee that no risk exists, nor does it guarantee that hazardous events or operating problems will not be encountered.
1-1
VAB.0001089154
*
VISTA COMPANY CONFIDENTIAL Aberdeen Chemical Plant
Section 2*0 Scope
Vista Chemical Company operates a nominal capacity 455 million pound per year PVC plant located in Aberdeen, Mississippi. The plant manufactures PVC resins by polymerizing VCM in batch reactors. Water is a raw material in the reaction and in 5305 grade resin must be decalcified. The 5305 Decalcified Water System is being installed to address this need. The 5305 Decalcified Water System Project is the subject of this HAZOP study.
The hazard identification study focused on the following potential hazards:
Personnel injury/death resulting from Fire Explosion Toxic exposure Chemical Contact Thermal Burns Asphyxiation Impact injury Etc.
Equipment/property damage resulting from Fire Explosion Corrosion Misoperation Overpressure Vacuum Overheating Etc.
Production loss resulting from Equipment damage Maintenance Off specification Turnarounds Raw Material Considerations Etc.
Environmental Spills Fugitive Emissions Etc.
The HAZOP methodology used during the study is contained in Section 3, the mitigation for the critical identified hazards contained in Section 4, and the criticality sort/data base is contained in an Appendix.
is
2-1
VAB.0001089155
section 3.0 Methodology
3.1 introduction 3.2 Team Members 3.3 Document9 Made Available 3.4 l0ias Heed 3.5 Preliminary Hazard zdentifloation 3.4 Criticality Evaluation 3.7 Documents used
3-1
VAB.0001089156
section 3.1 introduction
A Hazard and
(HhZOP) study is a simple, yet
structured investigation
for hazard identification. It is an xn
the identification of hazards and operational problems.
A HAZOP study involves a systematic, methodical examination of design documents that describe the facility. The study performed by a multidisciplinary team to identify potential hazards or operability problems that could result in an accident. Deviations from the design value of key parameters are studied using guide words to control the examination evaluation. This presumes that the design values of flows, temperatures, arid other process variables are inherently safe and operable. The study team consists of trained personnel knowledgeable.in the technology and operations, and the team will have the necessary
technical expertise to answer most questions raised during the review without outside assistance.
t
As a starting point, we will define the following terms:
Hazard: Anything (chemical reaction, equipment malfunction or operator error) that can lead to an unwanted event.
Operability: Anything that pauses the operator to improvise in his actions.
These definitions are an important part of the basic HAZOP premise that the process does not have inherent hazards or operating problems when the unit is operating within design parameters as defined by the basic documents such as the Process Flow Diagrams, equipment specifications, operating procedures, etc. in other words, if there are no deviations from the expected norm, by definition there are no hazard or operability problems.
When performing a HAZOP, a proper mix of meeting participants is very important* The mix of participants should normally include most if not all of the following:
Team leader Process engineer Mechanical engineer Plant operator Maintenance
Electrical Safety Team recorder Instrumentation
' '--"MvMBqapaiMqNpIMHmvWlW
3-2
VMWMMWMP
VAB.0001089157
Of these personnel, many are often only part time participants but remain on call for assistance. It can be seen that the electrical, maintenance and other subjects may only be required
on a consulting basis. Also, it is important to keep the size of
the review team tb a manaoeable number such a* between five to
seven so that all members of the teem can participate while keeping the effort moving.
The agenda followed during the HAZOP team meetings is as follows:
Introduce team members: A short biographical sketch by each team member. Purpoie or goal of HAZOP: A general presentation of the purpose or croal of the HAZOP is made. This serves to direct theiAZOP s
HAZOP methodology: A presentation is made by the team
facilitator of the methodology to be used in the study.
This also establishes the team member "mind set"
to conduct an effective HAZOP.
Process
A process discussion is
presented by the Process Engineer to familiarize the HAZOP
team With process scenarios which may lead to a hazardous
condition as Weil as to ensure that all team members have a
clear understanding of the basic process.
AHM properties: An identification and discussion by an
industrial hygienist or other knowledgeable person is
presented to establish a team recognition of the AHM toxic
and
Identify hazards: A preliminary identification by team
members of hazards present within the process. This
to focus the HAZOP study.
Scope the HAZOP: once the AHM properties are established
and discernible HAZOP hazards are identified, the HAZOP
scope X EP
I* *
Establish criticality and frequency ratings: Hazard
parameters are set by the team for
subsequent
of HAZOP identified hazards.
Define dispersion models: The team identifies AHM release
scenarios which will be different cases for dispersion
modeling outside of the HAZOP team meeting.
PCHAZOP* on-line: Load the PCHAZOP* computer program for
recording HAZOP team proceedings.
HAZOP team meetings: A systematic segment by segment team
review of the facilities contained within the job scope
3-3
VAB.0001089158
HAZOP
A formal
facilitator, reviewed and
and than
are
contents.
is prepared by the team by the other members, of the team meetings.
thechapter for report
The HAZOP identified one (1) critical ranked potential hazard with a criticality rank of 2, i.e., which should be improved. Suggested mitigation for this critical ranked hazard is covered in Section 4.0.
. The HAZOP identified ten (10) non-critical ranked hazards which require verification that the appropriate engineering arid/or administrative controls are in place.
The team identified no hazards of the most critical ranking, that is a hazard rated I-A, i.e., a hazard which could potentially cause a major event to occur more often than once per year. In the event; the HAZOP team did identify a hazard that it considered to represent an imminent danger to life or property, the team would have given a verbal presentation to plant management in order to expedite any required mitigation.
Section 3*2 Team Members
The HAZOP study team assembled to identify potential hazard or operability problems should be composed of a multiple disciplined team with the sufficient technical expertise to answer most guide word deviation questions without resorting to further expertise.
The HAZOP study team meetings were held at the VISTA Aberdeen Chemical plant site in Aberdeen, Mississippi. All team members conducting the HAZOP study are employees of VISTA from the Aberdeen plant. They are as follows:
Attendee
Expertise/Responsibility
Dale Andrews* Mike Kane* Ed Mize* Dave Moore* Rendell Mewton# Needham itahl* Jim White* Steve Hillman*
Instrument Technician Senior Process Engineer Maintenence Representative Process Engineer Chief Process Engineer Chief Lead Operator Mechanical Engineer Trainer/Facilitator
* full time # = part time
3-4
VAB.0001089159
section 3*3 Documents ud available
Prior to the start of the HAQP, the necessary reference documentation needs to be assembled and made available for use and reference during the HAZOP team study. A meaningful HAZOP study cannot be conducted without the required documentation to review. Assembly of the documentation optimizes the chance for a successful HAZOP.
NEW MODULE DECALCIFIED WATER SYSTEM P&ID - October 1, 1990
OLD MODULE DECALCIFIED CHARGE WATER P&ID - August 9, 1990
section 3.4 Forms used
The HAZOP team data was recorded on standardized forms containing the key questions and answer elements of the HAZOP; one form for each line segment investigated, one form for each equipment item investigated.
The ribults of the HAZOP studies were recorded on the SWEC proprietary computerized program "PCHAZOP", which is a PC based program designed to provide a simple method for recording and * documenting the HAZOP process. The program is designed to run in a database environment to facilitate data storage and retrieval.
The results of the HAZOP studies are included in the Appendix within Section A sorted according to criticality rank end within Section B sorted according to equipment number or line segment.
section 3.5 Preliminary hazard identification
During the initial stage of the HAZOPs, the team should prepare a preliminary list of potential hazards likely to be encountered during the study. This serves to establish the team's mind-set in hazard identification and focus attention during the study.
The preliminary hazard identification yielded the following five hazards:
Impact - from a fall or from contacting rotating heavy machinery potentially causing physiological injury, death, or equipment damage.
Fire - resulting from the ignition of a flammable material potentially causing physiological injury and or equipment damage.
Thermal burn - resulting from the contact with a hot or cold material potentially causing physiological injury due to thermal stress.
Corrosion - resulting from non-contained chemicals potentially causing equipment failure.
3-5
VAB.0001089160
A
Section 3*6 Criticality mluatlon
During the initial stage of the HAZOPs, the team should develop a criticality rating and a probability rating for preparation of a hazard ranking matrix. This is to allow screening of identified hazards by prioritization and sorting to focus subsequent corrective action on the significant identified hazards; eliminating the insignificant or trivial hazards from any further consideration
To this end, a hazard rating index and a risk ranking matrix was developed in the HAZOP team review as follows:
BfclJUlD RATIHQ ZBDBX
Criticality Rating
I Hajor II Severe III Moderate
An incident which may result in a possible lost time injury, or a reportable VCM release, or damage or production loss greater than $1,000,C00
An incident which may result in a restricted work case, or a VCM release, or severe deunage or production lobs between $50,000 and $1,000,000
An incident which may result in a recordable injury, or moderate damage or production loss between $10,000 and $50,000
IV Slight
Loss of containment of small amounts of flammable material which may result in slight damage or production loss less than $10,000
Frequency Rating
A Frequent Expected to occur frequently in the life of a
single plant, i.e., may occur more frequently than
once per year
B Probable Expected to occur in the life of a single plant, i.e., may occur between 1 and 100 years
C Occasional Could occur ih the life of a single plant but expected to occur once in the life of multiple plants, i.e., may occur between 100 and 10,000 years
D Remote
Unlikely to occur in the life of multiple plants, i.e., may occur less frequently than once per 10,000 years
3-6
VAB.0001089161
RISK RANKING MATRIX
Frequency
AB
C
D
C R I T I C A L n*
t
Y
The risk ranking codes assigned to each grid of the risk ranking matrix are as follows:
Risk Ranking
1 Unacceptable
Mitigation planning should be completed within six month# using engineering and/or administrative controls to reduce the risk ranking to a 3 or less.
2 Undesirable
Mitigation planning should be completed within twelve months using engineering and/or h<taM^a40tXRtive controls to reduce the risk ranking to a 3 or less.
3 Acceptable with controls
Should be verified that procedures or controls are in place
4 Acceptable as
No mitigation action required
3-7
#
VAB.0001089162
SECTION 4. MITIGATION SECTION 4.X MITIGATION SUMMARY
ITEMS WITH A CRITICAL RARE OF 1
Risk COdS I-A No references sighted.
Risk Cods I-B No references sighted.
Risk Cods II-A No references sighted.
ITEMS WITH A CRITICAL RANK OF 2
Risk COdS I-C No references sighted.
Risk Cods II--B One reference sighted.
d
Item 1
Malfunction Causing in reverse flow of VCM into Depletion of the plant nitrogen system due which may result in a severe consequence of probable occurrence. 1 reference see nacres 1
Risk Cods III--A No references sighted.
h
VAB.0001089163
3-8 SECTION 4.2 MITIGATION SHEETS
SUMMARY OF CRITICAL IDENTIFIED HAZARDS
Page 1
5305 DECALCIFIED WATER SYSTEM
.L' i
y
CRITICAL RANK: 2,UNDESIRABLE - SHOULD BE IMPROVED * SEVERE CONSEQUENCE
= PROBABLE OCCURRENCE
DEVIATION:
REVERSED FLOW
II--B
EQUIPMENT NUMBER:
LIMES 101/102/106
EQUIPMENT DESCRIPTION:
45-1013 INLET LINE
CAUSE:
BOTH WATER CHARGE PUMPS FAIL AND CHECK VALVE FAILS WHILE CV--103B/MV(106) ARE OPEN
CONSEQUENCE: VCM TO HOT WATER TANK, VCM RELEASE.
SUGGESTED MITIGATION:
SRO LOW FLOW ON CHARGE WATER, SRO PUMP RUN INTERLOCKS
n
plovl +0 d
RESOLUTION:
COMMENTS:
VAB.0001089164
Page No, 11/05/90
1
VISTA CHEMICAL COMPANY (5305 DECALCIFIES HATER SYSTEM) HAZQP Study Data Report (Grouped by Risk Codes)
Risk Criticality Equip II
PUD
^ l Frequency Cquipueet Description
**** ******** >MMMntinntuixttnn:mnMtt
Deviation Description
Caused By:
Consequences: tstnsnatmnmamnnnus
Action life Request Action I tee Reap--se
H Risk Code is: 2
2 II - I LINES 101/102/104
DM013 INLET LINE
PUD: I NEN ROD
REVERSE FUN
CAUSE: DOTH PIMPS FAIL I CHECK VALVE FAtL,CV103D/HV!0i OPEN
C0NSE9: VCH TO H20 TANK, VCH RELEASE
DAH=> \JC SA Oil'll do
VAB.0001089165
k
Faye No. 11/05/90
2
Risk Criticality Equip ID Code k Frequency Equipeeet Description
VISTA CHEMICAL COMPANY (5305 DECALCIFIED HATER SYSTEM) HAZOP Study Data Report (Grouped by Risk Codes)
PUD Caused By: Deviation Description Cossequences:
Action Iten Request Action Itee Response
It Risk Code is: 3 3 III - B BRINE NKUP I CHS TKS PUD: I I 2 TANKS IN BOTH MODULES
CORROSION
III - I ION El VESS 43-1013 PtID: 1 NEH NOD ION EXCHANGE VESSEL
REVERSE FLOH
III - B ION El VESS 43-1013 PUD: I NEH MOD ION EXCHANGE VESSEL
REDUCED TEMPERATURE
3
II - C LINE 103/10B/109
PUD: I NEH HOD INCREASED PRESSURE
45-1013 DISCHARGE LINE
III - B LINE 103/108/109
PUD: I NEH MOD
45-1013 DISCHARGE LINE
REVERSE aOH
3
III - B LINE 103/100/109
PUD: 1 NEH MOO REDUCED TEMPERATURE
45-1013 B1SCHAR6E LINE
I III - B LINE 105/110/104 PUD: NEH MOD INCREASED FLDN
PROCESS H20 THRU 45-1013
3 II - C LINES 101/102/104 PAID: 1 NEH NOB INCREASED PRESSURE 43-1013 INLET LINE
3 III - B LINES 101/102/104 PUD: 1 NEH NOG REDUCED TEMPERATURE 45-1013 INLET LINE
3 III - B P 702 TO LINE 110 PUD: I NEH NOD INCREASED PRESSURE REGENERATION HEAOER
CAUSE: POOR RINSING
ACT: SRO OTP ON CLEANUP PROCEDURES
CONSEO: STRESS CORROSION CRACKING, TANK FAILURE
DAN=>
CAUSE: SEE LINE 103/108/109
CONSEO:
CAUSE: SEE LINE 101/102/104
ACT:
CONSEO:
CAUSE; SEE LINE 101/102/104
CONSEO:
CAUSE: BOTH PUMPS AND CHECK VALVE FAILS,CV103C/HV OPEN
Ar- * +.
ir .
.4
CONSEO: LOOSE ION RESIN. SLON H20 CHARGE
CAUSE: SEE LINE 101/102/104
CONSED: CAUSE: 105IIV OPEN TOO MUCH CONSEO: FLUSH OUT RESIN
r^ STARTUP
BAN*>
ki
-hi. fa
CAUSE: FIRE, HV CLOSE, FILTER PLU6, LINE PLUG, PRV101/102 FAIL
ACT:
CONSEO: VESSEL FAIL, 6ASKET FAIL, LOSS PROD, INJURY
4
CAUSE: COLD H20 CONTROL FAILS, LACK OF USE, INSULATION OFF
ACT: SRO NINTERUATION PROCEDURES AND DTP ON N1NTEREI1NI, PN INSUL
CONSEO: FREEIE SYSTEH, COLD CHARGE (PARTICLE SUE)
JHV*>
CAUSE: P-702 DEADHEAD/BACK PRESS CONTROLLER FAIL, MOHV OPEN/BACKPRESS
CONSEO: PUHP FAILURE (OLD ROD MORE CR1T1CAI DUE TO PIRIP TYPE)
ACT: BYPASS BEING ADDED IN OLD NODULE (EXISTS IN NIN HOOI, SON OTP
*
JLN=>
(fotJ
VAB.0001089166
t.
Pije No.
11/05/90
3
Risk Criticality Equip ID Code t Frequency Equipaeet Description
t
VISTA CHEMICAL COMPANY l5105 DECALCIFIED MATER SYSTEM)
HA2QP Study Data Report
(Grouped by Risk Codes)
PUD Caused By: Deviation Description Consequences:
Action Iten Request Action I tea Response
tt Risk Code is: 4 4 IV - A 2-W-207 TANK Efl LINE
4 IV - A 2-MO-207 TANK EO LINE
4 IV - A 2-MO-207 TANK EQ LINE
4 IV - B 2-MO-207 TANK EO LINE
PUD: 2 OLD KOI NO FLOM PUD: 2 OLD HOI REDUCED FLOM PUD: 2 OLD HOD REDUCED PRESSURE PUD: 2 OLD HOD REDUCED TEMPERATURE
CAUSE: VALVE CLOSED, PUMP FAILURE CONSEO: PARTIAL REGENERATION
4C*r 4M OTP
CAUSE: PARTIAL MV CLOSED, LINE BLOCKA6E, PUMP PROBLEMS
CONSEO: SLIM REGENERATION
T-V i -.r1
SjNCTF
f
CAUSE: PUMP BLOCKED IN AT TANK
CONSEO: PUHP CAVITATION
CAUSE: COLD HEATHER
CDNSEQ: FREEZE LIKE AND PUHP
IV - A
ION El VESS 45-1013 PUD: I MEN NOD ION E1CNRNGE VESSEL
NO FLON
CAUSE: SEE LINE 101/102/104 CONSEO:
ACT:
4
IV - A ION EX VESS 45-1013 PUD: 1 MEN NOD INCREASED TEMPERATURE
CAUSE: SEE LINE 101/102/104
ION EICHRN6E VESSEL
CONSEB:
4 IV - A ION El VESS 45-1013 PUD: 1 KEN HOD REDUCED FLOM ION EXCHANGE VESSEL
CAUSE: SEE LIME 103/100/109 CONSED:
4 IV - A ION EX VESS 45-1013 PUD: ! MEN HOD REDUCED PRESSURE ION EXCHANGE VESSEL
CAUSE: SEE LINE 101/102/104 CONSEO:
4 IV - A ION El VESS 45-1013 PUD: 1 NEH HDD MAINTENANCE ION E1CHAN6E VESSEL
CAUSE: REPLACE RESIN, INSPECT INTERNALS, SAMPLE RESIN, TEST PRV
CONSEB: POTENTIAL VCH EXPOSURE, POTENTIAL SLIP/TRIP HAZARDS
i
di*i1' ' 1<
4 IV - A ION EX VESS 45-1013 PUD: 1 NCR MOD STAR TUP/SHUTDOWN ION EXCHANGE VESSEL
CAUSE: REPLACE RESIN, SAMPLE RESIN, INSPECT VESSEL
CONSEB: DISRUPT DEO, POTENTIAL BURN HAZARD, LEAK NATER INTO VESSEL
-W
DAHO
w mmtmmmmmrnmimmitm
PMMMPMMMNMW
PPPPPP
VAB.0001089167
P*9 No.
11/05/90
4
Risk Criticality Equip ID Code 1 Frequency Equipsent Description
VISTA CHEMICAL COMPANY <5305 DECALCIFIED MATED SYSTEM) HAZQP Study Data Report (Grouped by Risk Codes)
PtIB
Caused By: Deviation Description Consequences:
Action Itea Request Action Itee Response
4 IV - B ION El VESS 45-1013 PiID: I NEN NOD INCREASED PRESSURE
ION EXCHAN6E VESSEL
CAUSE: SEE LINE 103/I0B/I09 CONSEO: DEADHEAD TREATMENT PUMP
ACT: 5R0 OTP
4 IV - A LINE 103/108/109 PUD: 1 NEN NOD NO FLON 45-1013 DISCHARGE LINE
CAUSE: SEE LINE 101/102/104 NO FLON. 106MV/105MV OPEN
ACT
ft
CONSEB: BAD BATCH, LOST PRODUCTION. POORER DUALITY PRODUCT
4
IV - A LINE 103/108/109
PIID: 1 NEN MOD INCREASED TEMPERATURE
CAUSE: SEE LINE 101/102/104
45-1013 01SQMRBE LINE
CONSEO:
4
IV - A LINE 103/1OB/109
PUD: I NEN NOD REDUCED FLON
45-1013 DI5CMARBE LINE
CAUSE: (SEE NO FLON), FILTER PUJ66E0, NV PARTIALLY CLOSED
CONSEO: SLON CHARGE
4 IV - A LINE 103/106/109 PIID: 1 NEN MOO SAMPLING AT LINE 108 CAU5E: CHECK DUALITY 45-1013 DISCMAR6E LINE
CONSEB: POTENTIAL BURN, POTENTIAL TRIP/SLIP HAZARD
4 IV - B LINE 103/I0B/109 PIID: 1 NEN HOD INCREASED FLON 45-1013 DISCHAR6E LINE
CAUSE: ION El RESIN LOSS, 11QNV OPEN, I09HV TO DRAIN OPEN
ACT: RECOMMEND INSTALL CHECK VALVE IN LINE 110 AT PUNP. SRO DTP
CONSEO: SLON CHARGE, BACK UP INTO 9H20 TANK
JME=>
4 IV - B LINE 103/108/109 PIID: I NEN HOD REDUCED PRESSURE 45-1013 OISCHAftSE LINE
CAUSE: I09NV OPEN, ION BED PLU66ED, FILTER PLUGGED, PUMPS FAIL
CONSED: SLON CHARGE
4
IV - B LINE 105/110/104
PIID: I NEN MOO REDUCED TEMPERATURE
PROCESS H2D THRU 45-1013
4 IV - A LINE 105/110/104 PIID: 1 NEN NOD REVERSE FLON PROCESS H20 THRU 45-1013
CAUSE: TRACIN6 FAILURE,INSULATION MISSING
C0N5EB: FREEZE UP LINE. INEFFECTIVE BACKNASH, LINE RUPTURE
CAUSE: OPEN 105HV.L0SS MATER PRES.
CONSED: SLON CHARGE OR ABORT BATCH
ACT: SRO NINTERIZATION PROCEDURES
JHV=>
ACT: SEE LINE 101/102/104, CHICK VALVE LINE 105, SRO OTP
JLNO
VAB.0001089168
Page No. 11/05/90
5
VISTA CHEMICAL COMPANY 15105 DECALCIFIED HATER SYSTEM) HAZOP Stud/ Data Report (Brouped by Risk Codes)
Risk Code
Criticality Equip ID
PHD
Caused By:
It Freqeeecy Equipaeat Description
Deviation Description Consequences:
"sssassssss ststsuitvsttssssttsktvsisessissssssssesK EMfststtosesssI2cssiz:z: ssttsssngssatsssss'ssasssascsasxssssssssxs
Action Itee Requeet
Action Itee Response mS>2SN2X33nsSlSSIS522S32tSSES222:
IV - A LINE 105/110/104 PUD: 1 MEN NOD INCREASED PRESSURE PROCESS N2S THRU 45-1015
4
IV - R LINE 105/110/104
PHD: 1 MEN HOD NO FLDN
PROCESS K20 THRU 45-1013
4 IV - B LINE 105/110/104 PHD: I MEN MOO REDUCED FLON PROCESS H20 THRU 45-1013
4 IV - 6 LINE 105/110/104 PHD: 1 NEN NOD REDUCED PRESSURE PROCESS H20 THRU 45-1013
4 IV - B LINE 107
PHD: I NEN HOD REDUCED TEHPERATURE
SOFT NATER HAKE UP
4 IV - A LINE 107
PAID: 1 NEN HOD REDUCED aON
SOFT HATER MAKE UP
4 IV - A LINE 107
PHD: 1 NEN NOD REDUCED PRESSURE
SOFT HATER HAKE UP
4 IV - B LINE 107
PHD: 1 NEN NOD NO FLON
SOFT HATER HAKE UP
4 IV - t LINE 107
PAID: I NEN HOD INCREASED PRESSURE
SOFT NATER HAKE UP
CAUSE: HELL PRESSURE RES FAILURE,105 MV .jjpmmm
OPEN(NORM DP)
CONSEO: FLUSH RESIN OUT,
CAUSE: MV CLOSED, VESSa OR LINE
PLU66ED, LOSS OF H20 PRESS
CONSEO: CANT RINSE,CANT USE SYSTEM 4
CAUSE: LINE DLOCKA6E,I05HV PAR. CLOSED. DED PLUMED,
CONSEfi: IMPROPER RED FLUSH, SNITCH PROD.
CAUSE: LOSS DF H20 PRESSURE,DRAIN VALVE OPEN, HORN ORIFICE
CONSEfi: IMPROPER BED FLUSH
CAUSE: TRACING FAILURE. INSULATION HISSING
CONSEfi: FROZEN LINE, METER BURST. LINE BURST
ACT: SRO HINTERIZAT10N aAH JHV*>
CAUSE: ACTUATED OR HV PART. OPEN. METER PROBLEMS
CONSEO: SLON HAKE UP, DVERFLOH TANK
CAUSE: SEE 103/108/109
CONSEfi:
CAUSE: HV CLOSED,METER FAILURE,ACT, VALVE FAILURE,
CONSEO: CANT MAKE UP ANY HATER, RAKE UP BY ALT METHOD
CAUSE: BLOCKED ACT VALVE I 107HV OPEN CONSEfi: POTENTIAL METER FAILURE
ACT: CHECK METER PRESSURE RATINGS.SRO OTP
JLH='
VAB.0001089169
Page No. 11/05/90
6
VISTA CHEMICAL COMPANY (5305 DECALCIFIED HATER SYSTEM) HAZOP Study Data Report (Grouped by Risk Codes)
Risk Criticality Equip ID
Code A Frequency Equipaent Description : i=-:=st:Ksra:s;izrxti
PHD Caused By: Deviation Description Consequeeces:
Petion I tea Request Action Itea Response
fsit3t:sszs=ssssssxtssss
4 IV - A LINES 101/102/104 PHD: 1 MEN HOD NO FLON 45-1013 INLET LINE
CAUSE: CV flISALIGN,MV CLOSE,FILTER PLU6.LINE PLUS,LOSS H2D,PONER FAILURE
m mm hater
4
IV' - A LINES 101/102/104
PHD: 1 NEN NOD INCREASED FLON
45-1013 INLET LINE
CDNSED: PROD LOSS,VCM NISCHAR6E.BAD BATCH
CAUSE: HV104 0PEN,PRV101 OR 102 OPEN.ION RESIN LOSS,
CONSEO: SLOW CHARGE
4
IV - A LINES 101/102/104
PUD: 1 NEN HOD INCREASED TEMPERATURE
CAUSE: COLD H20 CONTROL FAIL,
45-1013 INLET LINE
CONSEO: REACTOR TEHP ALARH
ACT: LAP
4
IV - A LINES 101/102/104
PHD: I NEN NOS REDUCED PRESSURE
45-1013 INLET LINE
CAUSE: HVIOt OPEN, PRV101 OR 102 OPEN, KV TO SENER OPEN, PUMP FAILS
4 IV - A LINES 101/102/104 PUD: 1 NEN NOD MAINTENANCE 45-1013 INLET LINE
CONSEfl: SEE NO FLON
CAUSE: VALVE FAILURE, FILTER PLUG, P6 AND TB ACCESS
ACT: NAINTAIN SAFE MORK PRACTICES
4 IV - B P 702 TO LINE 110 PUD: 1 NEN NOD NO FLON REGENERATION HEADER
CONSEO: LIFT/FALLING/SLIP POTENTIAL HAZARD
CAUSE: HV CLOSED, PUMP FAILURE, LINE BLOCKED, TANK ENPTV
4 IV - B P 702 TO LINE 110 PUD: 1 NEN NOD REVERSE FLON REGENERATION HEADER
4 IV - B P 702 TO LINE 110 PHD: 1 NEN NOD REDUCED FLON REGENERATION HEADER
CONSEO: NO REGENERATION, SNITCH PRODUCTS 4
CAUSE: CHECK VALVE FAIL 1 NV OPEN
CONSEO: OVERFLON TANK, SLOK CHAR6E TO REACTOR
CAUSE: DRAIN VALVE OPEN, PLUGGED RO, BPCV FAIL OPEN
4
IV - E P 702 TO LINE 110
PUD: 1 NEN NOD REDUCED PRESSURE
REGENERATION HEADER
CONSEfl: SLDH REGENERATION, NAINTENANCE REQUIRED
CAUSE: DRAIN VALVE OPEN, PUHF FAIL, HORN RO
CONSEfl: SEE REDUCED FLOW
VAB.0001089170
Page No. 11/05/90
7
VISTA CHEMICAL COMPANY (5305 DECALCIFIED HATER SYSTEM) KAZQP Study Data Report (Grouped fay Risk Codes)
Risk Critical i ty Equip ID
PAID
Caused By:
Code t Frequency Equipeeet Description
Deviation Description Consequences:
S3SM*Uft32I lBfC2fWR3SSlSCtt8XS3tSS stsssxssss::ss xxxxni2R=B=xssx==r:r33== 3tX3E3SSS3XZS3XXS33S=SXIS3SSSSSS3X3S=;S5
4 IV - B t 702 TO LINE 110 PAID: 1 NEN NOD REDUCED TEMPERATURE
REGENERATION HERDER
CAUSE: SEE P-701 PUMP SUCTION AND DISCHARGE
Action Itee Request Action Itee Response XSX35S=X3X3S3X3tt3SSC333XXX333333=X3;S
ACT:
4 IV - B P 7 TO UNE 110 PAIR: I NEN HOD CORROSION REGENERATION HERDER
4 IV - A P-701
PAID: I NEN NOD INCREASED PRESSURE
PUKP SUCTION AND DISCHR6
4 IV - B P-701
PAID: 1 NEN NOO NO FLON
PUMP SUCTION AND DISCHRS
CONSEQ:
CAUSE: POOR FLUSH OF BRINE HATER CONSES: UNE AM) EQUIPMENT FAILURE
IPPtlr ilDMiAk-.'
CAUSE: CLOSED NV CQNSEO: DEADHEAD PUMP
mimw
t
:, M*
J
CAUSE: VALVE FAILURE, PUMP FAILURE, LINE PLU66A6E, LS FAILURE
ACT:
4 IV - 6 P-701
PAID: 1 NEN NOO REDUCED FLON
PUHP SUCTION AND DISCHR6
A
CONSED: CANT REGENERATE, SNITCH PRODUCTS
CAUSE: NV THROTTLED, CHK VALVE FAILURE. NORN PUMP,SUCTION VALVE CLOSED
ACT:
CONSES: RUN PUHP MY, DELAYED REGENERATION
VAB.0001089171
IP
Page No. 11/05/90
L
Risk Criticality Equip ID Code l Frequency Equipment Description
VISTA CHEMICAL COMPANY (5305 DECALCIFIED HATER SYSTEM) HAZOP Study Data Report IBrouped by Risk Codes)
PUD
Caused By: Deviation Description Consequences:
It Risk Code is:
2-NQ-207 TANK ED LINE
PUD: 2 DLD 1)00 REVERSE FLOH
2-ND-207 TANK ED LINE
PUD: 2 DLD NOD INCREASED FLON
2-NO-207 TANK EQ LINE
PUD: 2 OLD HOD INCREASED PRESSURE
2-N0-207 TANK ED LINE
PUD: 2 DLD HOO INCREASED TEMPERATURE
BRINE HKUP L CHS IKS PUD: I I 2 TANKS IN BOTH NODULES
NO FLON
BRINE HKUP t CH6 TKS PUD: I I 2 TANKS IN BOTH NODULES
REVERSE FLOH
BRINE HKUP ir CHS TKS PUD: 1 I 2 TANKS IN BOTH H00ULE5
INCREASED FLON
BRINE HKUP I CH6 TKS PUD: 1 t 2 TANKS IN BOTH NODULES
INCREASED PRESSURE
IRINE HKUP I CHS TKS PUD: I I 2 TANKS IN BOTH K0BULES
INCREASED TEMPERATURE
BRINE HKUP It CHS TKS PUD: 1 I 2 TANKS IN BOTH NODULES
REDUCED FLON
BRINE HKUP l CHS TKS PUD: I l 2 TANKS IN BOTH MODULES
REDUCED PRESSURE
BRINE HKUP t CHG TKS PUD: 1 t 2 TANKS IN BOTH MODULES
REDUCED TEMPERATURE
CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: NAP CONSEO:
Action Itee Request Action Itea Response
* *
ACT:
Hw
VAB.0001089172
vm mmmmm
wmm
Page No. i1/05/90
2
Risk Criticality Equip ID Code It Frequency Equipment Description
VISTA CHEMICAL COMPANY 15305 DECALCIFIED HATER SYSTEMI HA?OP Study Data Report (Grouped fay Risk Codes>
PUD
Caused By: Deviation Description Consequences:
Action Itea Rtqufst Action Itn Nsponu
I DR El VESS -1013 PHD: | NEH MS ION EXCHANGE VESSEL
INCREASED FLOK
LINE 105/110/104 PUD: 1 NEH MD PROCESS H20 THRU 45-1013
INCREASED TEMPERATURE
LINE 105/110/104
PUD: I NEH MO MAINTENANCE
PROCESS H20 THRU 45-1013
LINE 105/110/104
PUD: l NEH HOD
PROCESS K2D THRU 45-1013
CORROSION
LINE 107 SOFT HATER HAKE UP
PUD: 1 NEH NOD REVERSE FLON m
LINE 107 SOFT HATER MAKE UP
PUD: I NEH Ml INCREASED FLON
LINE 107 SOFT NATER HAKE UP
PUD: 1 HEN MD INCREASED TEMPERATURE
LINES 101/102/104 45-1013 INLET LINE
PUD: 1 NEK NOD REDUCED FLON
P 702 TO LINE 110
PUD: I NEH MOD IMCREASED FLOH
REGENERATION HEADER
P 702 TO LINE 110
PUD: 1 NEH MD INCREASED TEMPERATURE
REGENERATION HEADER
P-701
PUD: 1 NEK MOD
PURP SUCTION AND DISCHR6
REVERSE FLOH
P-701
PUD: 1 NEH MOO
PUMP SUCTION AM DISCHR6
INCREASED FLOH
CAUSE: NAP CQNSEQ: CAUSE: ELEC TRAC HEATIN6 CDNSEB: NAP CAUSE: FLON METER FA I LURE/CALI MAT ION CONSEO: NAP CAUSE: FAILURE TO FLUSH 105 CONSEO: NAP CAUSE: NAP CONSEO: CAUSE; NAP CONSEO: CAUSE: NAP CONSEO: CAUSE: SEE M FLON CONSEO: CAUSE: DRAIN VALVE OPEN BEFORE VESSEL CONSEO: NAP CAUSE: NAP CONSEO: CAUSE: CHECK VALVE FAILURE I PUMP OFF, DRAIN VALVE OPEN CONSEO: NAP CAUSE: NAP CONSEO:
*
*
t
4
4
t/
#
T
VAB.0001089173
' rm
Page No. 11/05/90
3
VISTA CHEHICAL COMPANY 15305 DECALCIFIES HATER SYSTEM) HA20P Study Oita Report (Grouped by Risk Codes)
Risk Code
ssss
Criticality Equip IS I Frequency Equipment Description
PUS Caused By: Deviation Description Consequences:
SSS3S33SSSS3 3B3SS33S3S3CS3S33Sa3SS3S33S33333333SS33 SSSSSBSSSSSSSSSZKSSSBSSSS *BSSSSSSS=SS3S33S=SSS3S33*
P-701
PIID: 1 NEH HOD INCREASED TEMPERATURE
PUMP SUCTION AND DISCHR6
P-701
PUD: 1 NEH HOD REDUCED PRESSURE
PUHP SUCTION AND DISCHflG
P-70!
PIID: 1 NEN HOD REDUCED TEMPERATURE
PUHP SUCTION AND DISCHR6
CAUSE: NAP CONSEQ: CAUSE: NAP
CONSEQ:
CAUSE; SEE LINE 107 CONSEQ:
Action Itee Request Action Itee Response
ACT:
ACT:
ACT:
l
VAB.0001089174
VAB.0001089175
NEW MODULE . DECAL WATER SYSTEM P&ID
MHif'i- HP- lti||rHP 'HM' -i .Ht'IMlh
'mi'ilH J'-I-UI- "I'`irimfe...........................................................................................
............................................hph.................
..
^nwomnwh,.^wihiiifcHiiytfitto^tniKto^wpjn,. ................................................................................................................................................................................hum
1 -i
ao
yo
?
c-jv-n-zu-to-z
2
g 3
*a
T
El &
i
00 h- ac O CL
i o
Ts
\<o Ul 8
Q
i
sdnnd aetMo
NOfcl
1i
- *
r"
**
H
** - i
CM
O I
Q_
VAB.0001089176
3-8 SECTION 4.2 MITIGATION SHEETS
SUMMARY OF CRITICAL IDENTIFIED HAZARDS
Page 1
5305 DECALCIFIED WATER SYSTEM
CRITICAL RANK: 2,UNDESIRABLE SHOULD BE IMPROVED = SEVERE CONSEQUENCE - PROBABLE OCCURRENC
DEVIATION:
REVERSED FLOW
II-B
EQUIPMENT NUMBER:
LINES 101/102/106
EQUIPMENT DESCRIPTION:
1013 INLET LINE
CAUSE:
BOTH WATER CHARGE PUMPS FAIL AND CHECK VALVE FAILS WHILE CV--103B/MV(106) ARE OPEN
CONSEQUENCE: VCM TO HOT WATER TANK, VCM RELEASE
SUGGESTED MITIGATION: SRO LOW FLOW ON CHARGE WATER, SRO PUMP RUN INTERLOCKS
RESOLUTION:
COMMENTS:
VAB.0001089177
To ScH___ From
DtA
Calculation Sheet
%
<^nwo
L' ST
PgUiflTK?*)
K>fZ\JefiS F*\jh^ -iuCb lot| )ox| 10C41
d/l AJq Fux*>
se^ FLolo C)/U4s /o$y f/tj/oV
UUL
\s i^si^l/i/g
I P/oow9
0 S OAolwm
KO-tOf / prey'd' //7cAt*$t> ^Locd, OJ>u* lsenn=y uf)*ro f7~m?r~
/)/! or#n
sreftc (*/flr SV?o 077 **\et frJt //
totesur^
0p4*ntch(y
7>&*o
Made By ----------------------------------------------------Date ----------------------------------------------------------Page of_____________________________________
V3-20G-S
Job No. Title ________
VAB.QQQ1Q89178
ft ft T
R 1 ft 1
r^ A F E T Y
i^
a* + ** #hf *-
^ VP* * * i
* * P* - frp4 *4* - **> * P
0 o w C h e i'i'i i c -a i. i.i * S * ft * a
Midi, a n d ,
1) A i A
##- *- *4* r- 4HI 4if M * *-#*
HI h
ft I 4 8 6 7 4
stj H E H T
* M
*4*> t#-
4 +
mergency Phone:
tfc' +P
517-36 -440
i-' r o tf u c t C o 6 e : 1- 3 0 6 6
P a g e : -,
Product Name: DOWEX (R) MSC-1, 20-50 MESH, NA CATION EXCHANGE RESIN
E11 0 c t i v e D a t e : 0 6 / 1 8 / 9 (>
D a 10 P r I n t e d : 0 9 / <) !5 / 9 0
M S D: 001153
1 J.NGRDIENTS ; ( % w / w , u n I. e-as o therw i se no ted )
Su 1. f ona t 0d copoiymer of s t y r 0 *n e a n d
divinytbenze ne in the sodium form Wa t 0r
CAS* 069011-22-9 CAS* 007732-18-5
40- 1 OX
This document is prepared pursuant to the 03HA Hazard Communication Standard (29 CFR 1910.1200)* In addition, other substances not `Hazardous1 per this OSHA Standard may be listed. Where proprietary ingredient shows, the identity may be made avaliable as provided in this standard*
V
Aa * *\
P (-i Y SIC A L D A T A :
8 QILIN G P 01N 1
No t app i. i cab l e
V A P p R If. <- No t app I. i cab i. e
VAP 0ENSIT Y : No t app I. f cab i. e
S 0 J.. a IN I/; A f l R : I n soLub L e
GRAVI T Y : Density 53 I. b / f 13
APPEARANCE: Light yeLLow to amber ODOR: Not applicable
solid
(beads)
3. FIRE AND EXPLOSION HAZARD DATA:
F LAS H P01N T: ft E T H 0 D U S E D :
Not applic. Not app i. i c .
FLAMMABLE LIMITS
L. F L.
N o t a p p I. i c *
UFL
N o t a p p L i c: .
EXTINGUISHING MEDIA: Dry chemical.
** . h
X & EXPLOSION HAZARDS: Product is not combustibLe
u vi t i l m o i s t u r e \ s r e m o ved, the n r e s i n s t a r t s to bur n i n i' I. ante a t 230C. Au to i gn i t i on occu rs above 500C.
Naphthalene, benzaldehydes, phenol, carbon dioxide, water, su l f u r ox i des , o r gan i c su i. t ona tes a r e poss i b L e t i r e combust i on p r o du c t s .
FIft E - FIG H TIN G E 0 UI P ft E N :
b r ea t hing apparatus.
Wear positive pressure self-contained
(C o v 11 i n u e d o n P a g e 2 ) < R ) I n d i c a t e s a T r a d a m a r i< o f T h e Dow C h e m i c a l C o m p a n y
x A n 0 p e rat i n g IJ n i t 0 f T h & D o w C h e m i c a l C o m p a n y
*
VAB.0001089179
V
MA Dow
T ER I Ai
c> A F T Yr'wtt
* il* I
f |HI 4P i Mp t
4
Chem ica I. U * 3 * A *
Midland,
I) A T A HI 43674
SHEET
*B f**
Emergency Phone:
-
517--636--4400
I-' t o d u c t C ode : 2 3 0 6 6
Pa ge : 2
Product Name: DOWEX (R) MSC-1, 20-50 MESH, NA CATION EXCHANGE RESIN
E t f & c t i v D a t e : O 6 / "i S / 9 <)
Date Printed: 09/05/90
MSD: 001158
4 R E A C T I! VI TY I> A T A :
S T A B X LIT Y : < CONDITIONS TO AVOID) Stab i. e u n de r no r ma i. handling
and s tor a ge conditions* See i ncowpa tibility sta tement
INCOMPATIBILITY: (SPECIFIC MATERIALS TO AVOID) Warning: Oxidizing agents such as nitric acid a 11 a c k organic ion exchange resins under certain conditions and could result in slightly degraded resin up to an explosive reaction* Before using strong oxidizing agents, consu L t sources knowledgeable h a n d t. i n g s u c h m a t e r la i. s *
a in
HAZAR D0US DEC0MP0SITION PRODUCTS:
Pro du c t s in sectio n 3 *
See possible co m bustio n
HAZARD0US P0L YMERIZATI 0N: W i I. I. n o t o c cur
c: E N VIR 0 N M E N T A l A N 0 I) 13 P 0 S A L 1N F 0 R M A T 10 N :
ACTION TO TAKE TOR SPILLS/LEAKS: s L i ppery *
Sweep up
Caution: May be
DISPOSAL METHOD: Bury resin in licensed landfill or burn in approved incinerator according to Local , state, and federaL regulations* For resin contaminated with hazardous material dispose of mixture as hazardous material, according to local, s t a t e , a n d fede r a L r e gu L a t i ons *
A i IE A L r H H A Z A R D D A T A :
EYE
May cause sLight transient (temporary) eye irritation*
Solid or dust may cause irritation or corneal injury due to mechan i c a I act i on *
S K I N C 0 N T A C I : Essentially nonirrita ting to sk in*
S K I H A B S 0 R P T10 N
P rope r t i es *
Sk i n absor p t i on i s u vi L i k e L y due t o phys i c a l
INGESTION: Single dose oral toxicity is believed to be low*
hazards anticipated from ingestion incidental to industrial e xp osure*
No
< Con t i nu e d o n Pa ge 3 ) < R ) I Vid i cates a T r a demark o f I he Dow Chem i c a i 0omp any
* A n 0 p rat i n g U *n i t 0 f T It e D o w C h e m i c a I. C o m p a n y
*
VAB.0001089180
ha
IH*
Dow
r e k t a l.
sa
"** * li#*
*'-4 4 41 +**i
4 M4
L-'hem i c a I. U * SA * x
f !: r r
DA TA
V-#*
* t*4 r 4+m 1 <4 |>* 4M* i^4 iM* Ml 4f4 a|l i#4 f i4
rt i d f. a n d , ft I 4 8 6 7 4
SHEET
* *-*4-4 hn4
m ergo ncy
*i i4 M4 A** * * *4-4*
Phone : 51 / - 636-4400
P r o a u c: t C o cl 0 : 2 3066
1 aye - w
A r o d u c t N a m e : DOW E X t R ) M S C -1 .. 2 0 - 3 0 ftE S H , NA C A TION E XCHANGE RESIN
E t tec: t s ve Da 10 : 06/1 8/90
D a + e P i- i n ted-' 0 9 / 05 / 9 0
MSD: 001158
6 * ; 1 A L r H H A / A ft D D A T A : < C 0 N T IN U E D )
INHALATION: Vapors are unLikely due to physical properties
SYSTEMIC & OTHER EFFECTS-; No spec 1 f i r. da t a
repeated exposures a re not ant 1cipa ted to adverse effects*
a va I l ab l e , however , cause any signI ficant
< FIRST AID:
I- V ir c- -
1**- I Iih
*
I r r i ga t e i inine d i a t e l y with
e r for a t lea s t 3 m i nutes*
3 KIN: No adverse e f f 0ct s anticip a t edd by this r 0 u t of exposu re.
I N G E S T10 N : No adverse
1 p a t e d by t h 1 s r ou t e of
0xposu re i nc 1 den t a 1. to proper 1 ncms trial handling*
I N H A L A T10 N : exposu re *
No adver se effee ts a nt 1 cipa ted by t his route of
8 H A N D I.. IN G P ft E C A U T10 N S :
EXPOSURE GUIDELINE(S > : None established*
V E N TIL A TI 0 N : Good g e n e r a l v e n t i l a t i o n s h o u I. d b e s u f f 1 c 1 e n t
R S P IR A T 0 R Y P R 0 T E C T 10 N : nee de d *
N o r 0 s p i r a t o r y protect! o n s h o u 1. cl h 0
SKIN PROTECTION: No" precautions other than clean body-covering c: L o t h in g sh ou I. d h e nee de d *
I:. Y E P R 0 T E C T ION: Use s a f e t y g I. a s s e s
9 * ADD IT I GNAL. INFORMAT I ON :
SPECIAL PRECAUTIONS TO BE TAKEN IN HANDLING AND STORAGE:
I- ' r a c: tic r c? a s o n a o l e c a r 0 a n d c: a u t i o n * M 0 t a I. e g. u 1 p m 0 n t s h o u I. ci
be c ompa t i b i. e w 1 t h f eea , r 0 gener an t , r es i n f or m , a na ef f I. un t o f that p r ocess *
( C o n t 1 n u. e <.1 o n P a g e 4 ) () Indicates a Trademark of The Dow Chemical Company
* A n 0 p e rat 1 n g U n i t 0 f T h e D o w C h e m i c a l C o m p a n y
VAB.0001089181
MA Dow
ER I AI
A
i.:
t
t:
i
y
mt
*f>i |#p itof
*V
i
C n e ifi i c a I. U a 3 * A * *
M s clI. ancl,
IX A
A
ih>
- * * ** t#* '
MI 4Q674
3HEE I
i-* *<
Emer gency
* ** * w ^
Phone :
31 7 *** 636-* 4 4 0 0
P r o d u c i C o ci e : ' o`V '.v o 6
Product Name: DQUEX (R) MSC-1, 20-30 MESH, NA CATION EXCHANGE
Pa ge : 4
1 SIN
15. f f e c t i v e D a t e : 0 6 /1 8 / 9 0
Date P r i n t e cl : 09 / O 3 / 9 0
MSD: 0 0113 8
9 A adon :i:onal information <contj:nued >
rSCA CON SID ER A T10N S:
Every d i f f e r en t s a I. t o r I o n i c f o r m o f a n i o in - e xchange Test n
i s a s e p a r a t e c h e m j cal. If .you use an i on-exchange res i n
for ion-exchange pu rposes and then
1 t o rrt i t s v e s s e I. o r c on t a i ner prior
o r a n o t h e r f o r m o f the res i n or of b y - profluc t r e s i n or u st be I. i sted on
remove the by~p r oduc t resin t o recovery of the or j g i na I. another chem i ca 1. , the the ISCA Inventory (unless
a n e x e n> pt io n i s a p p i t cab I. e) * It is the respons ibiL i ty of the
customer to ensu re tha t such i so l. a ted , recyc i ed by-produc t
r e s i n s are i n c: m p I. i ance with I'SCA. Failure to comply could
r e s u f. t i n 5 u b s t a n t t a l c. i v i i. o r cr i m i n a l p e n a 1.1 i e s ta e i n g a s s e s s e d
by the Environmenta I. P r o t e c: t i o n A g e n c: y *
NSDS STATUS: Revised section 9 and regsheet
*
( Con t : nue d on Pa ge 3 ) < R ) .1 n d i c a t es a T r a derna r k : * t r h e I) o w C h e m i c a L C o rn p a n y
* An Operating Unit Of The Dow Chemical. Company
VAB.0001089182
MA
F -f4 r f
0ow
rER 1 A
oA
* -* ^4 - * 4 **M VM* -
C h e m i c a I. iJ * S * A* *
FE
4 4| * *f
T
1? A f AY t
^ i >
H*i t** +ii Mil Ht*
*k#4 *4 f -H *
Mi d l. a nd , M I 48674
SHE
* H ^l Ht*
4H *
mergency
Phone :
MH
r^4 pa*4
51 7- 636-4400
P r oduc t U o cl e : 23 066
I"' t o du c t Na me : 00WX ( R ) MSC-1
Pa ge : 5
20- 50 MESH, N A CATION EXCJ-l ANGE RESIN
E f f 0 >:: t i v e u a t e : 0 6/1 B / 9 ()
Data Printed: 09/05/90
MSI) : 001153
*
ft E G U i_. A I D ft Y i H FORM A T 10 N :
r 0 gu I. a t i ons r ep r sen t e d * )
t- No t nte a n t t o b e a l L - i nc L u s i ve--se 1. ec ted
n o r i CE : The information herein is presented in good faith and bel. i eved to be accurate as of the effective-? date shown above*
H o w e ve r , no wa rranty, express or i dip !. i e d , is given* Regulatory
re*iu iremsnts are subject to change and may differ from one
I. o c a t i on to another; it is the buyer's responsibility to ensure t h a t* its activities comp I. y w i th f edera l , s ta te o r provi nc i a L , a vi d Local Laws* The following specific information is made for the purpose of complying with numerous federal, state or provincial. a n d Iocal taws a nd r egula tions* See M3D Sheet for hea11h and
sa fe ty i n fo rma t i on
U s * ft!:. G U L A T10 N S
9* IW It*f
4I<( !*
mi mi
*4i* * 1
ntl #l|l
+ 4**
Ml
w(SARA HAZARD CAIECORY: Th i s product has heen reviewed according to the ERA " Ha z a r d Ca t e go r i es " p r omu I. gate d u n de r Bee t i ons 311 and 312 of the Super fund Amendment and Reauthorization Act of 1986 (SARA iitle III) and i s cons i dered , under app I. i cab t e def i n i t i ons , to meet the f ol I. ow i ng c a t egor i s :
Not t o h a v e m e t a n y h a z a r d c a t e g o r y
i j A N A i) IA N
' > *1
J
4 fill
* #t *i*a
R G U L A'T 10 N S
4* * + f
pfe |M
* # *41 + *44 |
44 * >* ** <*
* t* i*** + **+ * t
p
H --4
? h e WorkpLace Haz ard o us Materials Info r mat Io n System ( W * H * M * I )\J 4
si fica tion for this pr odu c t is:
D2B
#-** |W'
The Transportation of Dangerous Goods Act ( r * D * G * A * this p roduc t is:
L a ssification for
( Con t i nu e d o n Pa ge 6 > ( R ) I n d i c a t e s a T r a de m ark
Tne Dow Chemical C o m p a n
* An Operating Unit Of The Dow Chemical. C o m p a n y
V
VAB.0001089183
ft a re r i a l
s a f i-:: r y
'+* <tp ' >t * -*-
t* m
,,J* *r+* M ** + *** i4f rM t *41 iatt
HM
` >u
Dow Uhewscal. U A O A A' * X
ft i d L avid ,
DArA SHEE1
-- -*
i#t ^44 *
*-*44 #p4 441 4 * t
|t
HI 48674 Emergency F`hone :
*
5i 7-636-4400
P r o d i k c t C g d e : 2 3 0 66
Product Name: DOW E X <R) HSC-1 , 20-50
P a 9 0 6 SH, NA CATION EXCHANCE RESIN
Eff0cfive Date: 06/18/90
Da te P r i nted : 09/05/90
HSD: 001158
R E G U L. A T 0 R Y INF' 0 R ft A T10 N : (CON T 1 N U E D )
Not regulated
*
R) In dicates a Tradema r k o f Th
The I vi l; o v loa t i on Herein I s G i ven
E x p r e s - 0 r I m p I. i e d , I s Hade*
F or Fu rther Info rmation*
C
Dow Chemical In Good Faith
n , u l t t h e D o w
Company But No War ran t y,
Ch em i c a l 0omp a ny
x A vi 0 p e rat j n g IJ n i t
The
Chem i c a L Comp a ny
VAB.0001089184
THE DOW CHEMICAL COMPANY 3 A L E3 8PECIFICA TION
Q U A-i L I T Y A S S U R A N C E 0 T FICI
DATE PRINTED: 05 i* c p ; V/f *i i \
PAGE: 01
P R 01) U C T : 23066 E F F E C TIV E : 13 NOV ?1 O S U P E R S E 0 E S : 0 8 A U G 7 7
NAME; D0WEX t R) h3C-1 , 20-5O MESH, NA CAT10N EXCHANGE RESIN
D E S C: 3 1R 0 N G A CID CA T10N EX CHAN G E R E SIN IN THE SODIUM FORM G 0 V T / IN D S T D S : F D A
+ 1 - * * *
f * > w
-
** *'* M4I
- r,
I I** *
*--**
i r e: m
1 * - * 41* ` -M ++** >m *Ht i4l fHl
+ -*ft iM*
*4* *4# iii , .r<M
H4
Mat
"REQUIREMENTS
* W v l *
p- *+ Ml
LIMI Ir
F--4 PiM +-VB* 1 +M * H4f
I***-
*MI H4
UN I T
M-* 4M4 4tat
*#*
**4 -* *4a* twt 44
METHOD
-- * **f I
*** M(
W L 1 V 0 L U M E C A P A CI 1' Y MIN
W A T E R R E T E N T 10 N C A P A CI 1 Y
S P HERICITY, MIN
SCREEN ANAL ON NO* 16, MAX *
SCREEN ANAL THRU NO MAX *
40 ,
COLOR THROW, APHA, AS PACKAGED . MAX *
1 *7 44 -50
/
0 5ir< 50
MEQ/ML
it
y
VN
X
*/ /
DOWEX RESIN MD *
1
DOWEX RESIN MD 4
DOWEX RESIN MD
6
DOWEX RESIN MD*
5
DOWEX RESIN MD
l-* #
DOWEX RESIN MD
READ PRECAUTIONARY INFORMATION AND MATERIAL SAFETY SHEETS*
1 ( 11 3 PRODUCT IS SHIPPED IN COMPLIANCE WITH APPLICABLE LAWS AND
REGULATIONS REGARDING CLASSIFICATION, PACKAGING, SHIPPING AND I ABFLING
-K) INDICATES A TRADEMARK OF THE DOW CHEMICAL COMPANY
I-AST PAGE VAB.0001089185
I
I HE DOW CHEMICAL. COMPAN Y
S A L E 3 S P E CIFIC A T 10 N
QUAL I T Y ASSURANCE 0F F T CE
DATE PRINTED:
05
SEP
<; a f
P A G E : <) 1
PRODUCT: 23066 EFFECTIVE: 13 NOV 73 SUPERSEDES: 08 AUG 77
NAME; DOWEX (R> MSC-'i, 20-50 MESH, NA CATION EXCHANGE RESIN
DESC: STRONG ACID CATION EXCHANGE RESIN IN THE SODIUM FORM
GOVT/IND STDS: FDA
*-*
>^
Mil
| |4
#fM *4* fMf
I ||
i TM
- '*** #*4t Ml I-PM !
*M#
-REQUIREMENTS--------------------
LIMIT
*4* 4iM M*
uni r
METHOD
WE Ft 4 K
1- 1
: t IJ L U M E
C A P A CI T Y .
MIN
WATER RETENTION CAPACITY
SPH E RICITY, MIN
SCREEN ANAL ON NO MAX a
16,
SCREEN ANAL THRU NO. 40, MAX.
COL.UR I HROW , APHA , AS PACK AGED , hAX *
1 .7
44-50
95 8
**/
50
M E Q / MI.
v
ra
7ftt
/7
:<II
DOWEX RESIN MD
1
DOWEX RESIN MD 4
DOWEX RESIN MD
A
DOWEX RESIN MD.
1=
DOWEX RESIN MD
I-*
*m
DOWEX RESIN MD.
t
READ PRECAUTIONARY INFORMATION AND MATERIAL SAFETY SHEETS. THIS PRODUCT IS SHIPPED IN COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS REGARDING CLASSIFICATION, PACKAGING, SHIPPING AND LABELING
(R) INDICATES A TRADEMARK OF THE DOW CHEMICAL COMPANY
LAST PAGE
VAB.0001089186