DATE 1979 November 07 ALUMINUM COMPANY OF AMERICA ENVIRONMENTAL HEATH LABORATORY/INDUSTRIAL HYGIENE DEPARTMENT
PLANT VISIT REPORT
PLANT Massena Operations
DATE 79/11/01-02
MADE BY
Michael J. Vaudreuil
PLANT CONTACT(S) R* K- Morrow, G. D. Hicks, D. W. Murphy, Dr. M. J. Elder
PURPOSE
OSHA conducted an Industrial hygiene inspection of Massena Operations in July of this year. Due to the normal delays in the OSHA Analytical Lab, the closing conference could not be held until now.
On Thursday, November 01, the compliance officers fftpRne MiUniMmait. The information was to be used to substantiate alleged employee exposures. We rvfeewi their request, on the basis of privacy of medical records, and the doctor-patient relationship. This argument was not acceptable to the inspectors who cited 1910.20; a regulation giving OSHA access to medical records.
A wtpiMRr was taken after consultation with Earl Rumberger and the Pittsburgh Legal Department. It was decided that
i-uqumt.
EpByewA^wBeff"WRt"W5eiaT"SETOPTEyT!umBSy^E7!RTlU LA lUuiUHid from all information supplied to OSHA.
The OSHA inspectors agreed to the terms of the proposal. They would prepare a request
upon return to their office, the following week.
^
The closing conference (discussion of apparent violations) was held oft Friday, November 02. OSHA was unwilling to provide a complete summary of its sampling results. A written request* to the Area Director will be required to obtain the figures. Time-weighted averdge calculations will not be made available.
Without the benefit of the figures, we informed the OSHA representatives that we could not conduct a meaningful discussion of abatement dates.
The inspectors reported that
poM
would be issued for the following items:
Mi
CTPV's: pitcfTunloading, fumacemen and pot fepjaairimi en
Fluorides: bath crusher, 173 bag replacement, P-75 TCC's and cranemen '} Total Dust: bath crusher, P-75 TCC's
Heat Stress: P-75 crane operators (5(a)(1) based on NIOSH Criteria Document)
--e. Noise:
butt stripping, butt cleaning, sand molding, grinding
"W _ f . "7 Asbestos: inadequate medical surveillance for the only employee exposed to
7
g
more than 0.1 fibers/cc TWA
`
Respiratory Protection: the program .was Ridged inadequate in a number of areas
h. Eye Protection: lack of cup-type side shields for machining operations
ARCH 18618
Massena Operations Plant Visit Report Page 2 1979 November 07
The writer will return to Massena during the week of November 12 to perform additional sampling and to help develop an action plan to deal with the impending citations.
DISTRIBUTION:
E. E. RUMBERGER - PGH. 7
T. B. BONNEY
- PGH. 7
R. M. JAMES
- PGH. 7
H. G. SAKOIAN - PGH. 7
J. DAMIAN0
- ATC
C. DIXON
- PGH. 6
M. J. VAUDREUIL - PGH. 6
P. H. SCOTT
- PGH. 6
R. S. DANCHIK/D. R. BALYA -
ARCH 18619