Document byDmOEwZkx2L6jX9xq8RKE781

Region 6 Enforcement and Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) 10/02/2019 Water Brine - CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Contact: 4D Oil and Gas, LLC Osage A SWF 36.808105, -96.281125 (NE Sect. 24, T 27N, R 9E) Pawhuska, Oklahoma 74056 432 Kiheka Ave. Pawhuska, Oklahoma 74056 Osage County Main Office 918-625-7282 FRS Number: Identification/Permit Number: Media Number: NAICS: SIC: N/A N/A N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn 6ECDWE Environmental Engineer (918) 557 - 1615 EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2019.11.18 14:08:39 -06'00' GUY TIDMORE Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2019.11.19 14:27:25 -06'00' Guy Tidmore Date 19 NOV 2019 Date 6ENFORM-019-R7 (2/15/2017) 1 Section I - INTRODUCTION 4D Oil and Gas, LLC / Osage A SWF Inspection Date: 10/02/2019 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the 4D Oil and Gas, LLC oil and gas facility located at latitude 36.808105 and longitude -96.281125 near Pawhuska, Oklahoma on 10/02/2019 for an unannounced inspection. There were no representatives of 4D Oil and Gas, LLC present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION The facility consisted of the injection well with the EPA inventory number: OS 5571 and had an associated tank and pump. Section II - OBSERVATIONS I observed that the electric brine pump leaked into the secondary containment pit. I saw some surface damage west of the tank battery and well. There was about one foot of water in the pit during the inspection. Section III - AREAS OF CONCERN The pit had fluids in it. Section IV - FOLLOW UP EPA will conduct a follow up inspection in approximately 3 months. Section V - LIST OF APPENDICES N/A 2