Document byDXZYwGQOLo7obq0qqzvaQ7O
MM
inter office memo TENNECO CHEMICALS, INC.
TO From Subject
J. T. Sweeney
G. I. Rozand
VCM MONITORING DATA 10/30 - 11/5
AT Flemington AT Piscataway
date copy to
November 18, 1976
d . Bord W. R. FogeIsanger W. F. Gabel
The weekly data submitted for the above period dramatically highlights the kind of problems that have been apparent at Flemington for the last two weeks. Levels averaged 2.2 in the reactor room and 19 in the recovery room. Moreover, you had 73 excursions greater than 25 in the reactor building and 52 excursions greater than 25 in the recovery room. If our definition of a leak for EPA consideration is accepted at 25, your operation is generating far too many leaks! It is assumed that our leak detection program will be operational on January 19, 1977. Plan for increased maintenance in the recovery area and we will expedite installation of reactor opening CAR.
You will be plagued with having to deal with these leaks for EPA, much more so than you have been concerned as far as OSHA is involved. No longer can we ignore the levels above 25 ppm because no personnel are exposed! EPA demands your attention and remedy regardless of personnel exposure, as you know.
My understanding is that the VCM weekly data for the next
reporting period shows a reactor level at 1, which of course
is more in line with norm.
,, ~"s
/!
GIR:tm
Gordon . Rozand
009991
* QO-H 64 ( 1 1" 3)
TENNECO INTER-* FFICE MEMO
CHEMICALS,
INC.
To J, T. Sweeney
At Flemington
date December 27, 1976
From R. A. Lojewski
AT Flemington
Subject
VCM Exposure Data and TWA - Flemington Plant Area Monitoring System Period: December 11, 1976 to December 17, 1976
Copy to
W, D. Bord C. N, Brown* R F, Fanter W,, R, Fogelsanger W,, F,, Gabel D, M, Hershkowitz F, W, Kanzler W. Miringoff P. M. Reed S. Robbins Mo K, Rosen G I. Rozand F. Toca Re J. Young
TWA Only*
Attached are Plant summaries (Tables I-III). Table IV lists all excursions at or above 100 ppm including the number of incidents. Table V shows the TWA by job classification calculated from the data in Tables I-III. Graph #1 shows the percentage of readings above 1 and 5 ppm VCM for the Reactor Building while Graph #2 shows the weekly averages for the Reactor Building and the Pilot Plant. This report period there will not be an analysis of the Plant data by W. D. Bord due to him being on vacation.
The Plant was in operation seven days for this report period running at about 81% utilization. The four G.C.'s were on computer control.
Area
Reactor Building Recovery Comp. Room Pilot Plant General Area Parshall Flume
Total
10,991 1,374 4,662 6,871 666
>1 N%
4121 1357
739 205
66
37 99 16
3 10
>5 N%
>25
N1
>100 N%
847 8 106
1198 87 123
16 0.3
1
17 0.2
1
3 0.5
0
1 9 0.02 0.01 0
4 7 0 1 0
0.04 0.5 0 0.01 0
All readings greater than or equal to 100 ppm VCM are tabulated in Table IV. Twelve readings at or above 100 ppm occurred this report period reflecting seven separate incidents. Three incidents occurred in the Reactor Building affecting the center aisle 1st floor, VCM day tank area and the stairwell in hallway 2nd floor. Four incidents occurred in the Recovery Compressor Room affecting #1 and #2 recovery system. One incident occurred in the General Area affecting the VCM transfer pumps in the tank farm. No incidents occurred in the Pilot Plant during this report period.
RALrms
/f7 A.
R. A. Xojewski^
000936