Document byBJyqojVpGV0L07R893zewG1
Conoco Interoffice Communication
To Sid Pitts, Louis Legendre From T. G. Grumbles Date October 15, 1981 Subject INDUSTRIAL HYGIENE AUDIT OF ABERDEEN PLAilT This letter is to confirm your participation in the subject audit begining on Tuesday, November 10 through Thrusday, November 12. You should plan to arrive Monday night in Aberdeen and we should finish the audit by noon on Thursday. For your information the audit criteria is enclosed. Please advise as to your travel plans so transportation (i.e. rental cars) can be coordinated if necessary.
Thomas G. Grumbles ajo Enclosure
v
\
DTH 000014536
CONOCO CHEMICALS: INDUSTRIAL HYGIENE AUDIT SYSTEM
>asiu Goals: 'rocedure:
Audit Team:
1. To assure that all feasible steps are being taken to adequately protect the health of Conoco Chemicals employees.
2. To assure compliance with federal and local regulations. 3. Assess adherence to company policies and good proactlce. 4. Identify areas of need based on the above and make recommenda
tions to aid in meeting those needs.
Each plant will be audited at least every two years with actual
frequency determined by need. The audit will be conducted in three
phases as outlined below.
.
1. Pre-Audit - prior to the audit the plant will be contacted to
arrange a time of visit agreeable to all. The time spent in
the plant will vary dependent on size of the plant and extent
of the existing program.
The plant to be audited will be notified of the audit criteria to enable preparation of necessary materials for review and assure the availability of key personnel to be Interviewed.
2. Site Visit - the on site audit will consist of two basic parts. a. The majority of the audit will be performed "in-office". An opening conference will be held with management and ocher affected staff personnel to describe the purpose and process of the audit. The major activity will involve review of written programs, air sampling data, recordkeeping, and overall administration of the program. The specific aspects of this review are attached as Appendix I.
b. The second phase of the audit will Involve a walk-through inspection of the plant. This walkthrough will be done in OSHA style to identify obvious areas of non-compliance as well as allow for an assessment of administration and success of written programs.
c. A closing conference will be held with appropriate plant management before the audit team leaves the plant. Audit findings, preliminary recommendations, and report format and distribution will be discussed.
3. Post-Audit - A written report of the audit findings will be addressed to the plant manager; with a copy to the Vice President of Operations, General Manager of Manufacturing, and Medical Director.
The audit will be conducted by the Director of Industrial Hygiene, a Corporate Medical Department Hygienist, and a Person involved in hygiene activities from another Conoco Chemicals Plant.
DTH 000014539