MONSANTO - ANNISTON . ;pr.d work plan
January 11, 1971 Aroclor Pollution Study 916.07 Pollution Abatement
.
J. T. Bell .
. J. L. Broun ..
J. L. Corder
-1 J. Ethcredge
' ' V. R. Haupt . ;
'
G. L. Jessee
.
J. C. Landwehr
. _ W. F. Taffeo
' E. Ci Wright
P. 6. DeGarmo - G.O.
' P. B. Hodges - G.O.
W. B. Papageorge - G.O
W. R. Richard - G.O.
' J. R. Savage - G.O'.
Estimated Per Diem PR&D Cost Experimental Expense ' PR&D Cost to-date (1970) Estimated PR&D Cost 1971
$100 $11,000 $16,083 $10,000
'
`
The filtration and column adsorption phases of the work
plan issued 9/9/70 have been completed. A report on the
filtration study will be issued by 1/15/71. The data
generated in the .column study Is being compiled for a
cost estimate.
.
The following conclusions were drawn from the filtration
study; .
.
a. Aroclor levels of the plant effluent were reduced to 10 ppb by filtration of the neutralization pit solids on which Aroclor was adsorbad and by adsorption on the filtering media.
b. The removal of 200-1000 ppm of solids in the plant
effluent is a primary concern in any final clean up
system. >
' ''
The line of research proposed in this work plan is based primarily on these conclusions. In the flocculation Jar test run on the plant effluent, 15 ppm of SPV bentonite Clay^and 1.5 ppm. of Betz's 1170 poiyelectrolyte gave the
best settling floe.
Experimental: I. Define the following parameters In s flocculation study on the plant effluent.
v
s. Flow rate b. Height of sludge blanket e. Bentonite clay feed
MQNS 098556
' ' :I
(1) Product of American Colloid Company
PRM> Work Plan . Aroclor.Pollution Study
Page 2
A :' \
SAFETY:
Object: ,
,. :
.
To determine the operational parameters at vhich the solid end Aroclor concentrations are reduced to a minimum (i.e. 0-20 ppm solids & 10 ppb Aroclors). Since the bentonite cloy is only a weighting agent for the floe, its concentration will be increased to some practical limit if necessary, in order to provide more surface area for adsorption.
Estimated Beginning Date: Mandays 1 Target Completion Date:
2/1/71 AO A/1/71
Experimental IX. .. .
.
Demonstrate Aroclor removal' in a semi-continuous adsorption study. Define optimum.conditions:
. ' ' 'a. Retention time ' . b. Adsorbent loading capacity c. Recycle
.
Object:
To utilize some less expensive adsorbents than carbon end provide ah alternate design. The same reactor clarifier (Part I) will be used in this study. Provision will be made to recycle the settled adsorbent to premix area.
Mandays Target Completion Date:
AO 5/28/71
' ` ` '
.
The HC1 and H3PO4 in the plant effluent are normally
neutralized in the limestone pit. Occasionally, there
is some residual acidity which should be guarded against.
Any area exposed to the waste water should be washed thoroughly
with copious amounts of water. This will also remove any
Aroclor present.
The flocculating agents (3etz polymer 1170 and American Colloid's SPV bentonite clay) are neither flammable, corrosive, or toxic. **Hence, their handling requires no particular precautionary measures.
An operation manual containing all safety procedures will be issued to personnel operating the clarification unit.