UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
<l^'t
)
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 1
APRIL 24, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
.-i-/
The purpose of this Addendum is to incorporate the insulation of the steam trace lines, the instrument impulse lines and instrument housings which are subject to freezing.
The following additions, together with a-Supplementary Proposal Form, shall be made and become a part of the complete Specification.
3. WORK BY CONTRACTOR
Add the following paragraphs:
3.19
Furnish and install insulation material for sample connections consistent with that part of the attached Insulation Specification INS-3, dated April 28, 1966, for personnel protection. The sample connections to be insulated are listed on the attached tabulation entitled "Keystone Local Sampling Connections".
3.20
Furnish and Install insulation on the steam tracing of instrument impulse lines, instrument housings and steam supply piping in accordance with Specification INS-3 "Insulation for Piping and Equipment - Keystone Project". The work would include the insulation of instruments per Typical Drawing No. W-25991 and enumerated and located on the following drawings:
Drawing No.
Date
Descrintion
*-- _ l ; If tcnvEi1
2t S57 r'r;.vc-- ,7."
Ol rjigp"
W- 25583 W-2598*. W-25985 W-25986 ' W-25987 W-25988 W-25989 W-25990
W-25991 W-25992
W-25993 W-25994 W-25995 W-25996
3-22-67 1-18-67 3-31-67 3-30-67 3-23-67 4-7-67 2-2-67 3-28-67 1-30-67 1-27-67 4-4-67 2-22-67 3-23-6J 2-27-67
Tar Storage Area Plan and Section Final Coolers, El. 823r-0" Final Coolers, El. 762;-0" and 808=-0" Plan Absorber Piping El. Heat Exchanger El. below 777,-0" Plan Heat Exchanger El- above 777:-0!l Plan Demister Oil System Plan and Sections Drip Pot Draina Plan and Sections Tracing Details and Plash Tank Final Coolers and Absorbers Sections Phosam Facilities. Plan and Sections Water Cooling Tower Plan and Sections F.C. Sump Area Plan and Section V Boiler F.W. Storage Tank Plan and Sections -
El. 814;-0"
ADDENDUM 3S m
SPECIFICATION NO. 535-4
PLAINTIFF'S
EXHIBIT USX-93
1
I
24, 1967PAGE
USEI000285 tvr. .rc'Ctr.i'rlsn'fiS:*' l
3. WORK BY CONTRACTOR (Continued)
I
Add the following paragraphs? (Continued)
3.20 (Continued)
Drawine No
Date
Descrip cion
W-25997 W-25998 W-25999 W-25600 W-25601
4-8-67 4-5-67 1-8-67 3-4-67 3-4-67
Steam Tracers - Phosam Facilities V Condensate Headers Plan and Sections Steam Condensate, Plan and Details Steam Condensate Plan below El. 777'-0" - Area V Steam Condensate Plan above El. 777'-0'! - Area V
3.21
Contractor shall insulate the 30-gallon per minute Censtantemp hot water heater system. Model B-321, manufactured by the Leslie Company of Lynhurst, New Jersey, located in No. 1 Control Room, in accordance with Insulation Specification INS-111. Insulate areas as indicated on Drawing No. W-21037, Revision 0, dated March 8, 1967, entitled 'Piping - Schematic Control Room No. 1 Hot Water Tracer - Keystone Project - Area 6 - Clairton Works''. Attached Sketches No. 4072, Pages 1 and 2, entitled "Piping - Schematic and Hot Water Heater Location. Control Room No. 1, Area VI" will -furnish addi-rional information. `This will include supply lines,-location of heater and discharge line.
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 1
APRIL 24, 1967
PAGE 2 of 2
USEI000286
o
13
01
a. oi >
Q
* > >
o
U>
;
o
t
J
a 01
o CO
1
5
0^0 ,o i 8 ^ TO
-- *
as
"
a. 01 H
# cr>
H 01 41 A
Cl i-- < C 0)
Cl
CO Cl *7
cn rH f c >
Mr* MC g w Sr> w ^2 o o
B C O a
a o
i 8 8 re
m B B O u
0 0
5s
O 2J o s
t C4
Z
Z1
1 CM
z z
* 8> B9 O rH O8
Ea
Ou
c O <8 o --' 8 8 4J 8 H U -H 9 8 *9
bi 0O E OHO
O JC o H u *4 4J 8 4-r uH u 8 *9 8 *J u* O O unw
r B> C8 OH y8
e
u
XUt
Q) H
*b O
0Sr
bn
01 01 01 01 0W01
<8 *2 3
TOVO
ot)
C/3
i
>
)
rH 8
>
CO
XuZ Cl
(0 CO h<
*9 c
8 4*. 03 04 *4
im
O cm 8 4 4H >
Ot
01 rH
c - B 01
BO <NNO
C O
0
<J fM u JH
ao
>
o 0 VM o 4-1
M8
UH ^4
oi cl:
oi 0) 09
H 01 b 01 CO
H0 O>HTO Q> t'i
9 8 9 JO O O CD 03 T
CO #
js ^.e
ar u
Cl
o
09
**' a*
fM H l *9
--4 *9
O
ON O 1 o
4J rs U
4J
n* BN * *
B B r^ s
B>B
6
0oHwey
>
O u
0
01
01 H
a
o t o 01 o
WH
bn --i P UH
O
^4 8 --H 8 rH 9 --4 3 rH 9 8 o. 8 fib vu
0 u u
w eo UH N4
Cl Cl O
01 CO
o 01 OB CO
O.So
0 iJ
8 4J
H u\ 1 "O 1 o -
CD m ^4 -H
*4 cn 9 9
.-S --
o 4J
*9 01
o
i
01 00 H u
m 8 HH
m c. .-4
B * HH 0 o B fH H
1
t
O sO U U
H
r* y im 01 0
Q.^4 o
0 * 09 *9 i O
o
>O>
Xz
01 u 01 H N*4 rH
V0
<0
| rH
B
NO p-
X
E O
4y8
c8i
Q) L
Cl
L HO u
0.5. u D
> ^ ^H JC `WD
8 rH rH U 8 CO
CO
M 9'^a 60 8 m
9 8 rH 0 b 8
o 8 4J
O 8 HI
JS
z JZ
u ^4
O
U444
}H *H|
Q. U N*4
o. VU4
CL H|
O
H H rH
u
Cl as
Cl 01
o U3
Cl 01
01 4J
r--84
888 u 8 4J
88 Cy
8 8
8 H
8
H CO H CO |Q u. "9 o ^4
c 1 98
8 8 8 8 8 C 8 Q.
rH 9
O .H 89
O rH 89
o 8
-3H
8
Q o 8) > 05 U 8 U 8 V 8 >
44 5
o
4J
zo
C **
O
B M
-8 8 C. "H
8C CL rH
8C CL r-.
O J3
1 B8 r*4 O sO U r*
1
8
8 1
8 O
CM VO
CM
s
o
y r-
l
*
u f M 1 h> r 8
oo o O z
CM U4 CM U4 CM U-t CM *
9 *9 9 -
a
o u
U
o 0
0 o b
u o
zo
rH
o
z0
8 H
O Z
8 H
zO
8 -H
zO
H
U4 U4 *
U-t
rH
U-i
rH UH
jC U
Jo5 r.
u oH JoS uH JuS tu4 -u8 ruB t
hQOc ^oQinl.Uoiqoi.UoiQa.joLi4I HCD Oi
> J*
rH O rH O CO
CM CO
co
CO
CO
CM
9 J3 9 Xi
o 00 8 8 8
O CO
8 8 8 8 8 bl r- 8 8 8
8 TO 8 4J r*^
6
8 *H
<8-H
e M
a *H
C M
8 CO
8 CO
8 *H
8 M
tt* cc
88 88 CO CO CO V3
fM \D
Ki z Oo rH -
8 O
C |t
o
85 n
8 ?9
#<* t-
u- J4 n 21 tn c
f. -9 *9 *9
0 8
, T'
*
0 4H
o *
O 1
o j
(M Mz
yZ rH z So o (.3 H
X Ui
B -(
CuO
NCOM
cm
9
4 f-> H
H2 -c 5
co
iu F^
*fM.
[to
rH
ra
zz
o M . &
H 8: U
Hi 9
o
*H t ^
tL ! *4 Cu 6b Mb
H [ 9
o f a t*
ti i s' nQ n* m
|hfib
to
f*
f .M
in CM
H Cl
sP c 8 3 o o 23
*9 9
;2 O O, O
7 .
r*l rH
.
CM *
rsi
fM--, CM
CM `M
^H rH rH rH
Pb 6b tZ U4 Cb
* <
.1
a
o o cn o O *n fM CM
I'M r* --4 rH HT
CM CM
fSt M
'* *.
-
rH H r-|
6b Ut Ct(
O fM
o
rr :<*>
,(N 00
Cl
Cl C-l
c"3 ON
M CO
3
c 0
03 *4 O
X
01 Qfi
080
Mb Cj
60 m m oo
8 ON Bn CN
H Q Cv 0> O'
Z rH H --H
8 u
CM CM rM j
XX
--, W"N .. ON
-- vn
v0 vC O On vQ n8
T X
X <f
fM CM CM PM fM fM
*i. * 1
XX
3
V x X O X o X Bn r. <
fM cor-. cq *m <
rr H CTv Cv rH --H 00 -H CO rH -n
X jr --4
ao X CM
6
X to
;
>
Z5
rH CM
X
-C O
*x
i
JZ
0X0 I
* X00 to O!
* X00 jCCO CiJ
. mCO
HC *
HC
z cm
*l
CCll
cricCil
rC**l
O
cn
<r
X Oci
cO
GCl
.H
CM
c\
CM
8rHl m
>nrH*
CM in
vO m<n
co
lfS^Sc^S^,2?3=!liSS
KEYSTONE LOCAL SAMPLiNO CONNF.C H ONS (C o n t:n u c r| SPECIFICATION ATTACHMENT 5 3 5 ^ 1 0 2 * 6 2 ADD., 5
INSULATION INFORMATION USEI000288
_
2
w0
e
-o4-
,c s
o w<0
ai3 4 u
M X a
6O T*
.O- k
0
44 Ij
CM MS
O pi CM kO
o
0u o
404 o
a* u
f*
6o u >4
iU*> ft 3
0
-aH
wO C. p4
6
r* M i,;-a. 4
--4
g o*
44
a) C 3
*0)* <3
a) c* c:
Uu' TC
Oo
0
M 0)
3
0
C
0M 0)
3 0 e
0--< a -
Vci
0) >
aO
-O
pH
a>
3T
1*3 t*
o
'ft
u T
0>
a.
; CO CJ CO fot
* u
01
03
Of > o <d
-
CO o f CQ o
u V
03
o uo Auu - Aocn *
V44 CM <M CM
"
o
<om
*o
<an
*3 -V
2o
Q
-0I)
zO
*n o*
--
ch
Sm 6 m
o-J o -3
.C - JS
OoUW
0) cn
a> u)
Qa(Di v e/3
vfc 402
0W^>3 j4ev4 o?
4\fi V4)
a <o0:
ft n b3` .*3 a|/! U?
<73 c/3 cn
St
C' %\
I V. CU'
h| V5
a; 6:
MS O O
..i -- o o
CM CM
Cm
> *A) aOsf >I
fto c 3*M Zf>I
r** 0) f. S3 fN 03 k^O
C-5O C-TO H f^lQ H ^--
00 - 00 * CO - eg
u Au o.ACO u' Ato 2l
<c
soos O'
CM
i
Si
CM >o H
i c
.y o
^4
o> C\ %r\ t/S
03| cn m -3 n en
60 e 30
e o
(p
60
o
rt
Vft
a> S c
A UBUKN ENGirWt.tS.KING. INC-.'.
-~'3 ' '*"3" -imtuftnYra
' ''a t-
y 16. ___ pate^/c/g~i
CHKC BY ____ DATE____________
SUBJEu-Or J lcCA~V U->- M.V<. ^SHEET NO___ J____ OF *
Jrt 1 g. jj JVJCOK\lK)& UM&S.CrNr. gfj* l JO* NO------------------ ---- .
USEI000289
/> 'JSUFiN ENGINEERING. I
C* -*'* f
** `f ^ *ft*/?*, Pr ,
: ? _ _..rA-T;2 . r r_____date_________
t f-
D !; 0 -
su*j13~ Su
i-.; f. y i>
r.^T? ,* iuec^'v5.*-Vh`it-v^'0T*
rr * *
t-i
x *-.
V- -
sI *
?
" F
So ' X
r:y
Ja'
-*os
C.
nc
Tr :-
:
N.
vs 1
. . O
4
f ": s '!.,. vi-- ii
.^t ;
*
i-
J
.--
-T
-\.
,
:Uv
1
1 Pl^VHO 'SQvAK*fnC. . :s
> i rtrr
-hwwl iocwtio*
- i cmtou
j*\ - fi**&*< r
'3. *i ^i'fSTOH.c
cLAvtTOM wd<*s t...
r.
DRAWN
Orntid States Steal CorpurstioR Design EngiMerfog-Pitts&srgh, Pa.
OATK cmccxcb DATS
SCALS
$. f'
rl.::;
?=; ' >. $K~
V
.*
AMMONIA FRACTIONATOR T-~35QAT-353
USEI000291 v' -
V
REF. DWG. C648? AMERICAN! BR1DG
AMMONIA STRIPPE* COLUMN T-.JOS3 T*3uV INSTALLATION OF SAMPLE CONNECTIONS
AMMONIA STRIPPER COLUMN T-306*T-307' KEYSTONE PROJECT CLAIRTON WORKS
DWG. REFERENCE AMERICAN 3R.CCC
USEI000292
<s
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 1
APRIL 24, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined the Specification and Addendum No. 1 and being familial with the various conditions affecting the work, the Undersigned offers to perform the work specified in the above-numbered Specification for the prices quoted below:
1. Unit prices for insulation of the following work:
Item No.
1.1 -
Descrintlon
3/8-inch impulse lines
Estimated Quantity
6,000 feet approx.
Unit Price
$ per foot
Estimated Total Cost
$
1.2 Transmitters, etc.
149
5per unit
$
Lump-sum price for the following work:
2.1 Furnish and install insulation for sample lines and connections described herein
$_
2.2 Furnish and install insulation for header and condensate system as described herein
$
Date
Firm Name Signed by Title
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-52-aDD. 1 USEI000293
APRIL 24r 1967 PAGE 1 of
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SPECIFICATION NO. 535-4102-62-ADD. 2
ADDENDUM
MAY 4, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
V/OJl
The purpose of chis Addendum is to add and delece items of piping to be insulated and to provide for the addition of two (2) ammonia distillation tanks to be insulated.
The following additions, deletions and changes, with Supplementary Propo.a-dJ'Tfbrfc^ahall
be attached to and become a part of the compiete Specification.
\
6. DRAWINGS ACCOMPANYING SPECIFICATION Add the following revised drawings:
..2S 1 " \
~ _ . IC^j
Drawina No. Revision No .
Date
Descriotiorf--^
W-20624
4
10-11-66
Light'Oil Regenerators -"-Riding j^-tfpper
Plan
W-20716
7
12-9-66
Light Oil Regenerators - Piping - Lower
Plan
W-20738
2
10-11-66
Separator Cold Box - External Piping -
Elevation
W-21089
5
7-20-66
Arrangement - Tar Lines
W-21360
3
11-14-66
Arrangement - 14-inch Treated Water Supply
W-21364
3
5-24-66
Arrangement - Boiler Feedwater - Tanks -
Pumps and Piping
W-21366 W-21383 W-21587 W-21632 W-21654
5
12-6-66
Boiler Feedwater - Suction
4
10-19-66
Boiler Feedwater - Piping
3
5-13-66
Final Coolers - Circulating Water
8
12-20-66
Boiler Blow-off and Cont. Blow-down
2 8-8-66 Arrangement - Exhaust Steam Piping to Deaerator
W-21655
4 8-8-66 Arrangement - Exhaust Steam Piping to Deaerator
J3DENDUUM
SPECIFICATION NO. 535-4102-62
MAY 4, 1967
PAGE 1
* "'
TTSF.IQQ0276 - .
6 DRAWINGS ACCOMPANYING SPECIFICATION (Continued)
t
Add the following revised drawings: (Continued)
Drawing No. Revision No.
Date
Description
W-21656
1 7-7-66 Arrangement - Exhaust Steam Piping to Deaerator
W-21720
2
10-12-66
Boiler Feedwater Piping
W-21736 (redrawn) 1
10-7-66
Boiler Feedwater - Claus Plant Supply
W-21758
2 5-6-66 Drip Pot Drains - Pressure and U.F. Gas Piping
W-21807
5
5-10-66
Miscellaneous Lines to Areas 4 and 5
W-21876
4
5-18-66
Gas Piping - 4-inch - Contactor Vapor
Return
W-21930
2
7-30-65
Generator Building - Exhaust Duct Floor
Opening
W-21934
7
10-17-66
Steam Generator Building - Steam Piping
W-21935
6
10-17-66
Steam Generator Building - Steam Piping
W-21936
6
10-17-66
Steam Generator Building - Steam Piping
W-21937
8
10-26-66
Steam Generator Building - Steam Piping
W-21994.
3
5-16-66
Phosam Facilities - Miscellaneous Piping
W-22116
7 1-5-67 Boiler Blow-down, Blow-off and Drain Piping
W-22119
5 6-1-66 Composite Piping at West Battery
W-22136
5
11-29-66
Process Air
W-22140 W-22151
10
12-9-66
Tail Gas Piping
6
12-6-66
Ammonia Refrigeration Piping
W-22153 W-22156 FP-30710
4 6-7-66 Condensate Piping
7
12-7-66
Ammonia Refrigeration Piping
B
9-19-66
Ammonia Stills - T-3QA-;amMc.305
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 2 USEI000277
*3'
i-q*. V*1 ... r' --> MAY 1967-''' 1. PA^E 2
v-* zP-'-'V.s'.'J* "" /^v
6. DRAWINGS ACCOMPANYING SPT^CT FT CATION* (Continued)
The following Date Sheets listed herein shell be attached to this Addendum:
Insul. Data Sheet
Revision
5 7 8 9 10 11 1?.
13 14 16 18 19 21
22 23 24
31 32 34 35 37 40 41 62
<r 66 85
3 2 and 3 * 2 and 3 2 and 3
3 3 2 and 3 2 and 3 2 and 3 2 and 3' . 2 and 3 2 and 3 2 and 3 2 and 3 2 and 3 3 3 3 1, 2 and 3
1, 2 and 3 1, 2 and 3 1, 2 and 3 1, 2 and 3
.2 and 3 2 and 3 <' 3
v.
ADDENDUM
SPECIFICATION NO
ss'v* 'Izrjjgs
535-4102-62-ADD. 2
- -.4=*
SSJsesSB*.-*;
MAT 4, 1967
USEI000278
PAGE 3 of 3
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 CULP BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 2
MAY 4, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined Che Specification and Addenda No. 1 and No. 2 and being familiar vlch Che various conditions affecting Che work, the Undersigned offers Co perform Che vork specified in Che above-numbered Specification for Che prices quoted belov:
1. Lump-sum price (includes Icems No. 1.1 and No. 1.2) for performing all vork described herein
$
Breakdown prices as follows:
1.1 Price for performing all vork described herein for cold insulation per INS-1
$
1.2 Price for performing all work described herein for hot insulation per INS-3
S
Dace
Firm Name Signed by Title
USEI000279
'JPPLEKENTAKY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 2
MAY 4, 1967 PAGE 1 of 1
/
/
P
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD.3
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
MAY 17, 1967
The purpose of this Addendum is to incorporate additional insulation required for Areas 7 and 8 in accordance with the attached drawings.
The following additions, together with a Supplementary Proposal Form shall be.attached to and become a part of the complete Specification.
3. WORK BY CONTRACTOR
Add the following:
3.21
Furnish and install insulation of the steam tracing of instrument impulse lines, transmitter% steam supply piping, steam headers and a steam reduction station for Areas 7 and 8, in accordance with insulation Specification INS-3 and the following drawings:
Dwg No.
Date
Ti tie'
W-26002 W-26003
W-26004
W-26005
4-14-67 4-10-67
4-15-67
4-20-67
Steam Tracing - Plan & Sections - Area VIII
Steam Tracing & Condensate Piping Plan & Sections -
Area VIII
Steam Tracing & Condensate Piping Plan & Sections
Area VIII
Steam Tracing - Plan above Elev. 788'
Plant -
Area VII
3.22 Furnish and install insulation of close-coupled pressure guages per-drawings listed above.
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM ,
SPECIFICATION NO. 535-4102-62-ADD.3
MAY 17, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined the Specification and Addenda Nos. 1, 2 and 3 and being familiar with the various conditions affecting the work, the Undersigned offers to perform the work specified in the above numbered Specification for the prices quoted below:
1. Unit prices for insulation of the following work:
Item No.
Descriotion
Est. Ouantitv
Unit Price
Est. . Total Cost
1.1 3/8-inch impulse 1,500 feet Lines
5
ner feet
$
1.2 Transmitters
50
(instrument Housings)
$
per unit
$
1.3 Stain. Steel . .'Jacketing
1,800 feet
$
per foot
$
1.4 1.5'
Steam Headers Pressure' gauges
335 feet 7` ' '
$ $ '
per foot per unit
2. Lump-sum price for furnishing and installing steam insulation for reducing station.
$ $
$.
Date
Firm Name
............... V/6 z - c
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 4
JUNE 27, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
ITEM NO. 17-13
The purpose of this Addendum is to incorporate revised drawings which consist of miscell aneous piping additions and deletions to the present contract.
The following additions, deletions and changes, with Supplementary Proposal Form, shall be attached to and become a part of the Complete Specification.
6. DRAWINGS ACCOMPANYING SPECIFICATION
Add the following revised drawings:
Note:
All drawings covered by this Addendum have previously been issued tc the Contractor by Transmittal Letters No. 2 dated January 17, 1967 and No. 8 dated January 26, 1967.
Drawing No.
Revision No.
Date
Description
W-20536 *
W-20576 *
W-20577 * W-20578 * W-20579 * W-20580 *
W-20581 * W-20582 * W-20583 * W-20585 * W-20586 *
W-20587 * W-20601 * W-20602 * W-20603 * W-20604 * W-20605 * W-20606 * W-20607 W-20608 *
3 9-24-65 Main and L.0. Regenerator Valve Support
Brackets
3
6-17-66
Std. Pipe Support Details and General
Notes
1
3-4-66
Std. Pipe Support Details Screwed Piping
2
4-22-66
Std. Pipe Support Details Typ. Field Const,
3
6-17-66
Std. Pipe Support
ddle and Archer
4
4-29-66
Main and L.0. Re,
Suooort
Details
1
3-4-66
Main Regenera
1
3-18-66
Main Regenera
3
6-17-66
Main Regenera
Suppora\
StSjs^ort?!
2
4-29-66
Compressor Bi
2
5-20-66
Compressor Bui
g - l/C$# Regenerator
Pipe Support'
2
6-10-66
Light Oil Regener!
S' -^Supports
4
7-29-66
Main Regenerators Piping Upper Plan
4
7-29-66
Main Regenerators - Piping - Lower Plan
3
5-20-66
Main Regenerators - Piping - Elev. "aB-aE'-
2
4-15-66
Main Regenerators - Piping - Elev. "AA-AA"
5
9-8-66
Main Regenerators - Piping - Elev. "ac-ac*1
3
4-15-66
Main Regenerators - Piping - Elev. "aD~AD`
4
7-29-66
Main Regenerators - Piping - Upper Plan
5
7-29-66
Main Regenerators - Piping - Lower Plan
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 4
JUNE 27, 1967
PAGE 1
USEI000266
6. DRAWINGS ACCOMPANYING SPECIFICATION (Continued;
Drawing No.
Revision Ns..
Date
Description
W-20609 * W-20610 W-20611 * W-20612 * W-20613 * W-20614 * W-20615 * W-20616 * W-20617 * W-20618 * W-20619 * W-20620 * W-20621 * W-20622 *
W-20623 * W-20624 * W-20629 * W-20630 * W-20631 * W-20632 * W-20633 * W-20634 *
'
W-20635 * W-20640 *
W-20641 W-20642
W-20643 * W-20644
W-20655 * W-20656 * W-20657 * W-20658 * W-20659 * W-20660 * W-20661 * W-20662 * W-20663 *
W-20664 *
W-20665 *
W-20670 * W-20671 *
4 4 5 2 4 4 4 3 3 2 2 3 2 2 4 4 8 6 6 5 5 6
6 4
6 5
5 4
4 4 5 2 2 2 6 1 3
6
4
6 4
7-29-66 7-29-66 7-29-66 4-15-66 7-29-66 7-29-66 7-29-66 9-8-66 7-29-66 10-11-66 10-11-66 12-22-66 10-11-66 12-20-66 7-29-66 10-11-66 11-25-66 5-6-66 9-8-66 7-7-66 7-7-66 1-3-66
10-11-66 1-4-67
12-30-66 12-30-66
10-5-66 10-5-66
11-25-66 8-5-66 8-5-66 8-5-66 3-11-66 3-11-66 11-25-66 3-11-66 9-8-66
7-29-66
4-1-66
Main Regenerators - Piping - Elev. "BB-BB" Main Regenerators - Piping - Elev. "Ba-BA`' Main Regenerators - Piping - Elev. "BC-BC'' Mam Regenerators - Piping - Elev. "ED-3D``
Mam Regenerators - Piping - Upper Plan Mam Regenerators - Piping - Lower Plan Main Regenerators - Piping - Elev. "C3-CB" Main Regenerators - Piping - Elev. "CA-CA" Main Regenerators - Piping - Elev. "CC-CC" Main Regenerators - Piping - Upper Plan Mam Regenerators - Piping - Lower Flar. Main Regenerators - Piping - Elev. "DS-DB'" Main Regenerators - Piping - Elev. "Da-DA1' Main Regenerators - Piping - Elev. "DC-DC"
Expansion Turbine - Piping - Pian and Elev. Light Oil Regenerators - Piping - Upper Pla Compressor Building - Piping - Upper Plan Compressor Building - Piping - Elev. "FA-FA Compressor Building - Piping -, Elev. "FC-FC Compressor Building - Piping - Upper Plan Compressor Building - Piping - Elev. "GA-GA Compressor Building - Piping - Elev. "GC-GC
and HJ-HJ" Compressor Building - Piping - Upper Plan Compressor Building - Piping - Elev. "HC-HC
and JC-JC" Light Oil Recovery - Piping - Lower Plan Light Oil Recovery - Piping - intermediate
Plan Light Oil Recovery - Piping - Upper Plan Light Oil Recovery - Piping - Partial Plan
and Sections Compressor Building - Piping - Lower Pian Compressor Building - Piping - Lower Plan Compressor Building - Piping - Lower rlan Compressor Building - Piping - Lower Plan Compressor Buiiamg - Piping - Elev. "FD-FD' Compressor Building - Piping - Elev.. "GD-GDCompressor Building - Piping - Elev. "RD-HD: Compressor Building - Fiping - Elev. 'JD-JD' Compressor Building - Piping - 1stme;trie
View Compressor Building - Piping - Elev. "FB-F3
and GB-GB'* Compressor Build!ng - Piping * Elev. "H5-K3
1-10-67 7-29-66
ADDENDUM
SPECIFICATION NO 535-4102-62-ADD
.T-r?v
6. DRAWINGS ACCOMPANYING SPECIFICATION (Continuea)
Drawing No.
Revision No.
Date
Destriocion
W-20672
5 11-29-66 Expansion Turbins - Piping - Elevations ar.
W-20673 W-20674 * W-20675 * W-20676 It W-20677 W-20678 W-20679 W-20680 * V-20681 * W-20684 W-20685 * W-20689 A W-20690 *
W-20691 * K-20692 A W-20693 A W-20694 * W-2C695 A
W-20696 * W-20697 A K-206S8 * W-2070i * W-20702 it W-20703 W-20704 A
W-20705 * V-20706 * U-20707 n V-20708 k W-20710 k W- 20711 n K-20712 * W-20713 A W-20714 * W-20715 It W-20716 W-20717 4 W-20718 A W-20719 It W-27020 * W-20721 *
W-20722 It W-20723 A
4 5 3 5 4 7 6 7 1 6 4 6 9
7 8 8 6 6
mCt
7 4 7
6
8 *8
9 8 8 5 8 7 3 2 3 5 7 '7 5 5 5 6
3
X
12-30-66 10-5-65 6-3-66 1-10-67 10-5-66 1-10-67 11-11-66 11-29-66 4-22-66 1-10-67 9-8-66 4.2-8~6 6 12-12-66
11-25-66 12-21-66 12-20-66 ii-9-66 11-11-66
8-5-66 12-12-66 8-5-66 12-19-66 12-19-66 21-10-66 12-19-66 12-9-66 il-i0-66 12-9-66 8-25-66 21-10-66 12-9-66 7-29-66 4-13-66 9-8-66 7-7-66 12-9-66 . 1-3-67 8-5-66 8-5-66 8-5-66 10-25-66
10-11-66 4-13-66
Light Oil Recovery - Piping - Elev. "KE-KE Light Oil Reicvery - Piping - Elev. "KF-Kr Light Oil Recovery - Piping - Elev. s,KA-Ra Light Oil Recovery - Piping - Elev. ''K3-K3 Lignr Oil Recovery - Piping - Elev. "KC-KC Light Oil Recovery - Piping - Elev. "KD-KD N2 storage and Blow-down - Piping - Plan Nj Storage and Blow-down - Piping - Elevat Nt2 Storage Piping - Elev. "LB-LB" N2 Denming Station Piping - Plan Detuning and Instant Air - Piping Eievacio: Hydrogen Cola Box - Piping - Plan Hydrogen Plant - Piping - Plan Above -
787:-10-7/8" Hydrogen Plant - Piping - Elevation "N3-N3 Hydrogen Plant - Piping - Elevation "NC-NC5 Hydrogen Plant - Piping - Elevation 'ND-SD' Hydrogen Plant - Piping - Elevation "PA-PA' Hydrogen Plant - Piping - Plan Above
774 -9-3/ 8' Hydrogen Plant - Piping - Plan at Grade Hydrogen Plant - Piping - Elevation "NA-SA" Hydrogen Plant - Piping - Elevation "NE-NE" N'2 Plant - Fiptng - Upper Plan N2 Plant - Piping - Plans N2 Plant - Piping - Lower Plan K2 Plant - Piping - Elev. "QB-OB" Nj Plant - Piping - Elev. "QA-Qa N2 riant - Piping - Elev. "QC-C'C" N2 Plant - Piping - Elev. "QD-QD" N2 Plant - Piping - Elev. "QE-QE h'2 Plant - Piping - Plan and Elevation N2 Plant - Piping - Elev. "RB-RB' Main Regenerators - Piping - Upper Plan Mam Regenerators - Piping - Lower Plan Main Regenerators - Piping - Elev. '-'Da-DA" Light Oil Regenerators - Piping - Upper Pla: Light Oil Regenerators - Piping - Lower Pla: Compressor Building - Piping - Upper Pier. Compressor Building - Piping - Elev. "Ha-Ha Compressor Building - Piping - Upper Plan Compressor Building - Piping - Elev. ``Ua-L'a Compressor Building - Piping - Elev. 'UB-L3
and HB-HB" Compressor Building --Plping'^Lovei Plan Compressor Building^ 'Piping -- Elev. "CD-CD
ADDENDUM
SPECIFICATION NO. 535-4202-62-ADD. -
JUNE 2? '1567
USEIQ00268
PAGE 1
DRAWINGS ACCOMPANYING SPECIFICATION <Cc.n tinuca/
Drawing No.
V-20724
W-20731 W-20732 W-20733 W-20734 W-20735 W-20736 W-20737 W- 20738 W-20739 A K-20750 It
W-20751 K
V-20732
W-20'38 *
W-20'35 *
W-2S&05
Vi-24606 It
W-24607 *
V~iii6Ci8 It
V-24609 It
~246iC It
Revision No.
Data
Destruction
7 12-20-66 Light Oil Regenerator - Piping - Interned:.;
P i in
12-9-66 Separator Cold Box - External Piping - Plar
A 12-9-66 Separator Cold Box - External Piping - Elev
3 s-25-66 Separator Cold Box - External Piping - Ei=\
3 12-23-66 Separator Cold Box - External Piping - Plar.
1
5-13-66
Separator Cold Box - External Piping - Ele'.
2 8-25-66 Separator Cold Box - External Piping - Elev
2 10-11-66 Separator Cold Box - External Piping - Plar.
2 10-11-66 Separator Cold Box - External Firing Els.
2 10-11-66 SeDaratcr Cold Box - External Piting - Els-.
4 10-7-66 Mist. Plans ana Details - Piping - Lie.-.
"3P-BF'-
3
9-8-66
Mist. Plans and Details - Peeing - Elev.
"CF-CF"
j 12-22-66 Mist. Plans and Details - Piping - Elev. "DF-DF"
8 12-9-66 Light Oil Regenerators - Piping - Elev.
-EB-E3" 6 12-9-66 Light Oil Regenerators - Piping - Elev.
Ert-EA"
9
1-3-67
Pyridine Plant - Piping - First Floor -
Plan
6
2-3-67
Fyndme Flant - Back Piping - Plan and
Sections
9
1-5-67
Pyridine Plant - Piping - Second Floor -
Pian
7-29-66
Pyridine riant - Piping - Sa_*.ione 'a-a
5 12-12-66 Pvridir.- Flint - Piping - "H~H . "L-L and
f c_C*
7 12-21-66 Pyridine Plant - Piping - 'j-j "K-K and
W-246il It V-2i622 *
6-10-66
Fyndme Plant - Piping - :-B-B'' and 'D*D'
3
1-9-.6V
Pyridine Plant - Piping - "C-C 'MM'1. '`EE-'
and "FF'
NOIE; All drawings marked * are no mange but ha.-e been included m this Addendum because they were part of Drawing Transmittals No. 1 ana Sc. a*
USEI000269
UNITED SIAIES 5IEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH. PENNSYLVANIA 15230
SUPPLEMENTARY rEOt-O;AL form
SPECIFICATION NO. 535-4102-62-ADD. 4
JUNE 27, 1967
INSULATION FOR FIFING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined the Specification and Addenda Nos. 1. 2,, 3 and 4 and being familiar with the various conditions affecting the work- the Undersigned oifers to perform the work specified in this Addendum No. 4 for the price quoted below;
1. Lump-sum price for performing-all work described per this Addendum No. 4
$
Date
^Ecrm Name Signed by
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO, ;j5-*i02-52.ADD. - " JUNE 27. 1967 c AGr. i c r i
USEI000270
'/-6
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 5
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
JULY 26, 1967 Icem 17-8-M
The purpose of this Addendum is to add the "installation :of stainless"stdel- boxes .around transmitter housings for freeze protection.
The following additions with Supplementary Proposal Form shall be attached to and form a part of the compLete Specification.
3. WORK BY CONTRACTOR
Add the following:
3.20 Delete the words "Instrument Housings". 3.22 Delete the word "Transmitters".
>
3.24 Install thirty (30) 316 stainless steel boxes over the required instrument housings with minimum'disturbance to the installed piping and tubing as possible. Subject boxes will be furnished by the Purchaser.
3.25 Provide all necessary slotting of boxes to accommodate irregular Impulse piping.
3.26
Note, before installation of protective boxes on the instrument housings. Contractor shall be sure the steam tracing tubing (without insulation) la around the perimeter of the box and near the open bottom.
: 4. WORK BY PURCHASER
.~
Add the following:
~
*
4.5 Designate which instruments are to have protective stainless steel boxes.
4.6 Furnish thirty (30) unassembled stainless steel boxes to be installed by Contractor on designated instrument housings.
6. DRAWINGS ACCOMPANYING SPECIFICATION
Add the following'new drawings:
USEI0002S9
Drawing No.
SK-4078 W-25991
Revision
0 2
Date
6-28-67 6-29-57
Description
Protective Boxes for Instruments Steam Tracing & Flash Tank Details
ADDENDUM. SPECIFICATION HO. 535-4102-62-ADD. 5
# JULY 26,_1967
PACE 1 of 1
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 5
JULY 26, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined the Specification and Addenda Nos. 1, 2, 3, 4 and 5 and being familiar with the various conditions affecting the work, the Undersigned offers to perform the work specified'.in this Addendum No. 5 for the price quoted below:
1. Unit price for installing estimated quantity of thirty (30) protective boxes on existing instrument housings
1.1 Unit price for installation of protective boxes in the event Purchaser elects to add to estimated quantity
$ ___________ $ /unit
Date
Firm Name Signed by Title
UPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 5
JULY 26, 1967 PAGE 1 of 1
/^-r
f- .
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULP BUILDING PITTSBURGH,-PENNSYLVANIA 15230
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 6
AUGUST 10, 1967
INSULATION POR PIPING AND EQUIPMENT KEYSTONE PROJECT
ITEM 17-15a-c
Th purpose of this Addendum is to add the insulation to the tops of four (4) light oil ragenerators and thermocouple wells and nozzles.
The following additions, with Supplementary Proposal Porn, shall be attached to and fora a part of the complete Specification.
3. WORK BY CONTRACTOR
3.27 The four (4) light oil regenerators, numbered R-582, R-584,.R-586 and R-590, shall be Insulated up from the stiffener rib shown at reference elevation 31*4-5/8", the balance of the straight sides and the top heads of the vessels.
3.27.1
Insulation shall consist of two (2) 1-inch thick layers of Styrofoam board applied over mechanical fasteners which have been cemented to the shell and heads of vessels. Cement must be suitable for operation temp erature of plus 50* F. One (1) layer against the vessels shall be laid dry; the second layer shall have the edges cemented to adjacent pieces. Vlmasco or approved equal vapor barrier material shall be applied over second layer of Styrofoam for sides and tops.
3.27.2
Stainless steel, type 316, .010-inch thick, jacketing shall be applied on straight vertical aides up to tangent line of head.on the top of'
tangent line, glass fabric shall be embedded in the vapor barrier mater ial. Over the glass fabric shall be applied Insulmastic 4010 or approved equal, weather-proof coating..
3.27.3
Appropriate closure and sealing shall be applied between head and side weather coating and jacket and between the above described 2-inch of insulation and the thicker insulation of the lower side. The closure necessary between the different thicknesses of insulation shall be per Detail B, Page 10 of INS-1.
3.28 Thermocouple Nozzles
Insulate Thermocouple nozzles that are located on the light oil regen? exator vessels (R-582, R-584, R-586 and R-590) with multiple thermo couples in each nozzle. The tabulation of nozzle identification of each vessel is as follows:
' RccovsO iwi a
A<SfsczszcA-IrI>m No. 535-4102-62-ADD. 6
AUGUST 30, 3967
PAGE
( USEI000255
A.
3. WORK BY CONTRACTOR (Continued)
3.28 Thermocouple Nozzles (Continued) Nozzle No. Nozzle Diameter No. of Thermocouples
Dimension Face of Vessel to Face of Nozzle
Vessels R-584, R-586 and R-590
TW-16 TV-17 TW-18
8 inches 8 inches 8 inches
2 4 4
F to F 7-3/16 inches F to F 7-3/16 inches F to F 7-3/16 inches
Vessel R-582
TW-16
TW-17 TW-18 TW-19 TW-20 TW-21 TW-22 TW-23 TW-24a TW-24b TW-25 TV-2 6 TW-27 TW-28 TW-29 TW-30 TW-31
8 inches 8 inches 8 inches 2 inches 2 inches 2 inches 2 inches 2 inches 8 inches 8 inches 2 inches 2 inches 2 inches 2 inches 2 inches 2 inches 2 inches
2 4
1 1 1 1 1 1 3
3 1 1 1 1 1 1 1
F to F 7-3/16 inches
F to F 7-3/16 inches
F to F 7-3/16 inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
F to F 7-3/16 inches
F to F 7
inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
F to F 6
inches
3.29 Insulation of these nozzles and extension space outside the face of nozzle shall be as follows:
3.29.1
Two (2) layers of Styrofoam pipe covering, each layer 1-inch thick shall be fitted over nozzle. These sections shall be fitted and cemented into the vessel side wall insulation and the layers shall be staggered with the aide wall insulation. The outside end of this 2-layered tube shall be closed by two (2) 1-inch thick Styrofoam plugs cut in circular section and cemented into the tube.
1 The entire exposed surface shall have vapor barrier, glass fabric embedded in the vapor barrier and weather-proof coating as described for light oil regenerator tops.
3.30 The dimension from face of nozzle on vessel to outside of 2-inch thick end shall be six (6) inches.
3.31 The inside of the cavity produced by pipe covering section installed over nozzle shall be packed with slag wool after thermocouple wires are installed.
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 6
AUGUST 10, 1967
USEI000256
PAGE 2
4. WORK BY PURCHASER
4,7 <thr"d-d - - **' > *<=>* lons
SLl2? " " `e in*uUed bef0 Contractor installs pipe covering over
//
i\
addendum
SPECIFICATION NO. 535-4102-62-ADD. 6
AUGUST 10, 1967
PAGE 3 of 3
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 6
AUGUST 10, 1967
INSULATION FOR PIPING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined ehe Specification and Addenda Nos. 1 through 6 and being famil iar with the various conditions affecting the work, the Undersigned offers to perform the work specified in this Addendum No. 6 for the price quoted below:
Lump-sum price for performing all work described per this Addendum No. 6
S
Date
Firm Name Signed by Title
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 6
AUGUST 10, 1967 PAGE 1 of 1
//>, A
UNITED~SATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
?-//
/
Y/~ 2 -
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 7
NOVEMBER 13, 1967
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
Item 17-15-d
The purpose of this Addendum is to Increase the scope of work to Include work In Areas 7 and 8 not previously included.
The following additions and deletions, together with Supplementary Proposal Form, shall be attached to and fora a part of the complete Specification.
The following insulation data sheets have been revised:
Sheet No.
Revision No.
Revision Date
Work Area
Hot or Cold
33 20 10-31-67
39 20 10-31-67
40 20 10-31-67
41 20 10-31-67
53 20 10-31-67
54 20 10-31-67
56 20 10-31-67
57 20 10-31-67 63 20 10-31-67 64 20 10-31-67 66 20 10-31-67 72 20 10-31-67 76 20 10-31-67 80 20 10-31-67 81 20 10-31-67 82 20 10-31-67 87 20 10-31-67 99 20 10-31-67 102 20 10-31-67
7 7 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 7 8
Hot Hot Cold Hot Hot Hot Hot Hot Hot Hot Hot Cold Hot Hot Hot Hot Hot Hot Hoc
6. DRAWINGS ACCOMPANYING SPECIFICATION
The following drawings have been revised:
Drawing No,
Revision No.
Date
W-20703 W-20705 W-20694
14 10-31-67 14 10-31-67
6 11-9-66
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 7
NOVEMBER 13,
- .. --
USEI000252
)
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 7
NOVEMBER 13, 1967
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
Item 17-15-d
Having carefully examined Che Specification and Addenda Nos. 1 through 7 and being familiar with the various conditions affecting the work, the Undersigned offers to perform the work specified In the above-numbered Specification for the prices quoted below:
1. Lump-sum price for performing all work described herein
Breakdown prices for above
1.1 Price for performing all work described herein for cold insulation per INS-1
$
1.2 Price-for performing all work described herein for hot insulation per INS-3
$
Date
Firm Name Signed by Title
V
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 7
NOVEMBER 13, 1967 PAGE 1 of 1
USEI000253
I
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA. 15230
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 8
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
FEBRUARY 19, 1963 Item 17-15-d
The purpose of chic Addendum is Co increase Che scope of work co include work in Areas 7 and 8 previously included in.drawing transmittal No. 38 daced November 26, 1967.
NOTE: This Addendum cancels and supersedes Addendum No. 7.
The following additions and deletions, together with Supplementary Proposal Form, shall 'be attached to and form a part of the complete Specification.
The following insulation data sheets have been revised:
aeet No.
55 39 40 41 63 64 66 72 76 80 81 82 87 99 102
Revision No.
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Revision Date
10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 10-31-67 .
6. DRAWINGS ACCOMPANYING SPECIFICATION
Work Area
7 7 7 7 7 7 7 8 8 8 8 8 8
7 8
Hot or Cold
Hot Hot Cold Hoc Hot Hot Hoc Cold Hoc Hot Hot Hot Hot Hoc Hoc
The following drawings have been revised:
Drawing No.
SK-40S4 V-22132 W-22133 VI-22144 VI-22177
Revision No.
2 7 7 6 2
Date
9-25-67 11-30-66 10-26-67
6-9-67 9-2-65
\ 23 1968 t-A
A?'/ MTtGN V.Ni-
ADDENDUM
SPECIFICATION NO. 535-4102-62 ADD. 8
FEBRUARY 19, 196$.
PACE 1 OF 1
t
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 8
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
FEBRUARY 19, 1968 Item 17-15-d
Having carefully examined the Specification and Addenda Nos. 1 through 8 and being familiar with the various conditions affecting the work, the Undersigned offers to per form the work specified in Addendum No. 8 for the prices quoted below:'
1. Price for performing all work described herein for cold insulation per INS-1
$ (Total)
2. Price for performing all work described herein for hoc insulation per INS-3
$ (Total)
NOTE: Each item of work (Addition or Deletion) shall be priced separately.
Da te _____________________________________
Firm Name Signed .by_ Title
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 8
PAGE 1 OF 1
Iterr.'V'--
UJ~ ^ "*
/ v-- -- ^ /J2.
UNITED states steel corporation DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 9
MARCH 14, 1963
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
The purpose of this Addendum is Co include additional unit prices for additions and deletions of work as described herein.
The following additions, with Supplementary Proposal Form, are attached to and shall be come a part of the complete Specification.
3. WORK BY CONTRACTOR
Add the following:
3.32
Furnish all supervision, labor, materials, tools, equipment and incidentals necessary to insulate ten (10) liquid level transmitters shown on the attached Drawing No. CP10-1-1-C; subject transmitters are located in Area VII-B.
LIC-6141-A LIC-6114-A LIC-6023-A LIC-6005-A LIC-6092-A LIC-9319-A LIC-6083-A LIC-5730-A LIC-6243-A LIC-5753-A
3.33 Furnish all supervision, labor, materials, tools, equipment and Incidentals necessary to insulate approximately twenty-five (25) steam-traced liquid sections of electronic transmitters as shown on attached Drawing No. SK-1,
5. ENGINEERING DATA
5.1 General
Add the following:
5.1.3 Thickness of insulation for pipe sizes up to and including six (6) inches shall be 1-inch; above 6-inch pipe size, insulation thickness shall be 1-1/2-inchea.
ADDENDUM
SPECIFICATION NO. 535-41G2-62-ADD. 9
MARCH 14, 1968
PAGE 1
-,-X. USEI000228 ....
5. ENGINEERING DATA (Continued)
5.1 General (Continued)
5.1.4 Insulation shall be complete with 316 stainless steel jacketing.
5.1.5 Items described in Paragraphs 3.32 and 3.33 of this Addendum shall be insulated in accordance with applicable sections of INS-3 (hot insula tion). All Insulation shall be one (1) inch thick.
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 9
MARCH 14, 1968
PAGE 2 of 2
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORK
SPECIFICATION NO. 535-4102-62-ADD. 9
MARCH 14, 1968
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined Che Specification and Addenda Nos. 1 through 9 and being familiar with the various conditions affecting the work, Che Undersigned offers to perform the work specified in Addendum No. 9 for the prices quoted below:
- 1. Unit prices for insulation of the following work:
Item No.
Descriotlon
Est. Ouantitv
Unit Price
Est. Total Cos
1.1 Nominal pipe size (IPS) or insula tion size:
1-lnch thick:
1/2-inch
2,000 l.f.
$
/.ft.
$
3/4-inch
100 l.f.
$
/ft.
$
1-inch
3,000 l.f.
$
/ft.
$
1-1/4-inch
100 l.f.
$
/ft.
$
1-1/2-inch
1,000 l.f.
$
/ft.
$
2-lnch
2-1/2-inch
. *"
3-inch
4-inch
6-inch /
J 1-1/2-inch thick:
y 8-inch
10-inch
1,600 l.f. 500 l.f. 250 l.f. 850 l.f. 200 l.f.
50 l.f. 100 l.f.
$
/ft.
$
$
/ft.
s
$
/ft.
s
s
/ft.
$
$
/ft.
$
s
/ft.
$
$
/ft.
s
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 9 MARCH 14, 1968 PAGE 2
1. (Continued)
Item No.
Description
Est. Quantity
1.1 (Continued)
l-l/2-ifch-thick: (Continued)
12-inch
100 l.f.
14-inch
30 l.f.
16-inch
100 l.f.
18-inch
jSO'l.f.
20-inch
50 l.f.
24-inch
50 l.f.
1.2'
Process lines with one (1) 1/2-inch O.D. steam tracer to 8-inch IPS and one (1) or two (2) 1/2-inch 0.0. steam tracer over 8-inch IPS
1-inch thick:
1/2-inch
1,,000 l.f.
3/4-inch
50 l.f.
1-inch'
600 l.f.
1-1/4-inch
200 l.f.
1-1/2-inch
100 l.f.
2-inch
600 l.f.
/ \-
t lV. \
N.
2-1/2-inch 3-inch j 4-inch / 6-inch
100 l.f. 400 l.f. 750 l.f. 600 l.f.
Unit Price
Esstt. Total Cost
$
/ft.
$
$
/ft.
$
$ _Jt.
$
$
/ft.
$
$ /ft. * $
$ _/ft.
$
$
/ft.
$
$'
/ft.
S
S
/ft.
$
$
/ft.
$
$
/ft.
$
$
/ft.
$
$
/ft.
$
$
/ft.
$
.?
/ft.
$
$
/ft.
$
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 9 MARCH. 14, 1968 PAG
1. (Continued)
Item No.
Description
1.2 (Continued) 1-1/2-inch chick:
8-inch
10-ineh
12-inch
14-inch
16-inch
18-inch
20-inch
24-inch
30-inch
1.3 Steam traced instru ment impulse lines
One (1) 3/8-inch impulse line with 3/8-inch copper tracer line
Two (2) 3/8-inch impulse lines with single 3/8-inch copper tracer line
1.4 Lines to be deleted from contract
1-inch thifck:
1/2-inch
3/4-inch
1-inch
1-1/4-inch
Est. Quantity
Unit Price
Esc. Total Cost
50 l.f. 400 l.f.
30 l.f. ?100 l.f.
180 l.f. 50 l.f. 50 l.f. 50 l.f. 50 l.f.
./ft.
?.
./ft.
$_
/ft.
$_
$/ft.
$_
$_____ /ft.
$_
$______/ft.
$_
$/ft.
$
$_ /ft. .*$_
/ft.
$
1,000 l.f. 500 l.f.
_/ft. 7ft.
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 9 MARCH 14, 1968 PAGE 3
USEI000232 .
1. (Continued)
Item No.
Description
1.4 (Continued)
1-inch thick: (Continued)
1-1/2-inch
2-inch
2-1/2-inch
3-inch
4-inch
5-inch
Srinch
1-1/2-inch thick:
1/2-inch
3/4-inch
1-inch
1-1/4-inch
1-1/2-inch
2-inch
2-1/2-inch
3-inch
4-inch
5-inch
6-inch
7-inch
8-inch
9-inch
Unit Price
$ /ft. $ /ft. $ /ft. $ /ft. $______ /ft. $ /ft. $ /ft.
$ /ft. S /ft. $ , /ft. S /ft. $ /ft. $ /ft. $ , /ft. $ /ft. 5 ../ft. $ ,/ft.p MAS 2? ic: S /ft.-w-
$ /ft. vv-.........
5/ft.
'V-'
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 9 MARCH 14, 1968 PAGE 4
1. (Continued)
Item No.
Description
1.4 (Continued)
1-1/2-inch thick: (Continued) 10-inch
11-inch
12-inch
13-inch
14-inch
15-inch
16-inch
17-inch
18-inch
25-inch
30-inch
31-inch
2-nch thick:
1-inch
4-inch
6-inch
8-inch
10-inch
12-inch
14-inch
16-inch
18-inch
Unit Price
$/ft. $/ft. $/ft. $/ft. $/ft. $/ft. S/ft. $/ft. $/ft. $/ft. $/ft. $/ft.
$/ft. $/ft'.
$/ft.
$/ft.
$/ft.
$ /ft.
------
$______ /ft.
$______ /ft.
/'
I
\
\
5______ /ft.
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-4102-62-ADD. 9 MARCH 14, 1968 PAGE 5
1. (Continued)
Item No.
Description
Unit Price
(Continued)
2-inch thick: (Continued)
19-inch
$ /ft.
20-inch
$ /ft.
21-inch
$ ___/ft.
24-inch
$ /ft.
30-inch
$ /ft.
1.5 Multiplying factors (number of lin.ft.) to be used for cost of fittings. Flanges, valves and bends for work added or deleted after this Addendum made part of' the contract.
'
6-inch and Smaller
Over 6-inch IPS
Fittings (exclusive of flanges)
each
each
Valve bodies (exclu sive of flanges)
each
each
Flanges
/pair
/pair
Bends
H.tL
/l.f.
Unit price for Insulation of one (1) liquid section of electronic transmitter described in Paragraph
3.33 with an estimated quantity of twenty-five (25)
/
S /unit
Lump-sum price for insulation of ten (10) liquid level transmitters as described in Paragraph 3.32
$
SUPPLEMENTARY PROPOSAL FORM SPECIFICATION NO. 535-41G2-62-ADD. 9 MARCH 14, 1968 PAGE <
Dace ______________
Firm Name _____________ Signed by __________ Tide___________________________ Area Code _____ Telephone
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 9
MARCH 14, 1968 PAGE 7 of 7
r>nro 5uo9o22 no o > sl
I
NI*
oo rS
^Oo >M*
I
r ?9
(>4 --5
>>9 5
Z
i/ *-j*-
f*
T
\ :m i -. i i : '3
i* j,
Lr* *1
;3
*1
V
i: i.
l;v
o
\`* i
o `O
i;:
rr<---<
C1`/ * .r-
\ ITM*
.r.r
I
:: i .
:.. - ;* 1 *
V
\ \
\
c
.-- H->
y
*4 M ui o
LG
*-' ** *
V"O
*
*-j -.i
s %iIO*
M r-* VJ VJ-.
r`J p
<rw\'i 1 *^3 I VrCOr M VJ CJ
' . <.
MM
ro PO ro ro
--} *4 -4
ro >->
TO
M.
MM
ro <I-<
n< 1 rr-r
c> jr io CO JO
rn
cj "j-3 < a - OCT <-
p Li f l-] C:.
1 O-j W ro o v
j.j \.j c:-
r. \.n i y
r: O C CT
C* I :-i
*c-;r
r-1
j
o o
S' o >i OO a >. (
*4 `O H*
KO *} O 1 ft ro ->
o o
C\ O
C \ a rj > <
H> ft
l*J (J C\ Jr tr
CO
o ns
,
L o r : >
M C-*
V* 1* ;\
1 O
!* r; S ; a cr cr S' ' . ` tr - W O > y c\
r-< o
-crosi
*"} c>
,,
cr (. u
- c:
CO C*1 " n:
-- -" Ir -i c
J r-. O
M O
c3 A
*:> o tsj o
at rv
* A
CO
_> ,s r ro
----
__
UCo fu
*4 to
11t"f
f\J
A o
.% o
0* A
"" /. ( CJ ro
;33,
i\ r
u* a
A O
ro to
*n n
fo
*0
ro
to c*
33 O
----'i -- -
o A to O A 03
ro >0
wW_
ro
o
^3
In
o
#5 o j* ro
r* o
A o
CJ to
w A
n . *n to
1 1
0
A c?
A. <u W </
<M o
to A
--
s 33
M ro
j c%
o A>
o -0 o 03
0 o
o> A
CJ ro c o
"n n ro
e o
Cm
A 0> ro c*
u> o
A
_ o
N 3>
N tW
*# t
c* c>
ro
tj. O
A
o*
*n n
ro
tf. o
a
u
1m u> ro o
u o
ro A
0>
to 33 a
A
Cy u O cs
*/ c*
Cl A
0 ro
w Cl Cs
*n n ro
es
A
0 fu o
CJ o
ro A
_ c
**4
.p to 3
ioi 'i A
J. b
Cl C)
cn o
A ro n _ ro *i ro 0
o` A Cj : fo Cl
Cm O
ro .
-4 2 ro 33
*! o
cn A w
n
w * to O & ro A n ro
4
A a Cm CJ l o ro > Ci o t.
ro o s
1 ***
m*1_r ___'
1L_.X Kl-
aK R w
T
5
-S 5 --11
uL ,El
u n11
-------7.
_ 9f _ a
fs" Rro4i
'5E--I--O*4j_J_-^_Lb-,ii
t t- ;
O) M/l
! v v. -.1 LCU
V4
i
!. J
<v;^
y<% CJ =J '-1
s K s svj -J J *-j
f-*
ov> VJ> V.,1 U! o oO
M r-*
IO ro
--1
ro
'fJj
.IvJ*
ro
ro"s* ro
o
-M<) r
o
U> u> <-0
ro w ro
Cj i-
o rn
cr :- -3 *< > CJ o o :--i
* > V: L-, Si
K C
1O
t-i to o **
j--* oi u: >J h-< >-2 ; i
M U1 y * ^
s ooO
O1M
rt1 HkO o
cr
2T O
O O
^3
a r-i M
4 *U
VO o H 1 M Ui L-i ru ca > CJ i- i-^ KJ
1 Ha CT\ O C3 o\ci ir.
i i3 i->
'w . C!\
-
CJ o :u
(\3 r
-M O yy
W EJ cr U cr
O O *J i r-" ou a >cr ci a- 'O cr m rk ;j O `O a ra
rj t-t*. C.' >") KJ cr O
*4 M .O
r; w
cr s; c'
n CA
- '> tn a
n ???:_ m!1 O "4 PJ M
7 trm
,%w'
Tr^~\ rtrylbre^J
M
xn?' i.,- j
;d ;l ., i *
5 I 'H
L*i_i-r "i <
" V'
itb
t. ;
<.o <
vV-t? xtj'^[006239r'^r*.
TYPIw-L FLOW CONTROLLING INSTALLATION
OPTIONAL ELECTRONIC RECORDER
INDICATING CONTROLLER
DIMENSIONS
USEI000240
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 10
APRIL 8, 1968
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
The purpose of this Addendum is Co add, delete and modify operating temperature require ments of piping to ba insulated.
The following additions, deletions and modifications, with Supplementary Proposal Form, shall be attached to and become a part of the complete Specification.
6. DRAWINGS ACCOMPANYING SPECIFICATION
The following revised and new data sheets are attached and shall become part of the Specification:
Data Sheet No.
Revision or Date
62 27
63 27
65 27
107 27)
108 109
227^) New Data Sheets
110 27)
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 10
APRIL 8, 1968
PAGE 1 of 1
USEI0002I7
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 10
APRIL 8, 1968
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
Having carefully examined Che Specificatlon and Addenda Nos. 1 through 10 and being familiar with the various conditions affecting the work, the Undersigned offers to perform the work specified in this Addendum for the prices quoted below:
1. Price for performing all work described herein for cold Insulation per INS-1
$
(total)
2. Price for performing all work described herein for hot insulation per INS-3
$(total)
NOTE: Each Item of work shall be priced separately.
Date
Firm Name Signed by Title
SUPPLEMENTARY PROPOSAL FORM
SPECIFICATION NO. 535-4102-62-ADD. 10 APRIL 8, 1968 -PAGE 1 of 1
USEI000218
UNITED STATES STEEL - KEYSTONE PROTECT 535- 4IOT
'N S U L A T IO H D A T A _______ ARE A. - T
(T o ri
--rm 1
6UOOOI3Sn
-z
rZS *--
1
4o 3 J n l5K/> J
m'HJ". ag5! 0?
ipS
--' O
(U Ifc
hU~l
. i
n> Vcp0 2 07 0
V mT Tpp 70 2Ju
5 sP0-
2 % %
#
O h -raPj
a5.
i f4 0O" 70
\0r T rX
ic*
OtoL U~
P7 Htf-
ur*> Cn
o V
OT
iS
* o
a
aa0-
a
tsl
? ?i ?1
<sl r*
U) r*
MrOJi
r*
_J
i 1
I U07< 1
-
4wfc*0 # ?
ul
Vu)&uzo*-l
o Vr 5T c
Ue2o*
pJ z w c P
*-V*e<pU(n1>4Orl t)
*w 1 r p* r$
0 \+r+ VrJP-1*> 7P*
V* r* p <p O ZJc/ HP
4
V*
O
oP
r*
5
r* rS0*
CrjO-
r0*
1
l<o>
r-
01
J
1
1
Oo Q0
ao. >w . s
V tsil
c-// z
V
pp* a
'V 1
E **) oPtss>j fo. &a.
yP-!O>1'/ *v V7"
pno> 7J-
V* prr7O
-o l0r
c V
Irt
+
s O0 <rrJ
O
e
13 33
.j
rO* JPj
yi
LUU. CJ
gl CtT33 IT.
p
Ji
waw.-* C5
7> A. */f S'L
p uT)
r S c3r
^ Mj.
-
:
-- i*i
"?*
7 Ul V
c * 0 Hi C <ai
1 1 1 I "1"1
ouoooi:isn.
_ Si/o'l
i! i
IrTO)
h
$
I:Tr 1
3
1 1
z i<au-1Z
U*a-J* UJ
zK
1 1
1
UJ h-7
o
' a- <
lU a: UJ <c
~z.
o h* (/> >LU
U>-J'
v
ttf ?> f-
y-> c
Pz
2az hU~J
*>
i^t
1
i
I
i9&U>
<5
-
u. <o r
03
<UtS-J) t
o
UJ ^ J-- < _J
*in
zn<z/)
o"
UJ
ZZtnZD.
J
It
0
1/
zO v
1
0
$/U)J
2
r4'
!j i
H* a.
5 uin
3
5
2
frr-
f
H
*car*-
a 7-
\
0
0
r
P* o
c%ot
U-
ai O'
r*
0y
tr~u> o
J5 rJ
E3C*
a-2-
SrtJ ;?
~7UJ 01
0
frO-
--4
aw o
zo
p */ .
cvu>/
V J_
Vj
4
<* fj e-- U)
p m
r
y0 Sor
0
r O f-
0
5 tf o
ai
o>
J\J
r
4J V<sot
o
<O-J
7
soW>
>
u 4 fot-
l
1
I
U?o>J
so
s a
f0-
0 *rJ
V t
w0Jz
t<or 0
T
n Tra
CO
rr>-
yO
r-
y0
-u*-
`41 trrf~--*
5P^
2:
0
a*
J 0r -Ur
\Or %r>
O<
<0
r O
J0r
<D > j
<0
r*
>
`UUuJ/
QJ
u/ UJ /-
"V V
0
5T r
r0 Q%aZ
0-
UJ >
<&0L Hi
tU
tzJU4
Hi)
`h T 15 (Y r
0
J
nf
jJ
0
a p0O
e* ->
0
r&J-
AnI
3 13
<a trn6
--
LI
1 1
< V* 1
1
r 1!
\
__u12 ..(-
1
)1
.Ji-5 m.j :.'_ |<7
!
1 . r- >
1 1
1
3,7> -
11
0i
LrCUr*
On
0 /-
>
1
<33
1a--
*00
_! "-a
00
IU >
0
r>-4
% (jj
UJ
UJ
UJ
3"
s: UJ
0
0* u-
U2 J r*
*jO
u>rJ
0 rJ
r*J5
p00^9-
333
CO
cr*1&
1.1
I i1
1 1t t
,.
r
'
v'
~zS\r '.
P
V
ir ;
LtC
`
UNITED S TA TE S S TE E L - KEVSTO NE P R O JE C T S35-.A1QT_
IN S U L A T IO H t> A T K A R E A -____________________ C w T )
' 1 1 1 ~n
Ji
1
K s* T
3
1 HU>-
u 4
UUJJ/
aC t-
5
LK0
.
>
! I
Ul LU 0
0
S
I ZiOlJ0I3S.1 1 1 1
1
Ual
n fe O
--
--r o
02 Ui
"Ouo<r.>
Umi -^
1-- m
V
i
0
rT r~
h
0
De
7* f*
vv-
r p
2
2 V 23 UJ
0 i-
t 7* V &
n3 1
_
o.
2 V
lO
Vr~ P
P
7
rr* P
y x
s jT 7* U-
lii >
t O
0 it
& U-
?
aJ r~> J5
15 , a-2-
c- r* Pv & 33
co p014 3
UJ
3* ro r>
--
US
iT^
9w-
rr>
AVj
1 rJ
o
r~ *o
0 7-Xr
*r r~ O
*0
7P
W X
ao
VrO 7
> ai >
<
"o tf" P7
t s a-
U a a V
oX
a
0
Vj
1<rrr>-
*o9
#4
Ir*r0T-19J
s
3P3
rf A
I 1
1
1 u/ o Jo <5 O
P
ii
1
11
1
i
11i
iJ
i
1 !
fin i
z
_ LL.
i
s V
-
! !!
1!
1 1
i
a
o rJ N
J c0
J
J pi (* Ll -v
3 u> 10
J
* o
* C
<C 0-
<
v'*
(P &
co 1
p o 0 * IT'
t 0 o
Jr ~<p
\y o
o CO
fl3
*
o
o r
U o
rP
Fo o </c
0 u.
0
u z
c F
d
oaX Cl >
/
oO 0D
PeJ- pa*j
?0 r 33
-J
r* o
O rr*-
P
P
-
j
,
*3.r
v
%
*" > "r
o
X 10
Q
in
i
a LJ
1 3L
i
1 i ;l
1
1
ii i
i:
pj
2^
TR5
m
tn
zzzoooiasn
P
<j
LU H-J O u1
a- c
in oL UJ <c
X
o
Pin
y LU
V
~
/
h*
P LU 03
ftT/ 1
O
LU h *- <
-j
P in </
> UJ
X
LU
U
^iu
|^S mi
ir-
oJ. UJ
0/
Z
2
o z o h* a. 3
o
ai
X
3
U>
>
UJ r- u5
o n JO z-
UJ 7 01 -Z
o
I
* jC 3 *o0 o
tfj c/ J
Ul
"V fc
* p
-3
o z
o
r*
** r-
* 4?
CP
o
0 P .i
%o al rJ
& ul z
o \r o
o p-
a
o N r>J
J
*
<
O
ar
o r* P
ZT| <20
X> z
#o
a
J o o <* U- -v
r> /-J
To
.1
i t--i
II
4'
ii
! '<*
J_ -s*
i i.
rp\
ij ^y
! >i ;^!
X
/ r\ t; i 5 o <c
u \ - U - K U J> M J H U > K ^ v l >-V- I
`r iy t.
.^EVCt) 1 z 9 * 6 G R tv . @!*>'<&
@ j } i ]y 1o 4*1
C^T) 3
UNITED STATES STEEL CORPORATION DESIGN ENGINEERING - PITTSBURGH
225 GULF BUILDING PITTSBURGH, PENNSYLVANIA 15230
ADDENDUM
.SPECIFICATION NO. 535-4102-62-ADD. 11
MAY 28, 1968
INSULATION OF PIPING AND EQUIPMENT KEYSTONE PROJECT
PURPOSE
The purpose of this confirming Addendum is to increase the scope of Contractor's work in Area 7 to include insulation of additional process lines described herein.
CONTENTS
The additions and revisions contained herein shall be attached to and become a part of the complete Specification.
This Addendum consists of: Information Sheets, pages 1 and 2
AMENDMENTS
3. WORK BY CONTRACTOR
Add the following:
3.34 Furnish and install insulation for all lines including valves, flanges and fittings shown on the drawings listed per this Addendum, in accord-
ance with Specification INS-3 "Insulation of Hot Piping, Valves and Equipment - Keystone Project".
5. ENGINEERING DATA
5.1 General
Add the following:
5.1.6 Insulation thickness schedule for hot piping up to 400 F. listed in INS-3 shall be applicable.
5.1.7 Insulation material shall be calcium silicate, molded type, if Pitts burgh Coming Unibestos molded pipe covering is not available.
SPECIFICATION NO. 535-4102-62-ADD. 11
MAY 28, 1968
PAGE 1 USEI000205
AMENDMENTS (Continued)
.6 DRAWINGS ACCOMPANYING SPECIFICATION
NOTE TO CONTRACTOR: All drawings listed per this Addendum marked in green indicace additional process lines to be insulated.
Add the following revised drawings:
Drawing No.
Revision
Title
W-24605
11 Pyridine Plant - First Floor Piping Plan
W-24606
9 Pyridine Plant - Rack Piping - Plan and Sections
W-24607
12 Pyridine Plant - Second Floor Plan
W-24608
"7 Pyridine Plant - Piping Section "A-A"
W-24609
8 Pyridine Plant - Sections "H-H", "L-L" and "S-S"
W-24610
8 Pyridine Plant - Sections "J-J", "K-K" and "F-F"
W-24611
5 Pyridine Plant - Sections "B-B" and MD-D"
W-24612
4 Pyridine Plant - Sections "C-C", "M-M", "E-E" and "p-p"
W-24618 W-24619 W-20641 W-20644 W-20674 W-20676 W-20677
5 Benzene Storage Tank - Piping Plan 4 Benzene Storage Tank - Piping Details 15 Light Oil Recovery Piping - Lower Plan 7 Light Oil Recovery - Partial Plan and Sections 11 Light Oil Recovery - Elevation "KF-KF" 14 Light Oil Recovery - Elevation "KB-KB" 9 Light Oil Recovery - Elevation "KC-KC"
A\> '
RLCEWEli
inj wiA'i m
,\
r..
v- "" xls*/
ADDENDUM
SPECIFICATION NO. 535-4102-62-ADD. 11
MAY 28, 1968
PAGE 2 of 2 USEI00Q206
ana mitt ma eawounec dcsicx DciwniK - rmutaot
235 CULT B8XL9DV nnssna, nxnn.MJu uix
sTtsxnaszm so. S55^i02*2-tfe. u Pn7IATI0 tfWWMB amew ygjtct
MAT 2, INI
RPWt
f tu*
<* li u UttMii eh* imv* *( CattMur'i rk
la Ana 7 ti laalaA* laaaladn mt *4411***1 yiwui Ua*a Aaecrlha* kanla.
^t*a amMLUUaaaSaH*4UrnrruUntaatu. aaatalaa* ktnla tUU W ittM tv md Ucat m w
aoa
MMKu aft Xsfataatlaa Omu, pa*** 1 m4 3
ogqgt!l
2. 2B-EJ3E3m
A44 eh* faUawiact
3.3A
Tiitiik m2 UKtU taaalatlaa far aU U*m ftlw, fUt)M
aal flcuac* Oa aa the
UitH p*r U* AAAaMn, la actar>
naa t Sndttcatlaa m-} "Uaalatlaa f he M1m, Valaac a*4 Xiatyaaat - IrptaM