Document bvY4rVvmj1ejv2ag5v7pyvVD
EWS from the power front
ington Pump and Machinery Corporation
Harrison, N. J.
The Only Uniformly Continuous Hot Prod Water Softei
Continuously uniform Creatine results can be ebtfiS only ,rtreating process ,,S unJtsturbed during recirceflg
of filter backwash water
Worthington's ciclwiiTt. sign completely divorces! filter backwashing operffij from the treating process, by permitting continuously}? form treatment and previ$ filter deterioration.
A wash water storages settling compartment (jeeS gram) provides clear, hotSL posit-frec water for backwsj&|
purposes, thereby etimioffi| filter difficulties, increasing? period between backwasu operations and decreasing? time of the backwashing ojWii tion. The filter is washed d3 with clean water without & curbing the softening process!
_____ .... Hat Process Deaerating Seftener design tHmiweUsl
filter
rrwMn.
10 Years in a Hospital and Never a Patient
Ten years ago, the Oak Forest Infirmary in Oak forest, Illinois, installed a Worthington 600 kw geared direct-current turbine generating unit.
Over the ten years, the unit has operated continuously and with out attention in the way of serv ice except for an inspection every four or five years.
The machine is a non-condensing unit operating on steam at 150 lb initial pressure, 0 deg F superheat, ana exhausting to 3 lb back pressure. The exhaust is used for heating water, cooling, baking and to heat various build ings in the institution. No live steam direct from the boilers Is used for heating since, in addi tion .to the turbine-generating
fPortbiagra* TarkheXSentmtor--Oak Fares! Infirmary, Oak Parett, M *1
unit, most of the auxiliaries such ns pumps and fans are steamdriven.
It is estimated that the savings made by running their Own
plant, over the cost of patch**
power and generating *te>. heating only, have been w[ tial, paying for the Worth* I***
unit a number of time* ove
pumping for Pipe Testing
L' iPertbiagten 44JX-I Pump and (Parrbiagtaa T2RA Tarbiaa . . ..tap- plying high pressure water, A. M. Byers Campaaf, Pittsburgh, Pettna.
A. M. Byers Company, ns you
probably know, manufactures
wrought iron pipe for many pur
poses--particularly for the tast-
becoming-popular radiant type
of heating.
3i-i All-ics:|>tpe is ,carefully-.tested^
in the'plant/ap'd for this purpose?'
it uses a Weighted accumulator''
system. To supply the high' pres*
sure water,. Byers ..-selected a->
jjWbrthingtotv pUmpand Worth-
'/ington turbine, choice of the *
Worthington equipment was
based primarily on its compact--.
ness, economy in steam.con
sumption, and the speed- with :
which it gets into operation.
.' The pump Is a 4-UX-l, de
signed for capacities between
1 350 gpm and 500 gpm, produc
ing 800 lb TDH with 50 ft or '
more of suction pressure. It runs
at 5600 rpm, and the minimum
BHP required at the maximum
condition is 334.
The turbine is rated 350 Rp ai
3600 rpm, and operates on 156
lb steam with 50F superheat and
2 lb gauge back pressure.. It is
equipped with a hand speed
changer.
f ''. `
Sewage Gas Engine Returns $199,000
[aiiaual report of the Fort '(Indiana) sewage treat>Unt reveals a 1946 saving -000 by the 465 hp Worthgas engine installation, 'dogs the total six-year
f i? >199,000.
' plant, considered one of standing municipal de nts in the country and a aim for inspection tours ioeers from other com^s, was completed in 1940. "*yne had been mandated Indiana State Board of
Jjj to cease pollution of the "!*'* River, and now the
sewage is so free of ofmaterial that the river is II* of sustaining fish life, ^sewage treated in 1946 nted to 6,648,960,000 gal-
"la average of 18.73 milday. From this 7,000 tons
i^gc wa removed, and into **890.000 cubic feet of air imped.
Worthington gas engine
was originally purchased at 'a cost of 830,000. The estimated saving is based on what it would have cost otherwise for addi
tional electric power. The ' engine contributes to
. heating the sludge digesters. The
sludge is pumped in liquid form into four covered digesters where ii is decomposed by bacteriolog
ical action, producing methane ' gas. Heat from the circulating water in the engine is used to
raise the temperature of -the sludge to thes daesinred point for
^ bacteriological digestion. 6, nine billion BTU's of heat went from the engine to the
digesters -- equivalent to6S0 tons ofcoai.