Document bqKy22EZOpELgw4M3vDwma3D

V TO: Union Carbide Agricultural Products Company, Institute Plant Inc. I N D U S T R I A L H Y G I E N E SAMPLING n*cmED B_E-i2i%8S Mr. F- Boggs COPIES TO: Mr. D. A. pugaj.-- Building 303_________________________ Mr. C. E. Miller Institute Plant_____________________ Mr, D. D. Miller Mr. M. E. Tapp_________ WMr. L. . Youngblood Purpose: _________ Quarterly __X____ Semiannually -------------- Annually _________ Regulatory Agency Inspection -------------- Other (See Comments) Sample Date(s): August 1, 4 and 5, 1986 Sample Location: Landfill Department No.: 308 Process/Activity: Waste Disposal______________________________________________ ____________ - Contaminant: Asbestos Exposure Limit: OSHA 0,2 fibers/cc (TWA^);-(TWA^) ACGIH UCC AIHA 0.2 fibers/cc (TWA );-(TWA o _________-(TWA ):"(TWA ) o _________-(TWAq);-(TWAi2> ) 12 i.z Sample Type: X Personal X Area _______ Source Surface Wipe _______ Other (See comments) Analytical Method: Per 29 CFR 1910.1001, Appex. A Results: ____ See Comments X See Attached Table COMMENTS: Four job positions at the Goff Mountain Landfill were monitored for exposure to airborne asbestos fibers on the above dates. Area concentrations of airborne asbestos were measured too. The monitoring encompassed typical asbestos waste disposal, which consisted of using a front end loader and a bulldozer to blend the material with dirt and pack it down. The front end loader and bulldozer each were eguipped with enclosed.cabs and air conditioning units that provided filtered, cooled air to the cabs. In addition, the eguipment operators wore half-mask dual-cartridge dust respirators while in the cabs. UCC 008988 AU4003 -2 The monitoring also covered operation of the drum crusher and typical area cleanup by the laborer. Cleanup consisted of sweeping the paved area around the landfill office and removing debris from the perimeter of the land fill._ ________ Due to the hot and dry weather, "worst case" conditions existed during the survey regarding the potential for generation of airborne asbestos fiber concentrations. The monitoring and analytical procedures were performed in accordance with 29 CFR 1910.1001, including Appendix A. The personal monitoring results for the laborer and environmental specialist job positions were all below the PEL as well as the action level (ie, one-half the PEL) for asbestos. The front end loader and bulldozer operators' exposures also were below the PEL though they did, reach the 0.1 fiber/cc action level. The area monitoring results showed that concentrations of airborne asbestos fibers greater than the PEL were generated in the immediate vicinity of the bulldozer and front end loader while t.hey were being used to blend and fill asbestos waste material. However, the extremely low concentration measured directly downwind of the disposal area at the drum crushing facility showed that the airborne asbestos fiber?:: rapidly settled and/or dissipated within the confines of the landfill.____________ ____________________ Based on the above results the following actions are required: A copy of these monitoring results must be posted ire edlately in the workplace (ie, the landfill office) where they will be accessible to all affected employees (including contract employees'* for review. The affected employees should be made aware that the resuits have been posted. (Note: this was done prior to issuance of thi s report). UCC 008989 A04004 Because airborne asbestos fiber concentrations measured at the disposal area during blending and filling exceeded the PEL, the "face" of the landfill must be established as a regulated area as soon as possible but no later than November 17, 1986. This requires: 1. Posting of warning signs in conformance with the requirements of 29 CFR 1910.1001 (J)(l)(i) and (ii) to Identify the regulated area. .................................................................................................................................................................. 2. Prohibition of eating, drinking, smoking, application of cosmetics and tobacco and gum chewing in the regulated area. 3. Use of half-mask air-purifying respirators equipped with high efficiency filters (or better*) by anyone entering the regulated area, regardless of duration. *Note: Powered air purifying respirators must be provided to employees if they choose to use that type of respirator. In \ addition, employees using negative pressure respirators must be fit tested before entering the asbestos regulated area and they must be fit tested every six months thereafter. Selection, use and care of respirators must be in accordance with the requirementsof29CFR1910.1001 12L_____________________________________' A0400.H Training must be provided to the front end loader and bulldozer operators no later than October 20, 1986 and at least annually thereafter since these two lob positions were exposed to airborne UCC 008990 4 concentrations of asbestos fibers at the action level. Training must cover the topics shown in 29 CFR 1910.1001 (J)(5). Medical surveillance must be provided or made available to the front end loader and bulldozer operators no later than November 17, 1986 and at least annually thereafter since these two job positions were exposed to airborne concentrations of asbestos fibers at the action level. Medical surveillance must be performed in accordance with 29 CFR 1910,1001(L) . RECOMMENDATIONS: In order to complete implementation of the above required activities, the following recommendations are made: 1Per the advice of Employee Relations Department and Medical Department supervision, Environmental Protection Department supervision should______ immediately pursue the establishment of a contract between Union Carbide and Henson Brothers, Inc, in order to provide asbestos training, medical surveillance, respirator fit testing (if necessary) and respirator training to the bulldozer and front end loader operators on a fee-for-service basis. When the contract is established, Industrial Hygiene personnel will be available to provide , the required training and fit testing, upon request. 2. Environmental Protection Department supervision should take appropriate steps as soon as possible to insure that a sufficient quantity of suitable respirators are on hand for the heavy equipment operators and the Institute Plant truck drivers who must enter the regulated area. In addition, a routine program (if one does not ..... .. ... .... ' AU400; UCC 008991 -5 already exist) should be established with Safety Supply for the ( 1 cleaning, disinfecting, inspection and repair of the respirators. i^ 3. Maintenance Area VI supervision should contact this office as soon as possible to coordinate the respirator fit testing and training that is required For Institute plant truck drivers to enter the landfill regulated area. (Note: Already underway at this time.) i / 4. Environmental Protection Department supervision should contact this office Cor assistance in establishing the regulated area at the landfill. (Note: Already underway at this time.) Report Date: October 17, 1986 :Signed ZJJLCin Bldg. 2 Room: 172 Phone NOTE: ALL PERSONAL SAMPLE RESULTS MUST BE DISCUSSED WITH THE PARTICIPATING EMPLOYEE 6105 0400 "7 UCC 008992 Union Carbide Agricultural Products Company, Inc. Institute Plant INDUSTRIAL HYGIENE SAMPLING RESULTS WORKPLACE LOCATION: Landfill NAME(s) OF SAMPLER(s): E.A. Osby & J.L. Miller CONTAMINANT: Asbestos REPORT DATE: OSHA PEL: TWAq0.2 Fibers/cc,TWAt -j - AI HA WEEL: TWAg-,TWA12 ~ October 17, 1986 ACGIH TLV: TWAg0.2 Fibers/cc,TWAi9 - UCC GUIDELINE: TWAg - TWA12 ~ Sample Number Sample Date W-4700-AA7915 W-4700-AA7923 8-1-86 8-1-86 W-4701-AA7925 W-4701-AA7932 8-4-86 8-4-86 W-4702-AA7935 8-5-86 W-4700-AA7916 W-4700-AA7924 8-1-86 8-1-86 W-4701-AA7926 W-4701-AA7933 8-4-86 8-4-86 W-4702-AA7936 W-4702-AA7940 . 8-5-86 8-5-86 Sample Description Sample Time (min.) Sample Results (fibers/cc)* Front End Loader Operator L. E. Pauley L. E. Pauley 265 125 ** L. E. Pauley L. E. Pauley 170 225 0.11 0.099 0.10 L. E. Pauley Bulldozer Operator C. E. Wheeler C. E. Wheeler C. E. Wheeler C. E. Wheeler C. E. Wheeler c. E. Wheeler 375 265 120 170 225 180 195 0.068 0.051 0.17 0.09 0.Q97 0.10 0.099 0.087 0.12 0.10 UCC 008993 4 04 0 u1;\ Sample Number Sample Date 2 Sample Description Sample Time (min.) Sample Results (fibers/cc)* W-4700-AA7917 8-1-86 W-4701-AA7927 8-4-86 W-4702-AA7938 8-5-86 W-4701-AA7928 W-4701-AA7934 8-4-86 8-4-86 W-4702-AA7937 8-5-86 W-4700-AA7918 8-1-86 W-4700-AA7922 8-1-86 W-4701-AA7929 8-4-86 W-4700-AA7919 W-4 7 0 2-AA7 939 8-1-86 8-5-86 Senior Enviromental Specialist J. R. Fizer 375 J. R. Fizer 395 J. P. Monroe 205 Teague Laborer R. L. Barker R. L. Barker 303 90 A. E. Barker 370 Back end of front end loader while asbestos was being worked into landfill 35 Back end of front end loader while asbestos was being worked into landfill 10 Back end of front end loader while asbestos was being worked into landfill 15 Drum crusher area 304 On side of bulldozer while asbestos was being worked into landfill 15 0.01 0.018 0.028 0.021 0.016 0.020 0.029 0.39 1.2 ** 0.0047 0.98 Personal sample results are reported as time-weighted averages. Sample could not be analyzed for asbestos fibers due to excessive dust accumulation. UCC 008994