Document bmEbvLqX4QGG7Dn0DNy5bmzD
A. EASTERN REGION Manufacturino
MONTHLY MANUI ACTURINC REPORT JULY 1975
1. FINANCIAL SUMMARY a. Results
Plant Sales June Plant Sales July Plant Sales YTD
b. Discussion
Inter-Co
$ 184,000 177,000
$1,505,000
Trade
$ 109,000 118,000
$ 844,000
Total
$ 293,000 295,000
$2,349,000
July sales were still depressed and about the same level as June. The plant is working two shifts with the second shift on a very limited basis. The work force remains the same as June with 34X of the work force on lay off status. 712 tons of product were produced which was a 15X decline from June.
2. FUTURE VARIANCES
a. Recipe .
Trials on an RM 265A free Kalminex is progressing. Field trials should be conducted in mid August. Thus far nothing has been done on EP 5676B.
b. Foseco Trucking
Savings for the month were $10,732.34. 65 trips were made which was 75% of the total freight hauled out of Mt. Braddock. Cost per mile was again reduced slightly to $.689 per mile. Accumulated savings thus far in 1975 are $68,887.64 for an average of $9,841.09 per month. Average cost per mile thus far is $.701 per mile.
c. OSHA
All violations cited in the july inspection have been corrected. On
August 5, 1975 the eye protection program was established and is
being enforced. No apparent problems were encountered.
d. Quality Control
Tl ' * i
Exotherjoics
Production in this area was higher than reported this period. Misplaced reports weren't included, but confirmation by F. Ghrist indicated that our scrap percentage is in line.
PLAINTIFF'S
I EXHIBIT
Ptlfiv-TTSn
' w` W
i
2930
s- -
II MAJOR PROJECT PROGRESS
A, Asbestos-Free Conversion Program
1) Objectives, Scope, and Potential Impact
Eliminate asbestos and develop asbestos free recipes.
(Origin January, 1975)
*
2) Project Status
#685 Copperweld - Thermex increased penetration and is giving at least equal results at lesser cost, according to customer and sales reports. The revised tool which is needed to improve Foseco's position was ordered in May.
#800 Kaiser Steel - We have reverted to asbestos-bearing Profax 10 in order to obtain much-needed sales dollars. Kaiser yield test results on the EP 5672Pare reported as "not too good". Actual metallurgical results are awaited.
Seal-On Rings are being made in an "almost asbestos-free" recipe in Chicago, but Cleveland Is still unable to make production runs on the Mark IV machine.
B. New Seal-On Programs
1) Objectives. Scope, and Potential Impact
To design, plan, and follow-up the various Seal-On Programs. (Origin January, 1975)
2) Project Status
#985 - 25" sq. U.S.S. - Gary - Apart from some problems with undercured rings which were difficul t to handle inthemill, this program continues and should improve when business picks up.
#737 - 33" sq. Bethlehem - Lackawanna - We now have two full drags of
castings - a total of 64. Some serious leaker problems are believed to
be due to a combination of poor quality Chicago rings and mis-fitting
side boards. Corrective action was taken. On the other ingot size
(#1160) Ferro got the first 4 test castings but Foseco will get the next
` four.
~
-h
#453 - 34" sq. Republic Chicago continues as one of the most promising current accounts and an Increased share of business is being pursued.
A problem with casting location on the mold is being corrected by sales We now have 147 castings in service.
2931