INTER-OFFICE memo
TENNECO
CHEMICALS,
INC.
TO J. T, Sweeney
At Flemington
Date December 7, !
From R, A, Lojewski
AT Flemington
Subject
VCM Exposure Data and TWA - Flemington Plant Area Monitoring System Period: November 20, 1976 to November 26, 1976
t
Copy to
W. D. Bord C. N. Brown* R, F. Fanter W. R. Fogelsanger W. F. Gabel D. M, Hershkowitz F. W. Kanzler W, Miringoff P. M. Reed S. Robbins* M, K. Rosen G. I. Rozand F. Toca R. J. Young
TWA Only*
Attached are Plant Summaries (Tables I-III). Table XV lists all excursions at or above 100 ppm including the number of incidents. Table V shows the TWA by job classification calculated from the data in Tables I-XIX. Graph #1 shows the percentage of readings above 1 and 5 ppm VCM for the Reactor Building while Graph #2 shows the weekly averages for the Reactor Building and the Pilot Plant. Also attached is an analysis of the Plant data by W. D. Bord.
The Plant was in operation seven days for this report period running at about 100% utilization. The four G, C.'s were on computer control.
Area
Total
>1 N%
*5 N%
>25 N%
> 100 N%
Reactor Building Recovery Comp. Room Pilot Plant General Area Parshall Flume
7,648 476
4,347 6,220
621
4720 467 342 421 62
62 98
8 7 10
415 5 449 94
11 0.3 50 0.8
2 0.3
50 0.7 4 0.8 00 4 0.06 1 0.2
5 0 0 0 0
0.07 0 0 0 0
All readings greater than or equal to 100 ppm VCM are tabulated in Table IV. Five readings at or above 100 ppm occurred this report period reflecting two separate incidents. Two incidents occurred in the Reactor Building affecting the center aisle 2nd floor, stripper platforms #1 and #2, and the panel board. There were no incidents in the General Area, or the Pilot Plant during this report period.
RAL:ms
R,, A. Lojewski
010317
Monitoring Point
Ti^Jp I REACTG. BUILDING
NX
Period Covered if'Sb/n-atrfL
>1
>5
`>25
> 100
Center Aisle Column #2, 1st floor Center Aisle Column #4, 1st floor Center Aisle Column #6, 1st floor #1 Slurry Transfer Pump, 1st floor #2 Slurry Transfer Pump, 1st floor DeFoamer Tanks, 1st floor VCM Day Tank Area Center Aisle Column #2, 2nd floor Center Aisle Column #4, 2nd floor Center Aisle Column #6, 2nd floor Stripper #2 Platform,, manhole, 2nd Panel Board Column #7, 2nd floor Stripper #1 Platform, manhole, 2nd Knock-out Pots, 2nd floor Foreman's Desk Dry Chemical Weiqh-up Area Stairwell in Hallway, 2nd floor Weiqh Tank Chip Basket Area
floor floor
Total
?38
238 MS
o o732
O 238 238
22 C23L >23. 22
22
C22
22 22 22
633.
74
0.3 3
/o
_ jz _
7...
SP6CML <------- :--------u1
SPCM <------------------
0.9 38
io 2.8
/4
2.
a/
3.3
w m
4.8 _
2.7 w/
2$ 2.2.
2.
U
4.0
fffj
.
Wao
RECOVERY COMPRESSOR ROOM
9
/o
8
/2
7/ 77 3C Zf 37 0/ 38 4o ss 30.
w/f
lO 2O /O
----------------
________3
--:-->
2 ... 0 t0 8/
t4. ________LL___ /
%- _______ L_
s. 0 7
_ 0_____
0
0
0____
So
Q
s
Monitoring Point
NX
>5
^ 25
^ 100
#1 Recovery System #2 Recovery System
00 CO
Total
338 -A32L____
7>S
7.9
334
232.
^C7
__430
_______J.______
0
off
_/ _____ Q____
Wf
R. A. Lojewski 4/7/76
TABLE PILOT PLANT
Period Covered
.
Monitoring Point
Stronq Scott Drver - Process Buildinq : Boiler House t Pilot Plant Laboratory - Process Buildinq
Centrifuqe - Reactor Buildinq > "F" Reactor - Reactor Buildinq
> Parshall Flume
T Plastisol Tower - Reactor Buildinq
} VCM Storaqe Area - Reactor Buildinq 3 "E" Reactor - Reactor Buildinq
) "B" & "C" Reactors - Reactor Buildinq
*/w
*Tot#1
N
^57
o
tel tel tel tel tel (at
&?/
4s&
___ _y___
>\
- >J>_______ 7 ^5
>
0.3, ..... 33
S?CML < --
PJ
____
O /
o
/
o3 9 os te
1 &
0.6 30 . 3
PA.
10/
3
o.S
....... Jl...
Sf&t/Al. <------------------
o.4 d4a //
Oo
------------
o ____ o_
Ol
___
_o
o_
/Q
______ Q_____
O
Q.
.O
O
------------ >
oO
R. A. Lojewski 1/8/76
010319
TA III GENERAL AREA
ig/hPeriod Covered M6III-3C-7C
Monitoring Point
1 Truck Loading Platform 2 Oualitv Control Laboratory, West 3 Oualitv Control Laboratory, East 4 Lunchroom 5 Bulk Loading Tower 6 Dryer Room 7 Bagqinq Room - Baqqers Seat 8 Maintenance Shop '9 VCM Transfer Pumps - Tank Farm .0 1 Tank Car Unloading Platform
Total
N
22 622
622. Las 622 22
22. 622 622 622
1
(>3S0
Y
O.l
0-5"
OJ O.l _ 0.2 0.2 OJ 0.7 0.9
O.tf
>1
/o i7L3 o.
4 ... /8 O /2 /29 89
*6/
>5
> 35
7
O // L
o /_ o. o o /r
ts.
So
O-..-
/
o
O.....
o
o ____o___ oo
Q ..._0__
<0
O_____ o O ____ Q__
....._&_____ ..,,o,,
/o
R. A. Lojewski 1/8/76
010320
I
$rk -fine
/m-n *&* /SS*
::;\:",../&?
oIq9
i J Tmu :nr
1' i - --r
i- !....i
o/t[ 6/f^r<f/f; YM,.. j /qo ^m VC /n i
:..! -i.1--4-J---4
' L\' ! i
'< t
-
1 >S
..Lj_4
'--4---- 1--
L .i..j ...I. j.._L ! - : ' 1 i ! ; 5
A CoJLoA*/*
i .4-
}-~ '
!\! - I1!
;; - - -ii -
;!
i"! ;i i'T'
T -r--
J,,j_.
ri
!t
ri`
: i il m:i: j; ;I L J__ l--___ *!:r
'.....r -
ii
4--j-- 1
ii
)i
* j ij i
4--4- --t------- 4.... 4
i i i! ;
i 1
l-M-rr
!....... *.... _ ;i
' . ,
--L ~"T"'i....!** j .....l "']' T" ; .. -j] --i , -~-ij- -1J; ii : !
... \-
r-1 -1
ii;
i'T' T
;.; i
i
... i.
I' I
__ L. ! I
.i
,,4. ,.j... j ....; . J ... .
_____
>: !) :!
1
;---------.u.
....
-- .... J
'j -. 1 - i
i [--i-r-
i1 J ;-- | --4' --
--I-4- j! -! - !
i.. :....! i.
.... ....
-f-- r
t
-+
i
-l-
1
: tfni 1-7C
010321
FLEM1NGTGN TIME-WEIGHTED EaPOSUhE AVERAGES CALCOLA1ED FROM BENDIa MONITORING DATA
11/20/76 TO 11/426/76
cjOB CLASS 1F1 CAT!ON
TWA
TABLE V
RESIN PLANT
POLTFGRMAN W A1H
wopolxFurman
ath
SHIFT FORMAN W AIR
SHIFT FORMAL WO AIR
reactor uper-chhg w air
woreactor oper-chkg
air
REACTOR UPER-DUMPG W AIR
REACTOR oper-dumpg WO AIR
REACTOR OPER-BELIEf W AIR
REACTOR OPER-RELIEF WO AIR
UTILITl OPER W AIR
UTIL1TT OPER WO AIR
DRIER OPER
WAREHOUSE SUPERVISOR
WAREHOUSEMAN'BAGGER
i-3 2*1
-7 2*3 2.0 2*o 1.2 2.6 1*3 2*6
-b A.2
.2 *1 *2
GENERAL AREA
MAINTENANCE FORMAN MECHANIC SHIFT MECHANIC DAT BOILER OPER MAINTENANCE STOREKEEPER
MAINTENANCE CLERK EFFLUENT MAN W AIR EFFLUENT MAN WO AIR UC TECHNICIAN UC SUPERVISOR
.2 2*2 1*2
*1 .2
.1 .2 .3 .4 .3
-
GROUP LEADER ENGINEER TECHNOLOGIST TECHNICIAN W AIR TECHNICIAN WO AIR MAINT TECHNICIAN
PILOT PLANT
.4 .3 .3 .3 .4 .3
010322
r ~r *
Bendix Data Comments for the period November 20 to November 26, 1976
Reactor Building Area: There were two reasons for the 2.0 PM average in the Reactor Building area during the time period November 20 - November 26. 1) Because of mechanical problems with the vapor containment tank,the by-pass line to the ponds had to be used. This causes the surrounding areas to be higher than normal.
2) The outside atmosphere being drawn into the reactor building was over 2 PPM.
General Area; The General Area remained at a low 0.4 average.
Current Projects:
1) Installation of water sprays in the reactors will be started by December 1, 1976. This project will reduce the amount of VCM fumes exhausted to the atmosphere from reactors being aired out.
2) Special Bendix heads are still being used to determine if specific operations are causing high readings.
WDB:ms