Document beRx4BbkZdDo8N1oY1g4ymok
CELANESE PLASTICS & SPECIALTIES COMPANY Chemcel Plant Bishop, Texas
TO: E. Munoz FROM: R. L. Bunkley
RLB-54-79
er 4, 1979
Quality Control Monthly Report September, 1979___________________
Dr. R. A. Daniel - Chatham Mr. J. W. Beltz Mr. A. R. Kurkowski Mr. R. W. Murphy Mr.- F. M. O'Neill Dr. M. L. Druin (6) - Summit Mr. C. Gottfried
Mr. A. C. Abshier - Bishop Mr. W. S. Allen Mr. C. A. Amond Mr. G. Artripe Dr. H. L. Davis Mr. J. C. Doedyns Mr. D. L. Dotson Mr. R. D. Fuchs Mr. C. L. Hammond Ms. A. R. Hancock Mr. L. N. Harvey Mr. H. P. Hohon Mr. J.. L. Merian Mr. W. H. Meyer
Dr. M. Meisters Mr. F. B. McAndrew Mr. W. L. Shearer Mr. M. M. Wilson Mr. D. Zimmerman h Summit Data Files p T. J. Welsh - Chatham
Mr. A. B. Milam
Ms. P. J. Moede
Mr. R. G. Rothenberg
Mr. J. D. Saladino
'Mr';':: A;T:G;!;_Salinai3
Mr. P. N. Thomas
Mr. D. Wallen
Mr. E. D. Wendler
Mr. K. A. Wolf
File:
3.017
301.014
501.009
Central Files (3) - CCCTC
004167
GENERAL SUMMARY
Product waivers for Celcon production lots totalled 30.4% of the month's production of 7.02MM lbs. The major out of specification quality parameter for Natural Finishing was melt index with pellet quality and natural color accounting for the second major product variances. Special Products experienced out of specification Kd and poor pellet quality as the major causes of product waivers.
Celane^ quality waivers were required for only 3% of the month's production total of 1.7MM lbs. These quality waivers resulted from out of specification ash content and flammability test 'failures on the filled products.
Nylon waivers accounted for 31.6% of the month's .production total of 1.5MM lbs. The major causes of quality variances continue to be out of specification volatiles and RV.
I. CELCOtffi:
A. Customer Complaints - Dotson/Tijerina/Hemandez
^
1. Polymer Corporation entered a precautionary complaint (P-5558) citing underweight bags of C-245 from lot 90-32691. The bags were labeled 55 lbs. but contained only 5 -lbs. each. The complaint was found to be valid, as the bags were incorrectly labeled. Distribution was requested to isolate and correct the labels on any future shipments of this lot of material. The appropriate personnel have also been made aware of this complaint and instructed on proper packaging weights. (DLD-198-97)
2. A precautionary complaint (P-5525) was entered by Sterling Plastics on a lot (9042171) of Celcon GC-25A black. The customer experienced a white deposit on his molded parts and mold when using this material. Samples of the parts and resin were sent, to Summit for evaluation.
Plant records indicated the lot of material to be speci fication product. Summit reported the white deposits on the parts to be exposed glass fibers at the part surface. RTS recommended that the customer's molding temperatures be increased to minimize the problem. (DLD-197-79)
3. -Injectov Mold entered complaint P-5568 stating they experienced severe gassing and part surface splay when using the gray Celcon color concentrate M90-07 CC 3063 K20 from lot 9051411. The concentrate met all specifi cations upon release and did not cause molding problems when let down at the proper 1:20 ratio with M90-04. The problem was referred to RTS for further evaluation to determine if an improper (Delrin) resin was used for let down or if abnormal processing conditions were being used. (DLD-211-79)
004168
RLB-54-79
-2- October 5, 1979
4. A complaint (P-5572) was entered by McCourtney Plastics Company indicating low physical properties on parts made from Celcon GC-25A natural from lots 9030211, 9052914 and 9053014. Samples of each of the lots were returned to the plant for testing.
Plant records showed the lots to all be specification materials. Analysis of the return samples confirmed the original analytical results. RTS was requested to visit the customer and determine his specific physical property requirements to allow resolution of this complaint. (DLD-207-79)
At month's end, four Celcon complaints are pending resolu tion.
B. Manufacturing Support
1. SH-2 Product Color - Moede
High "b" color values in SH-2 product from the end c^. : August through mid-September initiated an investigatri'on into the possible causes. The following potential problem areas were investigated and eliminated as the' cause of the color problem: (1) raw materials, (2) process parameters, (3) nitrogen quality, (4) excess TEA, (5) iron contamination and (6) aldol condensation products. It was discovered that rubber contamination in the quench tank from a deteriorating boot was responsible for the color. Replacement of the boot resulted in a return to normal color values.
2. Evaluation of T-302 Stripping - Moede
A trial to evaluate stripping trioxane out of the T-302 reactor column was completed September 26th. Reduction
of latent heat on the stripping section of the tower resulted in little increase in the trioxane concentra tion in the residue returned to the reactor and indicated . that the stripping section was not operating efficiently. It has been proposed that the trays be repaired so that stripping may be evaluated under efficient operating conditions.
3. Solids ,in T-305 - Moede
The T-305 finishing column was washed on September 20th due to solids build-up in the column after only three months of operation. A T-305 residue sample taken on the 17th contained about 20% solids by volume. Although an increase in residue draw-off reduced the solids (caustic salts) in the base of the tower, operational
004^69
r
RLB-54-79
-3- October 5, 1979
difficulties continued. The problem of caustic entrainment is believed to be primarily due to the difficulty in controlling caustic in the V-2003 caustic decanter. Improved control by the application of an on-line titrimeter is under consideration.
C. Status'of Fiberglass Evaluations (All Products) - Dotson
1. Amarillo Produced OCF Fiberglass Evaluation Trials
Shipments of OCF Amarillo produced fiberglass are cur rently under evaluation for qualification of this new facility. The status of these evaluations is as follows:
a. Celanex grade fiberglass, 419 N 911, 3/16 inch has
been evaluated in Celanex 3310 EF 3022. Evaluation
of this material showed it to meet all product
specifications and physical properties. This grade
of glass has been qualified for use in Celanex
glass filled products. (DLD-194-79)
^
b. Nylon grade fiberglass, 416 CB, 3/16 inch is in the plant and will be evaluated as soon as scheduling*.permits. (DLD-192-79)
2. Anderson Produced 419 BB 1/8 inch Evaluation^
As reported last month, this glass was re-evaluated for use in Celanex products as it had not been used in production since its original qualification in 1977. The glass was used to produce a lot of Celanex 3300 EF-2001. Although all product release specifications were met, tensile strength was judged to be somewhat low compared to normal production. Therefore, additional trials are planned with this glass before requalification.
3. Nittobo Fiberglass
Evaluation of the special Nittobo glasses is still pending arrival of the first shipments. Present shipment status for the Nittobo glasses is as follows:
a. 28M lbs. of the Celcon grade glass; CS-6PE231P, shipped from Japan on 9-21-79 with expected delivery by early November.
b.- 28M lbs. of the Nylon grade glass; CS-3J431 was shipped on 9-20-79 with the same expected delivery time.
c. In addition to the above, Nittobo has indicated that their 1/8 inch CS3PE-231N grade may be acceptable for use in our Celanex resins. The suitability of this material is under investigation.
004170
RLB-54-79
-4- October 5, 1979
4. Certain Teed Fiberglass
A shipment (10M lbs) of Certain Teed's 3/16 inch, XA4030A001 grade fiberglass has been ordered in prepar ation for plant evaluation in Celanex glass filled products.
D. Routine Analytical - Salinas
Sample count, overtime hours, holiday overtime hours, and formaldehyde feed concentration for September are summarized in Table I. The overtime hours for September were 396 compared to 272 in August. The sample count for September was 4538 as compared to 4906 in August. The overtime hours are as follows:
Technician vacation Sick relief Scheduled overtime Holiday Environmental Nucleant production Safety training Funeral leave Excused with pay
T4OTAL
--
--
--
--
--
-- --
--
--
80 30 120 72
9 40 13 24
8
396
Special analytical support was provided to the following projects:
1. TO-2 Reactor Performance - P. Moede 2. SH-1 Performance - P. Moede/J. Chancellor 3. T-243 Material Balance - J. Chancellor 4. U-10 Support - SH-1 & Natural Finishing
II. CELANEX
A. Customer Complaints - Dotson/Tijerina/Hemandez
1. Robinson Electronics complained (P-5573) that they experienced feed hopper plugging due to the large and variable size of the Celanex 3310 natural pellets (lot 9041661). A return sample was provided the plant for examination.
v
Plant release records show the lot to be specification material and the pellet quality and configuration to be typical. Examination of the return sample confirmed this initial inspection.
004171
RLB-54-79
-5- October 5, 1979
It should be pointed out, however, that the somewhat elongated shape of the Phase I produced Celanex pellets has resulted in complaints of feeding problems from other customers. Efforts are in progress to reduce the pellet size and produce a more uniformlyshaped pellet. (DLD-203-79)
2. A complaint (P-5561) was' entered by Republic Corp. stating that a shipment delay occurred when their order
of Celanex 3300 tan color (lot 9062741) was delivered to the Omega warehouse instead of to them.
The shipment error was verified and was found to have occurred at the Omega warehouse. The shipment for Republic was segregated from other materials to be unloaded at Omega but the entire shipment was unloaded by mistake. The complaint has been directed to Omega. (DLD-200-79)
III.
At month's end there are no outstanding Celanex complaints on file at the plant.
fj
NYLON
A. Customer Complaints - Dotson/Tijerina/Hemandez
1. Monofilaments Inc. entered the precautionary complaint, P-5563, stating that a 1% net weight loss was occurring per bag of Nylon 1200-1 natural due to pellets sticking to the bag liner. This weight loss throws off the customer's proprietary blending process. Samples of the bags were received by the plant for examination.
The. customer's complaint was found to be valid. The pellets when packaged fused to the polyethylene liner of the bag from being too hot. Steps have been taken to prevent a recurrence of the problem. (DLD-202-79)
2. Polymer Corporation stated- in complaint P-5559 that they had ordered Nylon N-269 in gaylords but received Nylon 1000-1 in bags instead. Plant records show 1000-1 was shipped at the direction of Distribution. Distribution has been made aware of the complaint. (DLD-201-79)
3. "A complaint (P-5564) was entered by Associated Mechanical Devices stating that one 1200 lb. gaylord of Nylon 1000-2 black was found to be regrind and off color material. The box was coded with a Deer Park lot number 8180512 and was part of a shipment of nine gaylords with the remaining gaylords from lots 9012371 and 815271. The gaylord in question was returned to the plant.
004172
RLB-54-79
-6- October 5, 1979
Examination of the gaylord confirmed the customer's complaint. Release data from Deer Park indicated this lot of material was specification product on release. Based on our examination, however, it appeared that pulverized rerun material was erroneously boxed under the lot number and was shipped. (DLD-199-79)
4. Nypro Inc. entered a complaint (P-5575) stating that a shipment of Nylon N-269 white from lot 9061331 had excessive black specks. The.shipment was returned to the plant.
The material was released as being within specifications although some black specks were present. Examination of one of the 50 lb. return bags however revealed the black speck count to exceed specifications. The customer's complaint is valid.. (DLD-210-79).
5. A complaint (P-5577) was entered by Reynolds Metal Company citing rejection of a shipment of Nylon N-186 due to poorly sealed inner gaylord liners. The lots involved in the shipment were 9062221 and 9062421--.
The plant accepted responsibility for the complaint as sealing problems had been previously identified (DLDHL56-79 and DLD-177-79) as having occurred during the time these lots were packaged. The problems have been corrected and extensive measures have been taken to insure proper and complete seals on all gaylord liners. (DLD-209-79)
6. Reynolds Metals Company also entered complaint P-5565 stating that widely varying pellet color was found in a shipment of N-186 natural from lots 9011721 and 9011021.
Release records showed the material in question to be free of color variability. Examination of our shipping retains revealed some minor pellet to pellet color variability but plaques' molded from the pellets were uniform in color and matched the original color values. No further plant evaluation could be made as return samples were not received by the plant. (DLD-208-79)
At month's end, three Nylon complaints remain open.
IV. INDUSTRIA_ L HYGIENE - Hancock, Pritchard
A. Formaldehyde Survey
The formaldehyde survey in the SH1/T01 area has been temporarily delayed due to the high priority of the ETOX survey. Previous sample results reveal several exposures to formaldehyde over the 1.5 ppm "action level". The survey will be continued, as will follow-up monitoring.
004173
RLB-54-79
-7- October 5, 1979
B. ETOX Survey
The survey for personnel exposure to ETOX continues. Samples are being taken in the SHI, SH2 and MH2 units. Sample results continue to indicate personnel exposures to ETOX are less than
1.0 ppm, 8 hr. TWA. The Celanese internal exposure limit for ETOX is 3 ppm 8 hr. TWA. The highest short term exposure found has been less than 5.0 ppm (obtained while collecting samples). The survey will continue for 2 weeks until all shifts have been monitored. A report will be issued.
C. Particulate - Mass Emissions Sampling
The particulate-mass emissions survey for the Plastics plant _has been completed. MS-1146 baghouse in 'the Celanex Unit
was sampled for particulate emissions during the September SEO production run. A final report has been written. These results will be used (by Mr. J. Garza) to complete the TACB emissions inventory. No further work is- planned at this
time.
D. Fugitive Emissions Monitoring
J||
The SHI unit was surveyed for fugitive emissions by the ! laboratory (J. Pritchard) and process engineering (J. GarSa) using the Century Organic Vapor Analyzer (OVA-128) and the diluter kit attachment. Pump seals, flanges, valves, etc. were monitored-for organic emissions as part of the monthly requirements by TACB. When the OVA method has been finalized, routine measurement of fugitive emissions will be handled
by the Maintenance Department.'
E. Asbestos Survey
Asbestos monitoring results from the August Celanex Unit SEO production run have been received from National Loss Control Laboratories. All .exposures were below the per missible exposure level of 2 fibers/cc. Asbestos monitoring continues in the Celanex Unit during the Sept.-Oct. SEO production run. A final report will be issued when the analytical results are received. No further "routine" asbestos monitoring is planned for the Celanex Unit until first quarter, 1980.
F. Analytical Load
The OSAH/Environmental analytical load, to date, is summarized below.
004174
RLB-54-79
-8- October 5, 1979
'
SHI/TO1 SHI/TO2 MH2 Nat'1. Finishing Special Products Celanex Nylon Chemical Co.
Month
OSHA
Environmental
35 66
34 0
13 0
00
00
61
00
00
88 67
OSHA 179 262 132 226 317 68 30 0
1,214
YTD Environmental 158 10 1 2 2 2 1 3
179
V. COLOR SERVICE - Artripe/Rothenberg/Harvey
General Summary
Color Service developed 29 color matches this month. The distri
bution of color match work for each marketing group was 12Celcon,
11 Celanex, and 6 Nylon matches; of this 9 Celanex, 4 Cel'con, and
3 Nylon were made or reworked from existing formulations.
fe - ' Color Service extruded and shipped one hundred thirty-three *133)
pounds o'f products.
:
A total of 350. chips were sent out in the process of filling 16 sample requests for chips only.
We have scheduled 18 color matches for October, leaving our back log of unscheduled work at 44. This backlog is for reformulation of existing formulas. Reformulation is necessary due to pigment obsolescence or chip replenishment. There are no new marketing
requests on backlog.
We received approval from Fisher Body for Blue WPH 7130 during the month.
This month we received 2 new color match requests from Fisher Body. This brings Fisher total requests to 12 for 1981 model
year.
Scheduled work for Fisher Body slipped behind in September due to failure of the KCS-18. In addition, fadometer testing slows the timing considerably.
Color Service work load remains very high although turnaround time decreased from ~ 28 to 17 days.
004175
RLB-54-79
,-9- October 5 1979
1. Flammability Testing/Method Update - Rothenberg/Harvey
Flammability testing (UL-94) was reviewed at Summit and Underwriters Laboratories, Melville, L.I. After observing equipment and techniques used for vertical bum testing, it is felt that correlation of test results between Bishop, Summit and UL should be excellent, although some testing differences were identified. Several parameters in testing were deemed especially important by UL, with the single most significant factor being draft conditions in the hood where testing is done. Bishop will slightly modify their test hood to more closely conform to UL's conditions.
2. Review of Physical Testing at Sxmimit and Bishop - Rothenberg/ Harvey
Physical testing at Bishop and Summit was reviewed. Overall, physical testing at both labs is very similar with procedures at both sites based on ASTM test methods. While some dif ferences were found in test specimen conditioning, a major difference in determining tensile yield and break of unfilled ~ Celanex was discovered. For the past" several years, Bisfeop has run this material at a crosshead speed of 0.2 inchesvminute. Summit runs this material at a crosshead speed of 2.0 in'ches/ minute. When determining tensile properties, an increase--in crosshead speed will increase tensile strength and decrease elongation.- This difference is being discussed with Summit personnel and a uniform crosshead speed will be agreed upon. (RGR-78,79-79)
3. Celanes Color Information- - UL All-Color Approval - Rothenberg
Information on black, white, and red Celanex color formulations having the highest level of organic and/or inorganic pigments was furnished to A. Serle (Summit). This data will be used to obtain UL approval for new Celanex products recently introduced to UL. (RGR-80-79).
4. Addition to Approved Pigment List - Rothenberg
Sun Chemical "Sunfast" Carbazole Violet 246-1670 organic pigment has been approved. This pigment is necessary for color formulation work in Celcon (General Motors colors) and is classified as a carbazole dioxazine violet pigment.
5. Black Nylon - Rothenberg/Artripe
Extensive work is being done with black pigments and dyes to find a replacement for Neozapon Black RE dye in Nylon. Neozapon Black RE turns to a blue-black at high processing temperatures and is expensive to use, with .the current price at $12.05/lb. Data is still being evaluated and compiled. A report will be issued.
004176
r
RLB-54-79
-10-
,October 5 1979
VI. PERSONNEL '
P. J. Moede attended a corporate sponsored seminar on college recruiting September 23rd - 25th in Charlotte, N.C. Ms. Moede will be an alternate campus recruiter for the coming year.
R. G. Rothenberg conducted a series of safety meetings for the department on Safety in the Color Lab and Pigment Handling.
RLB:slh Attachments
004177
4f-OJ C<DO O Q. o i--1 co rH m 00 <r ON o CO co co o o
4-
O.
o iH o o m CO
rH CM rH rH
rH
*
'd* o CO rH CM o o rH o iH
in
tH
m oo - r-.
p
>* o
u <D
a
S
a> u
Qor
/>
t--i <r o p- r** in <n <N o 00 00 o o 00
in m r^. m d* CM CO CM
*<r m in
CM
-d* <J\
. <r CM m CO CM
H
m
m
cl aa).
fSd ,J-->>
00
fd c
4->'--^ O
3
O CC
3
0 a:
1 c o
'SI
r0H
a CO
o
<0
oo in ID
fr-
mm
I QC)
C *r* O 4-> SC 3
O 3
s oao
ao:
(d H
o
<u Ic
C *r* O -H
"3 o
a </v <u
3
QoC
CM CM
in
CO i-l CM tn|o> co
oo
On o
oo <r <r oi
a- m <r
CO CM m
CO CM m
oOa
r-- z
J3o:OZooz
*zr-
-osJ
Z *H CO o T|fc
- fi*1"
CM CM
CM CM
<a>J
0>) <
&b >
CM
CM
-u<<auy.
*<ou 0 u. a
o
-
O
o"T** oz
zooz
c NM a
CM CM CM CM CM CM
id H O
rH m <r
m ON
o p-
p m
r>CM
m CM m
m co co
-'C
o
a
0)
0) I c
o C *ro
S3
ON m rH
m o m
<T oo F-i
CM CO rH
o
o
o
Qo
oQo. aj
CM oo \n m p* m m OO <r -00 CM a- CM CO CM <r CM CO CM m CO
'
o oo 00 m
rH ooo
o OO 00 d" m rH
o vO <r r^. co
o iH ON ON
om m p CM
CO
cr _J
c r*
4i-n3
<c f--
. *
JC U l/> 3 r* "O Co
4. LU o.
r*
r(*/)
4-> id
c
id
u aj
X a. 4J
a H*
f--m 1
o
CM 1
o h--
r--m 1
Z CO
CM I
jz CO
CM 1
Z s
<T3 S43-> id z
Cd r* O 0J a CO
a> c r--id a> o
4-3 o r a.
id s 3id o;
c o o cr z
in s. a> j= aO
QE-i
><
p'. in ooon cpo~
CM
co
p* CM CO
U
<r cm
ccmo r-
m ON CO
&
a>
54fa-J4)
o>
i--MJI Tc3tf oOa3n)O-si-oHM
<HJJ
O H
s H
&0
.CSoC
_
Gross Production Total Packaged Off
Specification Quality Waivers
TABLE II Celcon Quality Summary
September
M Lbs
Percentage
7016.6
100.0
2182.0 2135.7
' 31.1 30.4
Year to Date
M Lbs
Percentage
65428.3 * 19510.6
16513.8
100.0
29.8 25.2
TABLE III Celcon Experimental Products
Product
C155 C240A C243 C251 C267 C271 C272
Production
66600 232915 136350 :
79200 12000
5650 15450
Release
66600 232915 136350
79200 12000
5650 15450
004179
TABLE IV Analysis of Celcon Packaged Off Specification
Natural Finishing - September
Defect
Lots
Quantity M Lbs
Melt Index
7 761.9
Discolored Pellets 2 347.8
Black Specks
3 383.8
Stabilizer Content 1 179.6
Ash Content
2 66.6
Natural Color
3 346.0
Ext. HCHO
1 39.4
10X Melt Index 0 0
Kd 0 0
Volatiles
0 0
Off Size Pellets
2 327.7
% of Total Natural
. 11.8 5.4 5.9 2.8 1.0 5.4 0.6
0
0 0 5.1
% of Quantity Total Lots M Lbs Natural
90 7963.9 27 1517.0 36 3355.4 20 1293.0
3 94.9 26 2310.9
6 191.4 3 56.1 6. 532.1 6 205.8 8 1242.3
15.0 2.8 6.3 2.4 0.2 4.4 0.4 0.1
1.0 0.4
2.3
Special Products - September
Defect
It Index L .colored Pellets Color Match Off Size Pellets Colored Pellets
(Contamination) Volatiles Stabilizer Content Kd Black Specks Tensile Strength Natural Color
(Glass Filled) Ash Content
Lot
2 1 2 3
1 1 0 2 0 0
1 0
Quantity M Lbs.
21.7 3.0 4.8
26.3
13.8 2.4 0
36.7 0 0
14.8 0
% of Total
S. P.
Lots
Quantity M. Lbs.
' ft-
' Jf'of To,,tal S:. P.
3.7 . 86 0.5 21 0.8 23
4.5 53
1231.4 209.0
141.5 676.4
9.9
1.7 1.1 5.4
2.3 7 39.0
0.4 11 146.1
0 13 424.4
6.3 31 214.4
01
9.4
0 21 299.1
0.3 1.2 3.41.7 0.1 2.4
2.5 26 364.6 0 5 38.4
2.9 0.3
004180
F
TABLE V Celcon Releases
Formulation
Releases
Quantity
(M Lbs.) .
Lots
Sept YTD
Sept
YTD
M9000 Flake
0
M9001 Flake
806.6
M27000 Flake
0
M2501 Natural 273.6
M2504 Natural 183.3
M2514 Natural
0
M50 Natural
101.0
M9004 Natural 3806.0
M9014 Natural 471.6
M90210 Natural
0
M14014 Natural
0
C143 Natural
235.0
M27004 Natural 465.0
M27014 Natural
0
U1011 Natural
14.4
M2501 Color '
0
M2504 Color
0
M9004 Color
65.8
M9014 Color
0
M9008 Color
3.5
M9008 Natural
22.0
M9034 Color
43.5
M14014 Color
0
C143 Color
25.2
M27004 Color
0
M27008 Color
20.9
M27014 Color
6.3
M2504 Black
57.5
M9004 Black
0
M9014 Black
23.2
C143 Black
0
M27004 Black
0
M27014 Black
0
U1011 Black
0
GC25A Natural
83.6
GC25A Black
0
M9007 Color
39.8
M9007 Black
32.5
Salt & Pepper 63.5
C155
66.6
C234A
0
C240A
232.9
C241
0
C243
136.4
C244
0
C251
79.2
C252
0
C2S4
0
C255
0
C257
0
C267
12.0
C271
5l6
C272
15.4
C273
0
C300
0
C301
0
TOTALS
7391.9
26.8 2202.8
24.9 1154.7 1780.1
25.7 101.0
28678.9 3263.8 178.6 172.8 3524.3 3182.9 1788.8 504.0 21.8 56.0
1669.1 22.6
101.8 261.2 358.6
93.4 174.2
110.0 281.3
6.3 216.7 2507.2
577.7 236.2 380.6
30.9 65.2
887.1 1613.2
265.7
247.9 1238.8
191.3 964.3 735.5
64.7 781.8 3275.9 466.8 176.4
12.6 5.0
12.0 62.9
5.6 15.4
5.4
1007.5 542.6
66359.3
0 3 64 182
02 2 19 1 29 '0 1 22
30 236
3 34 06 02 2 40
3 23 0 29
1 19 02
03 10 158
03 1 10 2 17 3 21 07 3 24 0 11 4 * 46 11 4 19 0 74
1 30 0 16 0 17 02
05
7 67 0 71 12 76
3 13 5 90 2 '7 0 35 26
04 1 12 0 38
19 02 01 01 01 16 11 11 01 0 10 05
173 1550
Quality Waivers
Quantity
(M Lbs.)
Lots
Sept
YTD
Sept
YTD
159.2 570.3 1045.3
936.1 7937.9 379.3 1239-.5
85.1
156.8 14.4
746.2
335.5 341.1 427.1
35.9 2.5 274.9
1.9
14.2 177.3
34.9 2.6
86.6
13.5 23.2
105.5 373.4
293.9
16.1 69.7 16.4
14.8 317.4 12.7
66.6 151.9 143.0
232.9 326.7 18.2
136.4 399.0
622.6 285.6
1 10 15
7 62 2 12
3
17 3 8
1 16
2 1 .28
1 'V
1 10
6 i 7
14 10
1 13 1 4 1
1 23 1
25 5
23 1
14 9 4
*.
2135.7
5.4 *
16513.8
21
1 281
Z Color Black
Other Glass Filled Natural
Concentrates
Month T75I
1.09 11.77
1.13 82.50
0.98
YTD 4776 7.52 5.26 3.77 77.92
0.77
QUALITY WAIVERS
Month 28.9
YTD 24.9
Gross Production
Total Packaged Off Specification
Quality Waivers
TABLE VI Celanex Quality Summary
September M Lbs. Percentage
Year to Date
M Lbs.
Percentage
1,699.9
100.0
17,786.3
100.0
118.3 50.3
6.9 3.0
1,553.8 934.8
8.7 fe5.3
R-
004182
TABLE VII Analy sis of Celanex Packaged Off Specification
Defect . Flammability Discolored Pellets Ash Content Off Size Pellets Volatiles Contamination
'.or Match ` Unfilled Pellets
Lots 1 0 3 0 0 2 0 0
September
Sof
M Lbs
Production
30.7
1.8
00
73.1
4.3
00
00
14.4
0.8
00
00
Year to Date % of
Lots M Lbs Production
`16 404.5
2.3
5 52.3
0.3
30 671.8
3.8
2 62.8 k0A
r1 39.4
0.2
8 141.4' : 0.8
7 95.3
0.5
3 101.5
0.6
004183
TABLE VIII Celanex Releases
Formulation
2000 Natural 2000-2 Natural 2002-2 Natural 2012 Natural 2012-2 Natural 3200-2 Natural 3210 Natural 3210-2 Natural 3211-2 Natural 3300 Natural 3300-2 Natural 3310 Natural 3310-2 :Natural 3311 Natural 3311-2 Natural 2002-2 Black 3200 Black
210 Black 10-2 Black
^00 Black 3300-2 Black 3310 Black 3310-2 Black 3311-2 Black 3300 Color 3300-2 Color 3210-2 Color 3310 Color 3310-2 Color 3311^2 Color J225 J226 J227 J228 J240
TOTALS
Releases Quantity (M Lbs) Sept YTD
Lots Sept YTD
0 0 30.1 74.3 29.9 0 81.2 54.0 .0 281.4 0 95.1 71.4 0 0 7.0 56.4 60.5 0 624.6 0 82.2 61.9 0 105.8 0 0 38 ..0 0 0 0 0 0 0 0
1753.8
25.9 326.2
48.5 322.8
209.3 38.9
1230.6 316.2 39.5
4251.7 102.5
2105.8
566.1 15.0 47.0 7.0
463.4 324.0 102.2
4780.5 29.6
486.3 251.7
54.4 380.8
41.6 21.1 160.7 144.6 53.7
9.7 7.5 13.0 13.0 4.4
' '
16995.2
0 0 3 6 3 0 2. 2 0 11 0 5 2 0 0 1 2 2 0 8 0
.1
2 0 7 0 0 3 Q 0 0 0 0 0 0
61
2 31
5 26 20
1 60 16
1 143
3 89 25
1 1 1 14 15 5 63 2
27 14
2 29
3 1 11 9 4 1 1 1 1 1
635
Quality Waivers
Quantity
(M Lbs)
Lots
Sept YTD ' Sept YTD
30.4
2
50.3 402.8
91.3 -68.4
*
2 12
te p:
-6 3
`
19.5 25.5 194.2
34.7 20.4
47.6
1 1 5
2 1
4
*
50.3 934.8
4
2
37
QUALITY WAIVERS
2.9 Month
5.5 YTD
004184
*
Gross Production Total Packaged Off
Specification Quality Waivers
TABLE IX Nylon Quality Summary
September
M Lbs
Percentage
1475.0
100.0
536.4 466.6
36.4 31.6
Year to Date
M Lbs
Percentage
21171.7
100.0
7811.7 6569.5
36.9 31.0
TABLE X Nylon Experimental Products
Product
N224 N265 Nat. N265 Black N269 N276 Nat. N276 Black -N277 Nat. N277 Black N355
Production
294895 17950 21300
16966Q 12350 2050 '9250 5950
134065
Releases
294895 17950 21300
169660 -- 2050 9250 5950
134065
tfel .
l
004185
TABLE XI Analysis of Nylon Packaged Off Specification
Defect Relative Viscosity Volatiles Ash Content Discolored Pellets Off Size Pellets Natural Color
od Impact Nucleant Copper Black Specks AEG Iodine
Lots 12 13 3 3 0 3 0 0 0 .2 0 0
September__________________________
Year to Date
% of
% of
M Lbs '
Production Lots M Lbs Production
189.6 274.3
12.8 18.6
191 3799.9 150 2931.5
17.9 13.8
28.6
1.9
15 256.6
1.2
25.7
1.7
16 . 150.7
0.7
0 0 29 578.4.. 2.7
82.3 0 0
5.6
.. o
0
33 719.9 r-- 3.4
14 316.9
1.5
15 293.1
1.4
0 0 2 42.5 0.2
42.5
2.9 7 86.0 0.4
0 0 1 21.6 0.1
0
0
2 ' 39.3
0.2
i
004186
TABLE XII Nylon Releases
Formulation
Releases
(M Lbs) SEPT YTD
Lots SEPT YTD
Quality Waivers
Quantity
(M Lbs)
Lots
SEPT YTD
SEPT YTD
1000-1 Natural 1000-2 Natural 1000-4 Natural H)03-l Natural 1003-2 Natural 1200-1 Natural 1300-1 Natural 1310-1 Natural 1310-2 Natural 1310-4 Natural 1400-2 Natural 1403-2 Natural 1500-2 Natural 1503-1 Natural 1503-2 Natural 1600-2 Natural 1603-2 Natural 1000-2 Black 1003-2 Black 1310-2 Black . : 1503-1 Black '
13-2 Black i 3-2 Black 1503-2 Color
1603-1 Color 1603-2 Color
N181 N184 N186 N198 N224 N243 N245 N249 N265 Natural N265 Black N269 N270 N273 N276 Natural N276 Black N277 Natural N277 Black N355 N357
TOTALS
140.2 44.9.1
41.0 0 0 0 0 0 0 0 0 0 0 0
526.1 0 0 0 0
`0 0 0 0 0
21.6 0 0 0 0
0 294.9
0 0 0 17.9 21.3 169.7 0 0
-o
2.0 - 9.2
5.9 134.1
0
1833.0
768.5 2457.9
833.4 553.2 1064.4 448.7
58.0 33.0
1528.3 616.9
63.0
32.9 357.7 284.3 1792.3 103.0
24.9 529.0 532.6 621.0
39.2
2378.3 108.8 72.6 442.1
12.6 830.8
62.0 443.2
41.2 1881.0
782.4 212.8 - 17.0
22.8 . 21.3 691.7 192.5 147.5
4.7 2.0 15.0
15.4 1001.5
315.6
* `
* '
22457.0
7 38 66.3
21 122 127.0
2 42
0 27
0 54
0 42
03
02
0 75
0 29
03
01
0 12
0 9.
25 73 * 264.1
04
0 1
0 34
0 30
0 33
01
0 . 73
0 .4
06
2 36
01
0 - 40
0 .4 .
0 46
02
14 92
0
, o-
39 11
02
2 2
3 2
8 34
09
07
01
1 1*
1 2 9.2
12
7 52
05
93 1111 466.6
211.4 513.8 116.4
181.8 228.7
22.0 228.2 207.0
130.7 252.2 1336.8
74.7
456.6 450.7 400.9
39.2 847.9
42.9
26.7 12.6 21.6.
71.4
85.3 272.3
9.2
290.1 38.4
6^69.5
3 6
13
"P
l 23
10 26
6
9 21
1 11 10
4 7 51 2
31 25 21
1 26
2
2 1 1
7
4 14
1
15 1
310
QUALITY WAIVERS
25.4 Month
29.2
YTr 004187