Document bayNVyLG102B1ppyV5XpJYX4k

r, . Monsanto "o" ,H*ME * location e. Boucher, W. G. Krummrich Plant DATE : SUBJECT REFERENCE TO :;i January 11, 1974 GENERAL ELECTRIC HUDSON FALLS, N.Y. CONTAMINATED AROCLOR 1016 J. R. Savage General Offices B2SL * cc W. C. Engman G. L. Johnson A. E. Leisy D. K. Lynch Recommendation We have been asked to rework 30,000 gallons of Aroclor 1016 containing about 0.4% Unox 4-206 diepoxide and contaminated with up to 0.2% DOP. We recommend WGK not rework this contaminated Aroclor 1016. The long department rework time (2-3 months) would cause problems, the recovery is poor, and costs are high - $55,000. We cannot guarantee quality Aroclor 1016 will be made. The Aroclor would need to be porocel treated at General Electric. Discussion Dan Lynch provided process details. Rework involves con tacting Aroclor 1016 with 93% Sulfuric Acid (10% by weight), neutralized with caustic followed by a water wash, dehy dration, and then distilling over lime. Our rework facilities consist of #1 Still and Receiver, Blend Tanks #1 and #2, and #1 Mix Tank. The existing 10,000 gallons of distilled residue in #1 Mix Tank must be removed. Our Corrosion Group warned us that we may lose the zinc-tin lining in our Blend Tanks because of the acid-caustic treatment. The steel transfer lines must be replaced with aluminum piping. Also drumming facilities are needed for montars. To avoid cross contamination of other department materials porocel treat ment is not possible. Cost of modification is $35,000. Construction time is estimated at 3-5 months. Using #1 Still for reworking a large amount of material presents a labor problem. We do not want to create a permanent job. Therefore the rework will be done on over time. Each 1000 gallon batch will require two shifts with two men per shift. Rework 30,000 gallons is expected to take 2-3 months. 29?6o9 STLCOPCB4067520 4 ) Mr. J. R. Savage GENERAL ELECTRIC, HUDSON FALLS, N.Y. CONTAMINATED AROLCOR 1016 Page 2 1/11/74 WGK sf Cost Cost breakdown is as follows: Material Incineration Fuel Labor Lab TSD Research Expense $2200 2200 100 11,000 1,400 1,100 2,000 35,000 Total $55,000 Recovery cost/cwt = $55,000 280,000 # x 100 # = $19.64 Timing - It would take at least 7 months to rework the Aroclor after approval is given. . /tm Kenneth E. Boucher Technical Services Department DSW 297610 STLCOPCB4067521